Text
Docket No.:
50-275 DEC 1 t982 Distr ibution:
'Document Control~
NRC PDR L PDR PRC System NSIC HSchierling GKnighton JLee ACRS (16)
LChandler, ELD Taylor, IE
- Jordan, IE DEisenhut LB¹3 File HDenton'Case REngelken RVollmer JKnight PKuo HPol k
Dear Hr. Crane:
HHartzman At the October 20, 1982 Commission meeting on Diablo Canyon the staff indicated that their consultant, Brookhaven National Laboratory (BNL), would be requested to perform a limited number of additional independent analyses.
In this regard.
a discussion of the BNL effort was provided in Enclosure 2 of SECY Paper 82-414 dated October 13, 1982.
Attached is a list of the drawings and data that have been identified as necessary to perform the intended analyses.
l<e request that you provide us with this infomation as soon as possible.
Please advise us promptly if any of the requested information can not be provided within 2 weeks after receipt of this letter.
The purpose of the BNL analyses are to provide the staff with additional insight as to the character of results obtainable by use of state-of-the-art analytical techniques without regard to methods or procedures previously approved in the licensing process for Diablo Canyon.
These analyses are therefore not intended as a substitute for the design and evaluation efforts now underway for the Diablo Canyon project; nor are they a substitute for the analytical-- efforts being performed by the Independent Design Verification Program (IDVP).
Our experience has
- been, however, that such analyses often provide the bases for judgements that expedite the review process.
Sincerely, I 82i2080697 82120i PDR ADOCK 05000275 P
PDR Encl osur e:
As stated O i<isisigneabV QELTeygU. Go EiS Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation cc:
See next page gee fovo~>
OFFICEI SURNAME/
DATE Q DL:LB¹3 HSchi erl in'1/IR/82
~ ~ ~ e ~ oooe ~ ~ ~
~ ~ ~ ~ ~
~
G i
to
.PE, l.QK.....
JPKn ht
~
~
DL.
~
~
oo
~ ooooooo ~ e ~
ol}
~ ~ ol ooo
/a82oo
~ ~ o
~
~ ol Qi+82ooo
~ o ~ ~
~ ooooooooooooooooooooooo NRC FORM 318 u0-80) NRCM 0240 OFFlCIAL R ORD COPY USGPO: 1981~990
~t
~.
fp.
t J
P 11 l
s s
Docket No.:
50-275
,Phil:ip A. Crane, Jr.,
Esq.
Pacific Gas and Electric Company P. 0.
Box 7442 San Francisco, California 94120
Dear Mr. Crane:
,istribution:..
ocument..Control NRC PDR L PDR PRC System NSIC LB¹3 Fi1 e JLee HDenton ACRSg 6)
ECase LC andler, ELD REngelken
- yor, IE RVollmer
- Jordan, IE JKnight DEisenhut PKuo HPol MHa zman H chier ling Knighton The participation of Brookhaven National Laborator (BNL) in the Diablo Canyon design verification effort as a staff cons ltant was discussed at the Commission meeting on October 20, 1982. /Details of the BNL effort provided in Enclosure 2 of SECY Paper 2-414 of October 13, 1982.
Attached is a letter from BNL to the NRC p<hich includes a:request for structural drawings, for other material needed for structural analysis and items needed for piping analysis.
le request that you provide us uith the information identified as spun as possible.
Please advise us promptly if any of the information cannot be submitted within two weeks after receipt of this letter.
Sincerely,
Enclosure:
As.'tated Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation cc:
Se next page DL:LB¹3 Schierli p
OFFICE/
SURNAME$
PATE IP
./ al9io j'gg o ~
DL:LB¹3
~
~ 0 ~ ~ ~\\ ~ ~ ~ 0 ~I ~ ~
~ ~ ~ ~ ~ ~ ~
GKnighton
~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 ~ ~ ~ ~ ~ ~ ~ ~ 0 ~
1 1/
/82 DE:AD:SE
~
~ ~
~ ~ ~ 00 ~ ~ ~ 0 ~ 0 ~ ~ ~ ~ 0 ~ 0 JKni ght
~ ~ ~ ~ 0 ~
~ ~ ~ ~ ~ ~ ss ~ 0 ~ ~ 0 ~ ~
11/
'/82 DL:AD:L TNovak 11/
/82
~ ~ ~ ~I ~\\ ~ ~ ~I~ ~ 0
~ ~ ~ ~ ~ ~ ~ 0 ~
DL: DIR DEisenhut
~ ~ ~ ~ ~ ~ 0 ~ ~ ~ ~ 0 ~ ~I~ 0 ~ IHO~ 0 11/
/82
~ ~ ~ ~ ~ 0 ~ 0 ~ OOttIO ~ 0 ~ 0 ~ 0 ~ ~I NRC FORM 818 u0-80) NRCM 0240 OFFICIAL RECORD COPY, USGPO: 19S1~960
0 t
l 1
I
'le f~
I!
cc:
Mr. Richard Hubbard MHB Technical Associates Suite K
1723 Hamilton Avenue
. San Jose, California 95125 Joel
- Reynolds, Esq.
Center for Law in the Public Interest 10951 West Pico Boulevard Third Floor Los Angeles, California 90064 Herbert H. Brown, Esq.
Hill, Christopher
& Phillips, P.C.
1900 M Street, N.
W.
Washington, D.
C.
20036 Bruce Norton, Esq.
Suite 202 3216 North 3rd Street Phoenix, Arizona 85012 David F. Fleischaker, Esq.
P. 0.
Box 1178 Oklahoma City, Oklahoma 73101 Mr. Georg A. Maneatis
~.Pacific Gas
& Electric Company P. 0.
Box 7442 San Francisco, California 94120 Dr. Jose Rosset 3506 DuVal Road Austin, Texas 78751 Dr. Morris Reich Structural Analysis Division Brookhaven National Laboratory
- Upton, Long Island, New York 11973
0
, ~
Diablo Canyon Nuclear Power Plant Structural Drawin s
Re uest
. 438232 Interior Concrete Outline Plans at El 74'-8" 8 91'0" Contairment Structure Rev.. 10 438233 Interior Concrete Outline Plans at El 124'-0" 5 140'-0" Containment Structure Rev.
12 438234 Interior Concrete Outline-Main Sections Containment Structure Rev.
12 438235 Interior Concrete Outl ine Mi seel laneous Sections Containment Structure Rev.
6 438239 Interior Concrete Reinforcing Slab at El. 91'-0" North Contaireent Structure Area F
Rev.
5 438240 Interior Concrete Reinforcing Slab at El. 91'-0" South Containment Structure Area G
Rev.
6.
438274 Interior Concrete Details Reactor Nozzles Area Containment Rev.
4 Structure 438276 Detailed Plans at El ill of Steam Generator Supports Containment Structure Rev.
7 438278 Reactor Coolant Pump Supports at El 106 Containment Structure Rev.
5 438280 Pressurizer Support Containment Structure Area F
439571
. Equipment Supports Plan Below El 113 Containment Structure Areas F 5 G
P Rev.
4 Rev.
8 439572 439573 438135 Layout of Lateral Support for Steam Generators at El 139'-0" Containment Structure Areas F. 5 G
Steam Generator Support at El 139'-0" Contaireent Structure Area F
8 G
Requirement for 40,000 Gal. Diesel Fuel Oil Storage Tanks Rev.
2 Rev.
6 Rev.
6
- It is understood the revision shown is the latest.
If not, provide the latest revision.
~ 'j f
Re uest for Other Material Needed for Structural Anal sis 1.
Equipment mass data similar to that attached to PG8E letter to J.
Blume
'dated 9/13/82.
Ref. Diablo Canyon Unit i Contairment Structure.
2.
Geotechnical Studies Intake Structure,
=>later Storage Tanks Diesel Fuel Oil Storage Tanks Diablo Canyon Nuclear Power Plant San Luis Obispo County Conf.,
HLA Job No. 569,031.04, Harding-Lawson Assoc., April 12, 1978.
3.
Letter report from Harding Lawson dated October ll, 1982 updating the above (2) report.
7175360 51 series Vertical Steam Generator Outline Sheets 1 of 2 and 2 of 2 Bechtel "'s DC-663206-27-1 and DC-663206-1-10 5.
6.
The following sections are required for the polar crane:
(a) through the horizontal girders (b) at the top of the columns.
c) at the bottom of the columns
'he horizontal Newmark HOSGRI 7.5 M digitized time history for the Reactor Containment Building (cards plus'printed copy of cards).
- 7. '"-"Horizontal surface HOSGRI 7.5 M Newmark digitized time history (cards plus card listing) for the buried diesel oil tank.
8.
Latest sketches and/or drawings of modificati'ons to the connections of the annulus structural steel.
~ 9.
Total weight and weight distribution o$-the steam 'generators.
I f
J 4,
~
~
Q
/
4 eA Items Needed for Pi in Anal sis A PG8E piping document package or its equivalent and computer input-output, listings are requested for each of the following Diablo Canyon Nuclear Power Plant, Unit 1 piping problems; A) PGKE:No.
B) 6-102 (6-11)
C) 8-116, 8-117;-,8-118 D) Westinghouse Problem RHR Loop 4 (6-4, 6-7)
The document packages to include at least; 1.
walkdown isometric 2.
Hosgri envelope spectra 3.
thermal and pressure operating modes from DCM-M-46 4.
building displacements from DCM C-28 5.
pipe s'pecification and material data 6.
support descriptions 7.
equipment movements if appropriate 8.
applied spring forces if appropriate 9.
list of data preliminary in nature and and subject to change Please note the data requests for Problem No. 4A-122 and 6-102 will be used to upda.e-the BNL calculations for Problem No. 4A-26 and 6-11.
The data requests for Problem 1-10 and the RHR Loop 4 will be used to perform two new confirma-tory piping evaluations as per SECY-82-414.
In addition the following general information is requested:
1.
Piping Reverification Analysis Log 2.
Westinghouse Piping Analysis List 3.
Stress Combination and Criteria DCM M-42 4.
ME 101 Computer Code Manual
0 l
Cj h