IE Insp Repts 50-275/81-13 & 50-323/81-10 on 810605-0703. No Noncompliance Noted.Major Areas Inspected:Procedure Reviews,Ie Bulletin & Circular Followup & Outstanding Item Followup
ML16340B950
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 07/17/1981
From: Bagaglio M, Mendonca M, Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML16340B951 List:
References
50-275-81-13, 50-323-81-10, NUDOCS 8108040424
Download: ML16340B950 (14)


See also: IR 05000275/1981013

Text

.S.

NUCLEAR REGULATORY COMMISS

~

~

OFFICE

OF

INSPECTION AND ENFORCEMENT

50-275/81-13

Repor t No.

50-323/81-10

50-275

Docket No.

50-323

REGION

V

License

No.

CPPR-39

CPPR-69

Safeguards

Group

Licensee:

Pacific Gas

and Electric Company

P. 0.

Box 7442

San Francisco, California 94106

June

5 - July 3,

1981

Inspection

conducted:

Inspectors:

Mar

Bagaglio, Jr

,

Se

or Resident

Inspector

Facility

Name:

Diablo Canyon Units

1

and

2

Inspection at:

Diablo Canyon Site,

San Luis Obispo County, California

Date Signed

Ma vi

Mendonca,

Resi

nt Reactor Inspector

Date Signed

pproved

By:

D.

M. Steinberg, Ch'actor

Projects

Section

1

Reactor, Operations,Projects

Branch

Date Signed

Date Signed

Summary:

Ins ection of June

5 to Jul

3

1981

Re or t Nos.

50-275 81-13

& 50-323 81-10

~d:.1"

d:

R

1

1

p

1

1

1'ddgp1 <<,

d

bulletin/circular followups, and followup of outstanding

items.

This inspection

involved 47 inspector-hours

onsite

by two NRC resident inspectors.

Results:

No items of noncompliance

or deviations

were identified.

,( 8108040424

810717 f 'I

PDR

ADOCK 08000275~i

8

IPDR)

RV Form 219 (2)

li

l

I

i'\\

c4

r

bl

r

<APi f, yf

j

P$ 4

y

Pacific

Gas

and Electric Company

-2-

from public disclosure.

This section further requires the statement

to address

with specificity the considerations

listed in 10 CFR 2.790/b)(4).

The information

sought to be withheld shall

be incorporated

as far as possible into a separate

part of the affidavit. If we do not hear from you in this regard within the

specified periods

rioted above,

the report will be placed in the Public Document

Room.

Should you have any questions

concerning this inspection,

we will be glad

to discuss

them with you.

t

Sincerely,

~b>illa/) &Igflc4

1

g. g. g~ ~~ngea~ >8+4Pk

j Lf~~

J. L. Crews, Chief

Reactor

Oper ations Projects

Branch

Enclosure:

IE Inspection Report

Nos. 50-275/81-13

50-323/81-10

cc w/o enclosure:

J.

0 Schuyler,

PGE

J.

D. Shiffer,

PGE

M. A. Raymond,

PGE

R.

C. Thornberry (Diablo Canyon)

Sent to Reproduction,

Hg, for distribution

Distributed by RV:

RV RDR (2)

Engelken (ltr)

State of CA (Hahn/Johnson)

S, SiIver (Rpt only)

j

>

I rP f]Pq

qfw>rt<(,',g >'>f ~

f '

r

r ff'~i ~

~

f

~,It

<<f

]',.y>> >>'

.f,r,,"

.c

I C gf t f

~

I

>

>>ff

++@>>rt )>It,

+

fw>g I P

f ff"<>f~ y,>

foal fg

> >g

I

l>

l>f(

K

f

f>f

f

DETAILS

Persons

Contacted

  • R. Thornberry,

Plant Manager

  • R. Patterson,

Plant Superintendent

J.

S.

Diamonon,

gC Supervisor

  • J.

M. Gisclon,

Power Plant Engineer

D. g. Backens,

Supervisor of Maintenance

J.

A. Sexton,

Supervisor of Operations

  • J. V. Boots, Supervisor of Chemistry

and Radiation Protection

  • R. T. Twiddy, Supervisor of guality Assurance
  • W. B. Kaefer,

Technical Assistant to the Plant Manager

The inspectors

also talked with and interviewed

a number of other licensee

employees

including members of general

construction,

the operations staff,

and

gA personnel.

  • Denotes those attending the exit interview.

Plant Tour

The inspectors

walked through various

areas

of the plant on

a weekly basis

to observe activities in progress;

to inspect the general

state of clean-

liness,

housekeeping;

and adherence

to fire protection rules; to check the

proper approval of "man on the line, caution

and clearance"

tags

on equipment,

and to review with operations

personnel

the status of various

systems

in the

plant.

The inspectors

observed that the status

of the systems

and the housekeeping

appeared

consistent with construction activities.

The reactor cavity is

still being maintained

as

a clean area.

No items of noncompliance

or deviations

were identified.

Procedure

Review

The procedure

on emergency boration,

EP OP-6,

was reviewed.

This procedure

calls for an optional boration which requires closing of the centrifugal

charging

pump recirculation valves.

These valves

are required to be open

to assure

adequate

coolant flow through the centrifugal charging

pump on

pump startup.

The licensee

has

been apprised

that the operator

may need

to open these

valves

on

a safety injection signal to assure

centrifugal

charging

pump function.

This issue will be<carried

as

an open item until

resolved.

Additional Procedures

Reviewed:

1-

OP-19

Malfunction of Reactor

AP C-4sl

Temporary Modification

(see

below)

Makeup Control

, Jumpers

and Lifted Circuit Log

1

1

~

~

'l

II

~

'

'%

~ AI

~ 8

r

6

I

r

P

,I

v

V

4.

I

ps,g

'J

C-104

Independent verification'of Operating Activities (see below),

and

Numerous Procedures'on-Exercising

Valves in ECCS,

Auxiliary Feed

System

and Related

Systems

No items of noncompliance'or 'deviations

wet e idehtified'.,

rP>>

~l

'

IE Bulletin/Circular Followu

"'-

"

!.>'fl

An inspector

reviewed

licensee~",actions, related to IE,Bulletins and Circulars.

Inspection findings were

as follows:

IE Bulletin 80-24: Prevention of Damage

due to Hater leakage

inside

Containment

(closed).

Although not required to respond to this bulletin,

the applicant reviewed potential

sources

of ',water leakage into contain-

ment addressed

by the bulletin."

Th'e applicant's:rev'iew went beyond the

scope of the bulletin and demonstrated

in each

instance

where

an alarm

condition and/or routine surveillance

performed

on

a shift basis

would

detect the subject "leakage.

The cooling water systems

inside contain-

ment are closed

systems

and have not experienced

any leakage

problems

to date.

Based

upon discussions

with a licensee representative

and

review by the inspector of an applicant's written investigation into this

problem area,

the applicant

has

met the intent of the bulletin and it

is considered

closed.

No items of noncompliance

or deviations

were identified.

C

5.

Fuel

Load (FL)/Full Power

(TAP) items were reviewed during the course of

  • this inspection:

a ~

Tap I.C.6. - Guidance

on Procedures

for Verifying Correct Performance

'f

Operating Activities (FL requirement)

Summary:

It is required

(from NUREG-0737) that licensees'rocedures

be reviewed

and revised,

as necessary,

to assure that

an effective

system of verifying the correct performance

of operating activities

is provided

as

a means of reducing

human errors

and improving the

quality of normal operations.

This will reduce

the frequency of

'occurrence

of situations that could result in or contribute to accidents.

Such

a verification system

may include automatic

system status monitoring,

human verification of operations

and maintenance activities independent

of the people performing the activity (see

NUREG-0585,

Recommendation

5),

or both.

Findings

and Conclusion:

An inspector

has reviewed Nuclear Plant

Administrative Procedure

(NPAP) C-104,

Independent Verification of

Operating Activities.

In NPAP C-104, the applicant

has specified the

sequence

to be followed by plant personnel

conducting

independent

verifications.

The applicant

has also delineated

time limits to perform

independent verifications

and individuals who may make initial and

0

1

~

~

li" 'v

i

J

4

a'

/

t

~ I

pl

I

sl

1,'i

4

a,

'I

1

1

t

't

I'

\\

t,

t

Il

I

1(

restoration

lineups of systems,-

NPAP C-104 complements

several

other

applicant administrative procedures

used to perform maintenance

and

surveillance tests of preventive maintenance.

Based

upon review of

NPAP C-104

and its integration with existing directives, this

TAP

is considered satisfied

and closed.

il

b.

TAP II.K.l - IE Bulletins on Measures

to Mitigate Small

Break

LOCAs

and Loss of Feedwater

Accidents

(FL prerequisite)

NUREG 0737 addresses

seven

items under this

TAP that

need to be satisfied

prior to fuel load.

Of these

seven,

four are applicable to Babcock

and Wilcox plants

and are hence

not applicable to Diablo Canyon.

Accordingly, the following paragraphs

discuss findings regarding the

three applicable items.

(1)

Summary:

NUREG 0737

TAP II.K.l, Item 5, which corresponds

to

IE Bulletin 79-06A,

Item 5.

For facilities for which the auxiliary

feedwater

system is not automatically initiated, prepare

and im-

plement immediately procedures

which require the stationing of an

individual (with no other assigned

concurrent duties

and in direct

and continuous

communication with the control room) to promptly

initiate adequate

auxiliary feedwater to the steam generator(s)

for those transients

or accidents

the consequences

of which can

be limited by such action.

Findings

and Conclusion:

The auxiliary feedwater

system is auto-

matically initiated at Diablo Canyon.

This portion of the subject

TAP is closed.

(2)

Summary:

NUREG 0737

TAP II.K.1, Item 10,which corresponds

to

IE Bulletin 79-06A,

Item 10.

Review and modify as necessary

maintenance

and test procedures

to ensure that they require:

(a)

Verification, by test or inspection, of the operability of

redundant safety-related

system from service.

(b)

Verification of the operability of all safety-related

systems

when they are returned to service following maintenance

or

testing.

(c)

Explicit notification of involved reactor operational

personnel

whenever

a safety-related

system is removed from and returned

to service.

Findings

and Conclusion:

The, following applicant administrative

procedures

have

been reviewed:

NPAP A101, Supplement'

NPAP C3, Supplement

1

Relieving the Watch

Surveillance Testing

and

Iqspection

4

1

1

~

1

y/p

"~ (

) ~ ' 'P

'1

~l('

'

~

'l

i l

.

",%g 'j~

>1 ~ L%

4

L1

1

(L 'I

C;

~

~

~

~

~g, ~'

g

~

'

-4-

~l

F-

l9>t

ie

'r

(3)

NPAP

C4

'

',. '

Bypa'ss~ofwSafety

Fun'ctions

and

,'

", ;...;.,'Contr~ol of

Jumpers,'PAP

C4, Supplement

1"

'~Temporar'y Modifications, Jumpers,

and
Lifted Circuit Log Clearance

NPAP C-6,"Supplement:

1

', Clearance

Request.~Procedure

~,4',

~

These

procedures,aJdr'e'ss

'satisfactorily, each'f

the requirements

cited in the

Summary, above.",Accopdingly,

this'<portion of the

subject

TAP is closed;

L

Summary:

NUREG 0737,',TAP 'II.K..l, Item 17, which corresponds

to

IE Bulletin 79-06A,

Item 3.

For,facilities that use pressurizer

water level coincident with pressurizer

pressure for automatic

initiation of safety injection into the reactor

coolant system,

trip the low pressurizer

level setpoint bistables

such that,

when

the pressurizer

pressure

reaches

the low setpoint,

safety injection

would be initiated regardless

of the pressurizer

level.

In addition,

instruct operators

to manually initiate safety injection when the

pressurizer

pressure

indication reaches

the actuation setpoint

whether or not the level indication has

dropped to the actuation

setpoint.

Findings

and Conclusion:

The applicant

has modified the installed

protective

system

such that pressurizer

pressure

signals

alone

are

used to automatically generate

one of the many engineered

safeguard

features

(ESF) actuations.

An inspector

has reviewed

EP OP-O, Reactor Trip with Safety Injection,

and

ED OP-38, Antici-

pated Transient Without Trip.

The procedures

direct operators

to manually initiate ESF upon reaching

the

ESF low pressure

act-

uation set point.

This portion of the subject

TAP is closed.

Since the applicant

has satisfied all applicable portions of this

TAP, it is considered

closed.

c.

TAP I.D."5, Procedure for Feedback of Operating

Experience to Plant

Staff.

NUREG 0737 required that,

"Each applicant for an operating license shall

prepare

procedures

to assure that operating

information pertinent to

plant safety originating both within and outside the utility organization

is continually supplied to operators

and other personnel

and is incor-.

porated into training and retraining programs."

We have reviewed

Nuclear Plant Administrative Procedure

C-14, Supplement

1, Dissemination

of Operating Experience,

and based

on this review find that the applicant

has complied with the requirement.

This

TAP item is, therefore,

closed.

No items of noncompliance or deviations

were identified.

I

~

6 r

  • ~

~

~

~ "~

)

g

f

~ I

)f)

Q

"

4

~

I

~

V

s

I

6.

Prep eration Test Pio ram Controls

The inspectors verified by record review and/or observation that:

(a) juris-

diction controls were being observed for system turnover,

(b) tagging

was

being accomplished

consistent

with jurisdictional controls of the adminis-

trative procedures,

and (c) controls were being observed prior to and

subsequent

to testing.

A schedule

is being maintained for preoperational

testing

and updated

when necessary.

No items of noncompliance

or deviations

were identified.

7.

A for Preo erational Testin

The inspectors

examined all gA audit reports of preoperational

testing audits

conducted within the last three months.

The inspectors verified that the

audits

were conducted

in accordance

with approved

procedures

and that cor-

rective actions for all identified discrepancies

had

been taken.

System

turnover from construction to the startup test group

and to the operations

division was conducted in accordance

with established

procedures

and admin-

istrative controls.

No items of noncompliance or deviations

were identified.

8.

Exit Interview

An inspector

met with senior licensee representatives

on a weekly basis

and

with the representatives

(denoted

in Paragraph

1)

on July 9,

1981.

The

scope

and findings of the inspection

were summarized

by the inspector.

~

~

~

V

~

)

t

'I

~

1

II

I)

PW)

P

g

~

)

gg

f) q/

fl

El

C

I

P

Jl

1