October 7,

1981

Docket Nos.

50-2

5

- 2

Pacific Gas and Electric Company

P.O.

Box 7442

San Francisco, California 94106,

Attention:

Mr. Philip A. Crane, Jr.

Assistant

General

Counsel

Gentlemen:

~4/pp'

'rm

~i j l~L~K

Subject:

NRC Inspection - Diablo Canyon Units 1,

2

This refers to the inspection conducted

by Mr. D. M. Kunihiro, Team

Leader,

and other

NRC team members

on August 19,

1981 of activities

authorized

by NRC Construction Permit Nos.

CPPR-39

and

CPPR-69

and to

the discussion of our findings held by Mr. Kunihiro with Mr. Jim Shiffer

and other members of your staff,at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed

inspection report.

Within these areas,

the inspection consisted of

selective examinations of procedures

and plans

and observations

by the

NRC team members.

No items of noncompliance, with kRC requirements

were identified within

the scope of this inspection.

In accordance with 10 CFR 2.790 of the Commission's

regulations,

a copy

of this letter

and the enclosed

inspection report will be placed in the

NRC's Public Document

Room.

Ifthis report contains

any information

that you believe to be exempt from disclosure

under

10 CFR 9.5(a)(4), it

is necessary

that you (a) notify this office by telephone within ten

(10) days from the date of this, letter of your intention to file a

request for withholding; and (b) submit within 25 days from the date of

this letter

a written application to this office to withhold such infor-

mation. Ifyour receipt of this letter has

been delayed

such that less

than seven

(7) days are available for your review, please notify this

office promptly so that

a new due date

may be established.

Consistent

with section 2.790(b)(1),

any such application must be accompanied

by an

affidavit executed

by the owner. of the information which identifies the

document or part sought to be w/thheld, and which contains

a full statement

8x LX 0@0

gp

RV

OFFICE/

SURNAME)

DATEP

~

I

~

Po ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

h

R. Fish

10/5

/81";

~ ~ ~ ~ i ~ ~ ~ ~

s

~ ~ ~ ~ ~ ~

D.Ku i

ro:

10/

NRC FORM 318110/801 NRCM 0240

~ ~ ~

~ ~ ~ ~

~ ~ ~ ~ ~ ~ ~ ~ ~ ~

~. Ci 1 1 is

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

~ t

~ ~

FsWenslawski

0 ~

~ ~ ~ ~ ~ ~

co

10/ k /81

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

10/ 5

/81

10//~/81

~ ~ ~ ~ ~ ~ Pft ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

OFFICIAL RECORD COPY

~ ~

~ ~ ~ ~ ~ ~ ~ ~ ~ ~

H.

ok

10/ 7 /81

I \\ ~ ~ ~

  • USGPOl 1980-329.824

a<

~ly / )~%i j <'~

h

1

-. '4

~

October 7,

1981

of the basis

on which it is claimed that the information should

be

withheld from public disclosure,

This section further requires

the

statement to address

with specificity the considerations

listed in 10 CFR 2.790(b)(4).

The information sought to be withheld shall

be incor-

porated

as far as possible into a separate

part of the affidavit. If we

do not. hear from you in this regard within the specified periods

noted

above,

the report will be placed in the Public Document

Room.

Should you have

any questions

concerning this inspection,

we will be

glad to discuss

them with you.

Sincerely,

Origina] signed

by

H.

E.

Book

e

Enclosure:

IE Inspection

Report

Nos.

50-275/81-21

50-323/81-15

cc w/o encl:

W. A.

Raymond,

PG&E

R.

C. Thornberry,

PG&E

H. E. Book, Chief

Radiological Safety Branch

bcc:

DHB/Document Control

Desk

(RIDS)

Distributed by RV:

Engelken (ltr)

Resident Inspector

S. Silver (rpt only)

State of CA (Hahn/Johnson)

4

F'

4

h

V

'1

r

~ i

1

tt

k

I