ML16340C259

From kanterella
Jump to navigation Jump to search
Advises of Inherent Problem W/New Four Wire Emergency Notification Sys Telephone Circuit.To Prevent Lockup, Facility Should Ensure That Second Call Is Not Established within 20-s After Original Call Is Terminated
ML16340C259
Person / Time
Site: Diablo Canyon 
Issue date: 01/21/1982
From: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Crane P
PACIFIC GAS & ELECTRIC CO.
References
NUDOCS 8201290428
Download: ML16340C259 (4)


Text

Docket No. 50-275 Pacific Gas

& Electric Company P. 0.

Box 7442 San Francisco, California 94120 JAN 3 g tgg(

IZHg gZgg g(j~>>

Attention:

Nr. Philip A. Crane, Jr.

Assistant General Counsel Gentlemen:

~ECEIVpo S

~<N 28 1g8pe]2 DC An inherent problem has been discovered with the new (4 wire)

Notification System (ENS) telephone circuit.

The problem is described below along with a simple method of prevention which should be used until telephone engineers complete equipment modifications.

After a call has been established (the originator of the call makes no difference) and terminated on the ENS circuit, the telephone circuit for the facility called will "lock up" if a receiver is picked up at that facility before

'the circuit light is off.

This results in the facility not being able to call out on the ENS circuit and the NRC Headquarters not being able to call the facility. After "lock up" occurs a telephone serviceman will be required to disconnect and reconnect the phone circuit at the Headquarters switchgear.

For example:

The NRC Headquarters calls an operating power reactor plant for daily plant status.

The reactor facility answers the call and gives the necessary information, after which, both parties hang up.

The faci'lity operator, realizing that he forgot to give some item of information quickly picks up the ENS phone in an effort to catch the NRC Headquarters before Headquarters hangs up their phone.

This type of action results in "lock up".

To prevent "lock up" from occurring, the facilities should ensure that a

second call is not established within 20 seconds after the original call has terminated.

NRC Headquarters will be monitoring all ENS phone line indicators 'and will inform the facility when lock up occurs and provide a cormercial phone number to use to contact NRC Headquarters.

In addition, the NRC will contact the telephone company and initiate the necessary action to release the "lock up".

E 820i290428 820i2i PDR

  • DOCK 05000275 F

PDR RV/d OFFICE)

SURNAME)

DATEP CREWS

""I'/'j(/82'

~ ~ ~ ~ ~

~

~ ~ ~ ~

~

SPfifCER

'1')jj)52-'---

~

~

~ ~

~

B

~ ~

~ ~ i ~ ~ \\ ~ \\ i ~ ~ ~

~

1/tf/82 1/A/82 N

ERG 1

~ ~ ~

~

~

~ ~ ~ ~

~ ~ ~

OWN 1i/P/82

>AGE<<E 1/4'/82

~ ~il pi ~ ~ i ~ ~ ~ ~

NRC FORM 318110/80)NRCM 0240 OFFICIAL RECORD COPY

  • USGPO: 198~29.824

~ 4

/,/

Il

'I II

Pacific Gas 8 Electric Company Q)

JAN 2g 198(

Telephone company engineers have found a solution to permanently correct the "lock up" problem.

Until the "fix" can be applied, we will appreciate your cooperation in helping us minimize ENS phone circuit "lock up" so that the integrity of the Emergency Notification System will not be )eopardized.

Sincerely,

~>RR SfMKg g~

R.

H.

EngeB<e%

Regional Administrator bcc:

DMB/Document Control Desk (RIDS)

Distributed by RV:

State; Resident Inspector;-RHE J. L. Crews; G.

S.

Spencer; H.

E.

Book; D.

M. Sternberg; K. Scown

C b

h

'