IINNDDIIAANNAA AANNDD M MIICCHHIIGGAANN PPOOW WEERR DD.. CC.. CCOOOOKK NNUUCCLLEEAARR PPLLAANNTT UUPPDDAATTEEDD FFIINNAALL SSAAFFEETTYY AANNAALLYYSSIISS RREEPPOORRTT Revision:
16.1 Table:
4.1-11 Page:
1 of 3
SUMMARY
OF PLANT OUTAGE FOR YANKEE-ROWE (1964 - 1969)
Starting Date Duration Days/Hours Outage Type Case Equipment/System 1/17/64 3.1 Forced Turbine Trip 2/12/64 21.8 Scheduled Control Rod Drop Testing 3/11/64 4.5 Forced Moisture separator level switch tripped due to vibration 3/26/64 4
Forced Control Valves Sticking 5/18/64 5.4 Forced Low condensate pump discharge pressure 8/2/64 35 Scheduled Refueling and general maintenance 9/9/64 2.4 Scheduled Check of Overspeed Trip 9/11/64 14.7 Forced Spurious Reactor Trip 10/18/64 12.2 Forced Condenser Noise 10/22/64 22.4 Forced Neutron Counter Gain Control 2/12/65 15.2 Forced Switch yard Electric 3/5/65 Scheduled Switch yard Electric 8/9/65 93 6
Scheduled Refueling 11/26/65 2
20 Scheduled Turbine Repair-Physics Testing 2/4/66 3.12 Forced Reactor Scram 4/4/66 89.5 Scheduled Leaking Pressurizer Safety Valves
IINNDDIIAANNAA AANNDD M MIICCHHIIGGAANN PPOOW WEERR DD.. CC.. CCOOOOKK NNUUCCLLEEAARR PPLLAANNTT UUPPDDAATTEEDD FFIINNAALL SSAAFFEETTYY AANNAALLYYSSIISS RREEPPOORRTT Revision:
16.1 Table:
4.1-11 Page:
2 of 3
SUMMARY
OF PLANT OUTAGE FOR YANKEE-ROWE (1964 - 1969)
Starting Date Duration Days/Hours Outage Type Case Equipment/System 7/10/66 3.68 Forced Reactor Scram 8/25/66 2.40 Forced Reactor Scram 10/4/66 34 10.23 Scheduled Refueling 2/24/66 2.88 Forced Reactor Scram 12/28/66 2.12 Forced Reactor Scram 3/8/67 11 21 Scheduled Steam Generator Leak Repair 5/12/67 16.87 Scheduled Condenser Cleaning 7/9/67 17 1.5 Scheduled Steam Generator Leak Repairs 10/28/67 9
Scheduled AEC Operator Examinations 10/13/67 2.6 Forced Reactor Scram 3/23/68 38 Scheduled Core VI-VII Refueling and maintenance 7/20/68 1
10 Scheduled Repair Leak from No. 1 M.C. Pump Stator Cap 11/8/68 6
16.42 Scheduled Repair No. 4 Main Coolant Pump Thermal Barrier Leak and other Maintenance 1/18/69 1
2.1 Scheduled Operator Training 2/15/69 1
1.8 Scheduled Operator Training 3/1/69 11 Scheduled AEC Operator Examination 4/11/69 4
18 Forced Repair Reactor Instrument Leak
IINNDDIIAANNAA AANNDD M MIICCHHIIGGAANN PPOOW WEERR DD.. CC.. CCOOOOKK NNUUCCLLEEAARR PPLLAANNTT UUPPDDAATTEEDD FFIINNAALL SSAAFFEETTYY AANNAALLYYSSIISS RREEPPOORRTT Revision:
16.1 Table:
4.1-11 Page:
3 of 3
SUMMARY
OF PLANT OUTAGE FOR YANKEE-ROWE (1964 - 1969)
Starting Date Duration Days/Hours Outage Type Case Equipment/System 7/17/69 4.8 Forced Reactor Scram 8/2/69 53 18.5 Scheduled Refueling Maintenance 10/16/69 6.1 Forced Reactor Scram 10/29/69 12 Scheduled Turbine Valve Flange Steam Leak Repair