ML16340B659

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-275/81-05 & 50-323/81-05,on 810309-13.No Noncompliance Noted
ML16340B659
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 04/03/1981
From: Book H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Crane P
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16340B660 List:
References
NUDOCS 8104300098
Download: ML16340B659 (4)


See also: IR 05000275/1981005

Text

~R REQIj

P0

nO

O$

+a*++

Docket No.

50-275

50-323

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1990 N. CALIFORNIABOULEVARD

SUITE 202, WALNUTCREEK PLAZA

WALNUTCREEK, CALIFORNIA94596

April 3,

1981

~pl

FQ~

/

iy

Pacific

Gas

and Electric Company

P.

0.

Box 7442

San Francisco,

California 94106

Attention:

Mr. Philip A. Crane, Jr.

Assistant

General

Counsel

Gentlemen:

Subject:

NRC Inspection - Diablo Canyon Units

1 and

2

This refers to 'the inspection

conducted

by Mr. North of this office on

March 9-13,

1981 of activities authorized

by NRC Construction Permit

Nos.

CPPR-39

and

CPPR-69,

and to the discussion of our findings held by

Mr. North with Mr. Thornberry and other members of your staff at the

conclusion of the inspection.

Areas

examined during this inspection are described

in the enclosed

inspection report.

Within these areas,

the inspection consisted of

selective examinations of procedures

and representative

records,

in-

terviews with personnel,

and observations

by the inspector.

No items of noncompliance with NRC requirements

were identified within

the scope of this inspection.

In accordance

with Section 2.790 of the NRC's "Rules of Practice,"

, Part 2, Title 10,

Code of Federal

Regulations,

a copy of this letter and

the enclosed

inspection report will be placed in the NRC's Public Document

Room.

If this report contains

any information that you believe to be

proprietary, it is necessary

that you submit

a written application to

this office, within 20 days of the date of this letter, requesting

that

such information be withheld from public disclosure.

The application

must include

a full statement of the reasons

why it is claimed that the

information is proprietary.

The application should

be prepared

so that

any proprietary information identified is contained in an enclosure

to

the application,

since the application without the enclosure will also

be placed in the Public Document

Room. If we do not hear

from you in

this regard within the specified period,

the report will be placed in

the Public Document

Room.

EJ

/

-/,l

k':>>

Pacific Gas

and Electric Company

-2-

APR

3 198l

Should you have any questions

concerning this inspection,

we will be

glad to discuss

them with you.

Sincerely,

4 i. ~-~

H.

E.

Book, Chief

Radiological Safety Branch

Enclosure:

IE Inspection Report

No. 50-275/81-05

50-323/81-05

cc w/o enclosure:

W. A. Raymond,

PG&E

E.

B. Langley, Jr.,

PGEE

R.

C. Thornberry, Plant Manager