7 to Updated Final Safety Analysis Report, Chapter 4, Table 4.5-1, Reactor Coolant System Quality Control Program
ML16340A111
Person / Time
Site: Cook  
Issue date: 10/24/2016
From:
Indiana Michigan Power Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16336A263 List: ... further results
References
AEP-NRC-2016-42
Download: ML16340A111 (4)


Text

IINNDDIIAANNAA AANNDD M MIICCHHIIGGAANN PPOOW WEERR DD.. CC.. CCOOOOKK NNUUCCLLEEAARR PPLLAANNTT UUPPDDAATTEEDD FFIINNAALL SSAAFFEETTYY AANNAALLYYSSIISS RREEPPOORRTT Revision:

17 Table:

4.5-1 Page:

1 of 4 REACTOR COOLANT SYSTEM QUALITY CONTROL PROGRAM Component RT*

UT**

PT***

MT****

ET*****

1.

Steam Generator 1.1 Tube Sheet 1.1.1 Forging yes yes 1.1.2 Cladding yes(+)

yes(++)

1.2 Channel Head 1.2.1 Casting yes yes 1.2.2 Forging (Unit 1 Model 51R) yes yes 1.2.3 Cladding yes 1.3 Secondary Shell & Head 1.3.1 Plates yes 1.3.2 Forgings (Unit 1 Model 51R) yes yes 1.4 Tubes yes yes 1.5 Nozzles (forgings) yes yes 1.6 Weldments 1.6.1 Shell, longitudinal yes yes 1.6.2 Shell, circumferential yes yes 1.6.3 Cladding (Channel Head-Tube Sheet joint cladding restoration) yes 1.6.4 Steam and Feedwater Nozzle to shell yes yes 1.6.5 Support brackets yes 1.6.6 Tube to tube sheet yes 1.6.7 Instrument connections (primary and secondary) yes

  • Radiographic
    • Ultrasonic
      • Dye Penetrant
        • Magnetic Particle
          • Eddy Current

(+)Flat Surfaces Only

(++)Weld Deposit Areas Only

IINNDDIIAANNAA AANNDD M MIICCHHIIGGAANN PPOOW WEERR DD.. CC.. CCOOOOKK NNUUCCLLEEAARR PPLLAANNTT UUPPDDAATTEEDD FFIINNAALL SSAAFFEETTYY AANNAALLYYSSIISS RREEPPOORRTT Revision:

17 Table:

4.5-1 Page:

2 of 4 REACTOR COOLANT SYSTEM QUALITY CONTROL PROGRAM Component RT*

UT**

PT***

MT****

ET*****

1.6.8 Temporary attachments after removal yes 1.6.9 After hydrostatic test (after welds and complete channel head -

where accessible) yes 1.6.10 Nozzle safe ends (if forgings) yes yes 1.6.11 Nozzle safe ends (if weld deposit) yes 2.

Pressurizer 2.1 Heads 2.1.1 Casting yes yes 2.1.2 Cladding yes 2.2 Shell 2.2.1 Plates yes yes 2.2.2 Cladding yes 2.3 Heaters 2.3.1 Tubing(+++)

yes yes 2.3.2 Centering of element yes 2.4 Nozzle yes yes 2.5 Weldments 2.5.1 Shell, longitudinal yes yes 2.5.2 Shell, circumferential yes yes 2.5.3 Cladding yes 2.5.4 Nozzle Safe End (if forging) yes yes 2.5.5 Nozzle Safe End (if weld deposit) yes 2.5.6 Instrument Connections yes 2.5.7 Support Skirt yes 2.5.8 Temporary Attachments after removal yes

(+++)Or a UT and ET

IINNDDIIAANNAA AANNDD M MIICCHHIIGGAANN PPOOW WEERR DD.. CC.. CCOOOOKK NNUUCCLLEEAARR PPLLAANNTT UUPPDDAATTEEDD FFIINNAALL SSAAFFEETTYY AANNAALLYYSSIISS RREEPPOORRTT Revision:

17 Table:

4.5-1 Page:

3 of 4 REACTOR COOLANT SYSTEM QUALITY CONTROL PROGRAM Component RT*

UT**

PT***

MT****

ET*****

2.5.9 All welds and cast heads after hydrostatic test yes 2.6 Final Assembly 2.6.1 All accessible surfaces after hydrostatic test yes 3.

Piping repairs and replacements are conducted in accordance with ASME Section XI 3.1 Fittings and Pipe (Castings) yes yes 3.2 Fittings and Pipe (Forgings) yes yes 3.3 Weldments 3.3.1 Circumferential yes yes 3.3.2 Nozzle to runpipe (except no RT for nozzles less than 4 inches) yes yes 3.3.3 Instrument connections yes 4.

Pumps 4.1 Castings yes yes 4.2 Forgings 4.2.1 Main Shaft yes yes 4.2.2 Main Studs yes yes 4.2.3 Flywheel (Rolled Plate) yes 4.3 Weldments 4.3.1 Circumferential yes yes 4.3.2 Instrument connections yes 5.

Reactor Vessel 5.1 Forgeries 5.1.1 Flanges yes yes 5.1.2 Studs yes yes 5.1.3 Head Adapters yes yes 5.1.4 Head Adapter Tube yes yes

IINNDDIIAANNAA AANNDD M MIICCHHIIGGAANN PPOOW WEERR DD.. CC.. CCOOOOKK NNUUCCLLEEAARR PPLLAANNTT UUPPDDAATTEEDD FFIINNAALL SSAAFFEETTYY AANNAALLYYSSIISS RREEPPOORRTT Revision:

17 Table:

4.5-1 Page:

4 of 4 REACTOR COOLANT SYSTEM QUALITY CONTROL PROGRAM Component RT*

UT**

PT***

MT****

ET*****

5.1.5 Instrumentation Tube yes yes 5.1.6 Main Nozzles yes yes 5.1.7 Nozzle safe ends (if forging is employed) yes yes 5.2 Plates yes yes 5.3 Weldments 5.3.1 Main Steam yes yes 5.3.2 CRD Head Adapter Connection yes 5.3.3 Instrumentation tube connection yes 5.3.4 Main nozzles yes yes 5.3.5 Cladding Yes

(++++)

yes 5.3.6 Nozzle-safe ends (if forging) yes yes 5.3.7 Nozzle safe ends (if weld deposit) yes yes 5.3.8 Head adaptor forging to head adaptor tube yes yes 5.3.9 All welds after hydrotest yes 6.

Valves 6.1 Castings yes yes 6.2 Forgings (No NDE for valves two inches and smaller) yes yes

(++++)UT of Clad Bond-to-Base Metal