UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION V
1990 N. CALIFORNIABOULEVARD
SUITE 202, WALNUTCREEK PLAZA
WALNUTCREEK, CALIFORNIA94596
APR g 0
f98O
Docket Nos.
-27
SO-
3
Pacific Gas
and Electric Company
77 Beale Street
San Francisco,
94106
Attention:
Nr. Philip A. Crane
Assistant General
Counsel
Gentlemen:
Subject:
NRC Inspection at Diablo Canyon Units
1
and
2
This refers to the inspection
conducted
by Nr.
D. F. Kirsch of this
office on triarch
27 and April 1-4,
1980 of activities authorized
by
NRC
Construction Permit Nos.
CPPR-39
and CPPR-69,
and to the discussions
of
our findings held with Mr. R.
D. Etzler and other members of your staff
at the conclusion of the inspection.
Areas
examined during this inspection are described
in the enclosed
inspection report.
llithin these
areas,
the inspection consisted of
selective
examinations of procedures
and representative- records, inter-
views with personnel,
and observations
by the inspector.
No items of noncompliance with NRC requirements
were identified within
the scope of this inspection.
In accordance
with Section 2.790 of the NRC's "Rules of Practice,"
Part 2, Title 10,
Code of Federal
Regulations,
a copy of this letter
and
the enclosed
inspection report will be placed in the
NRC's Public
Document
Room.
If this report contains
any information that you believe
to be proprietary, it is necessary
that you submit
a written application
8 00588II ~
~~ I
PacifiC Gas
and Electric Company
-2-
QPR gQ l00)
'to this office, within 20 days of the date of this letter, requesting
that such information be withheld from public disclosure.
The applica-
tion must include
a full statement of the reasons
why it is claimed that
the information is proprietary.
The application should
be prepared
so
that any proprietary information identified is contained in an enclosure
to the application,
since the application without the enclosure will
also
be placed in the Public Document
Room.
If we do not hear from you
in this regard within the specified period,
the report will be placed in
the Public Document
Room.
Should you have
any questions
concerning this inspection,
we will be
glad to discuss
them with you.
Sincerely,
Enclosure:
IE Inspection
Report
Nos. 50-275/80-06
50-323/80-03
cc w/o enclosure:
W. A.
Raymond,
PGSE
E.
B. Langley, Jr.,
R.
D.
Ramsay,
PG8E (Avila Beach)
cc w/enclosure:
R.
D. Etzler,
PGSE (Diablo Canyon)
J.
B. Hock, Project Engineer,
PGSE
G.
S. Spencer,
Chief
Reactor
Construction
and
Engineering
Support Branch