ML16340A769

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-275/79-25 on 791101-30.No Noncompliance Noted
ML16340A769
Person / Time
Site: Diablo Canyon 
Issue date: 12/31/1979
From: Crews J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Crane P
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16340A771 List:
References
NUDOCS 8002010247
Download: ML16340A769 (4)


See also: IR 05000275/1979025

Text

gp,o REoo

Wp

+

0

~p %~

0O

0

Wp*p4

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1990 N. CALIFORNIABOULEVARD

SUITE 202, WALNUTCREEK PLAZA

WALNUTCREEK, CALIFORNIA94596

DEfl 31 'le',>>,

Docket No. 50-275

Pacific

Gas

and Electric

Company

77 Beale Street

San Francisco,

California

94106

Attention:

Mr. Philip A. Crane, Jr.

Assistant

General

Counsel

Gentlemen:

Subject:

NRC Inspection of Diablo Canyon Unit

1

This refers to the inspection conducted

by Mr. T.

Young of this office on

November

1-30,

1979, of activities authorized

by

NRC Construction

Permit

No.

CPPR-39

and to the discussion of our findings held by Mr. Young with

Messrs.

Ramsay,

Norem,

and other

members of your staff at the conclusion

of the inspection.

Areas examined during this inspection are described

in the enclosed

inspection

report.

Within these areas,

the inspection consisted of selective

examina-

tions of procedures

and representative

records,

interviews with personnel,

and

observations

by the inspector.

No items of noncompliance with NRC requirements

were identified within the

scope of this inspection.

In accordance

with Section

2.790 and the

NRC's "Rules of Practice,"

Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this letter and the enclosed

inspection report will be placed in the

NRC's Public Document

Room. If this

report contains

any information that you believe to be proprietary, it is

necessary

that you submit

a written application to this office, within 20 days

of the date of this letter, requesting that such information be withheld from

public disclosure.

The application must include

a full statement of the

reasons

why it is claimed that the information is proprietary.

The applica-

tion should

be prepared

so that any proprietary information identified is

contained in an enclosure to the application,

since the application without

the enclosure will also

be placed in the Public Document

Room.

If we do not

hear from you in this regard within the specified period,

the report will be

placed in the Public Document, Room.

coo SoI, o Z+7~

,Pacific

Gas and Electric Company

-2-

DEc 3> l97g,

Should you have any questions

concerning this inspection,

we will be glad

to discuss

them with you.

Sincerely,

Enclosure:

IE Inspection

Report

No. 50-275/79-25

cc w/o enclosure:

J.

0. Worthington,

PGSE

R.

D. Ramsay,

PG&E (Avila Beach)

W. A. Raymond,

PG8E

W.

H. Barr,

PGSE

J.

L. Crews, Chief

Reactor Operations

and Nuclear

Support

Branch

0