ML16340C058
| ML16340C058 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 10/07/1981 |
| From: | Book H NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Crane P PACIFIC GAS & ELECTRIC CO. |
| Shared Package | |
| ML16340C059 | List: |
| References | |
| NUDOCS 8111020494 | |
| Download: ML16340C058 (4) | |
See also: IR 05000275/1981021
Text
October 7,
1981
Docket Nos.
50-2
5
- 2
Pacific Gas and Electric Company
P.O.
Box 7442
San Francisco, California 94106,
Attention:
Mr. Philip A. Crane, Jr.
Assistant
General
Counsel
Gentlemen:
~4/pp'
'rm
~i j l~L~K
Subject:
NRC Inspection - Diablo Canyon Units 1,
2
This refers to the inspection conducted
by Mr. D. M. Kunihiro, Team
Leader,
and other
NRC team members
on August 19,
1981 of activities
authorized
by NRC Construction Permit Nos.
CPPR-39
and
CPPR-69
and to
the discussion of our findings held by Mr. Kunihiro with Mr. Jim Shiffer
and other members of your staff,at the conclusion of the inspection.
Areas examined during this inspection are described in the enclosed
inspection report.
Within these areas,
the inspection consisted of
selective examinations of procedures
and plans
and observations
by the
NRC team members.
No items of noncompliance, with kRC requirements
were identified within
the scope of this inspection.
In accordance with 10 CFR 2.790 of the Commission's
regulations,
a copy
of this letter
and the enclosed
inspection report will be placed in the
NRC's Public Document
Room.
Ifthis report contains
any information
that you believe to be exempt from disclosure
under
10 CFR 9.5(a)(4), it
is necessary
that you (a) notify this office by telephone within ten
(10) days from the date of this, letter of your intention to file a
request for withholding; and (b) submit within 25 days from the date of
this letter
a written application to this office to withhold such infor-
mation. Ifyour receipt of this letter has
been delayed
such that less
than seven
(7) days are available for your review, please notify this
office promptly so that
a new due date
may be established.
Consistent
with section 2.790(b)(1),
any such application must be accompanied
by an
affidavit executed
by the owner. of the information which identifies the
document or part sought to be w/thheld, and which contains
a full statement
8x LX 0@0
gp
RV
OFFICE/
SURNAME)
DATEP
~
I
~
Po ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
h
R. Fish
10/5
/81";
~ ~ ~ ~ i ~ ~ ~ ~
s
~ ~ ~ ~ ~ ~
D.Ku i
ro:
10/
NRC FORM 318110/801 NRCM 0240
~ ~ ~
~ ~ ~ ~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~. Ci 1 1 is
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~ t
~ ~
FsWenslawski
0 ~
~ ~ ~ ~ ~ ~
co
10/ k /81
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
10/ 5
/81
10//~/81
~ ~ ~ ~ ~ ~ Pft ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
OFFICIAL RECORD COPY
~ ~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~
H.
ok
10/ 7 /81
I \\ ~ ~ ~
- USGPOl 1980-329.824
a<
~ly / )~%i j <'~
h
1
-. '4
~
October 7,
1981
of the basis
on which it is claimed that the information should
be
withheld from public disclosure,
This section further requires
the
statement to address
with specificity the considerations
listed in 10 CFR 2.790(b)(4).
The information sought to be withheld shall
be incor-
porated
as far as possible into a separate
part of the affidavit. If we
do not. hear from you in this regard within the specified periods
noted
above,
the report will be placed in the Public Document
Room.
Should you have
any questions
concerning this inspection,
we will be
glad to discuss
them with you.
Sincerely,
Origina] signed
by
H.
E.
Book
e
Enclosure:
IE Inspection
Report
Nos.
50-275/81-21
50-323/81-15
cc w/o encl:
W. A.
Raymond,
R.
C. Thornberry,
H. E. Book, Chief
Radiological Safety Branch
bcc:
DHB/Document Control
Desk
(RIDS)
Distributed by RV:
Engelken (ltr)
Resident Inspector
S. Silver (rpt only)
State of CA (Hahn/Johnson)
4
F'
4
h
V
'1
r
~ i
1
tt
k
I