Forwards IE Insp Repts 50-275/80-06 & 50-323/80-03 on 800327 & 0401-04.No Noncompliance Noted
ML16340A983
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 04/10/1980
From: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Crane P
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16340A984 List:
References
NUDOCS 8005220388
Download: ML16340A983 (4)


See also: IR 05000275/1980006

Text

~~>> REpuc

Wp.0

Cy

0

u

pL

++*++

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1990 N. CALIFORNIABOULEVARD

SUITE 202, WALNUTCREEK PLAZA

WALNUTCREEK, CALIFORNIA94596

APR g 0

f98O

Docket Nos.

-27

SO-

3

Pacific Gas

and Electric Company

77 Beale Street

San Francisco,

California

94106

Attention:

Nr. Philip A. Crane

Assistant General

Counsel

Gentlemen:

Subject:

NRC Inspection at Diablo Canyon Units

1

and

2

This refers to the inspection

conducted

by Nr.

D. F. Kirsch of this

office on triarch

27 and April 1-4,

1980 of activities authorized

by

NRC

Construction Permit Nos.

CPPR-39

and CPPR-69,

and to the discussions

of

our findings held with Mr. R.

D. Etzler and other members of your staff

at the conclusion of the inspection.

Areas

examined during this inspection are described

in the enclosed

inspection report.

llithin these

areas,

the inspection consisted of

selective

examinations of procedures

and representative- records, inter-

views with personnel,

and observations

by the inspector.

No items of noncompliance with NRC requirements

were identified within

the scope of this inspection.

In accordance

with Section 2.790 of the NRC's "Rules of Practice,"

Part 2, Title 10,

Code of Federal

Regulations,

a copy of this letter

and

the enclosed

inspection report will be placed in the

NRC's Public

Document

Room.

If this report contains

any information that you believe

to be proprietary, it is necessary

that you submit

a written application

8 00588II ~

~~ I

PacifiC Gas

and Electric Company

-2-

QPR gQ l00)

'to this office, within 20 days of the date of this letter, requesting

that such information be withheld from public disclosure.

The applica-

tion must include

a full statement of the reasons

why it is claimed that

the information is proprietary.

The application should

be prepared

so

that any proprietary information identified is contained in an enclosure

to the application,

since the application without the enclosure will

also

be placed in the Public Document

Room.

If we do not hear from you

in this regard within the specified period,

the report will be placed in

the Public Document

Room.

Should you have

any questions

concerning this inspection,

we will be

glad to discuss

them with you.

Sincerely,

Enclosure:

IE Inspection

Report

Nos. 50-275/80-06

50-323/80-03

cc w/o enclosure:

W. A.

Raymond,

PGSE

E.

B. Langley, Jr.,

PG&E

R.

D.

Ramsay,

PG8E (Avila Beach)

cc w/enclosure:

R.

D. Etzler,

PGSE (Diablo Canyon)

J.

B. Hock, Project Engineer,

PGSE

G.

S. Spencer,

Chief

Reactor

Construction

and

Engineering

Support Branch