ML16340B116

From kanterella
Jump to navigation Jump to search
Forwards IE Bulletin 80-18, Maint of Adequate Min Flow Through Centrifugal Charging Pumps Following Secondary Side High Energy Line Rupture. Action Required
ML16340B116
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 07/24/1980
From: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Crane P
PACIFIC GAS & ELECTRIC CO.
References
NUDOCS 8008200537
Download: ML16340B116 (2)


Text

~P,8 RE00

,i Cq~0 Cy

~

ClO I

3a lA (p

IP ++*++

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION V 1990 N. CALIFORNIABOULEVARD

~

SUITE 202, WALNUTCREEK PLAZA WALNUTCREEK, CALIFORNIA94596 July 24, 1980 Docket Nos.

50-275 50-323 Pacific Gas and Electric Company 77 Beale Street San Francisco, California 94106 Attention:

Nr. Philip A. Crane, Jr.

Assistant General Counsel Gentlemen:

The enclosed IE Bulletin No. 80-18, is forwarded for action.

A written response is required.

In order to assist the NRC in evaluating the value/impact of each Bulletin on licensees, it would be helpful if you would provide an estimate of the manpower expended in conduct of the review and preparation of the report(s) required by the Bulletin.

Please estimate separately the manpower associated with correc-tive actions necessary following identification of problems through the Bulletin.

If you desire additional information regarding this matter, please contact this office.

Sincerely, R.

H. Engelken Director

Enclosures:

l.

IE Bulletin No. 80-18 2.

List of Bulletins Recently Issued cc w/enclosures:

E.

B. Langley, Jr.,

PGKE W.

Raymond, PG&E R.
Ramsay, PG8E, Diablo Canyon