Letter Sequence Request |
---|
CAC:MF8796, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability (Approved, Closed) |
|
|
|
---|
Category:Letter type:PNP
MONTHYEARPNP 2024-014, Request for USNRC to Rescind Approved Exemption Requests for 140.11(a)(4) and 50.54(w)(1), Reduction of Insurances2024-10-0909 October 2024 Request for USNRC to Rescind Approved Exemption Requests for 140.11(a)(4) and 50.54(w)(1), Reduction of Insurances PNP 2024-037, Response to Requests for Additional Information Regarding the Proposed Reauthorization of Power Operations Under Renewed Facility Operating License Number DPR-0202024-10-0404 October 2024 Response to Requests for Additional Information Regarding the Proposed Reauthorization of Power Operations Under Renewed Facility Operating License Number DPR-020 PNP 2024-029, Notice of Payroll Transition at Palisades Nuclear Plant2024-08-15015 August 2024 Notice of Payroll Transition at Palisades Nuclear Plant PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 PNP 2024-032, Supplement to License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations2024-07-31031 July 2024 Supplement to License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations PNP 2024-033, Response to Request for Additional Information - License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations2024-07-24024 July 2024 Response to Request for Additional Information - License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations PNP 2024-031, Response to RIS 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-07-18018 July 2024 Response to RIS 2024-01, Preparation and Scheduling of Operator Licensing Examinations PNP 2024-027, Supplement to License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2024-07-0909 July 2024 Supplement to License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations PNP 2024-003, License Amendment Request to Approve the Biasi Critical Heat Flux (CHF) Correlation for Use with the Palisades Main Steam Line Break (MSLB) Analysis2024-05-24024 May 2024 License Amendment Request to Approve the Biasi Critical Heat Flux (CHF) Correlation for Use with the Palisades Main Steam Line Break (MSLB) Analysis PNP 2024-025, Supplement to Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments, Proposed Power Operations Quality Assurance Program Manual, Revision 02024-05-23023 May 2024 Supplement to Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments, Proposed Power Operations Quality Assurance Program Manual, Revision 0 PNP 2024-023, Pre-Submittal Meeting Presentation - License Amendment Request to Approve the Biasi Critical Heat Flux (CHF) Correlation for Use with the Palisades Main Steam Line Break (MSLB) Analysis2024-05-0909 May 2024 Pre-Submittal Meeting Presentation - License Amendment Request to Approve the Biasi Critical Heat Flux (CHF) Correlation for Use with the Palisades Main Steam Line Break (MSLB) Analysis PNP 2024-005, License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations2024-05-0101 May 2024 License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations PNP 2024-008, Annual Radioactive Effluent Release Report2024-04-23023 April 2024 Annual Radioactive Effluent Release Report PNP 2024-009, Annual Radiological Environmental Operating Report2024-04-23023 April 2024 Annual Radiological Environmental Operating Report PNP 2024-017, 2023 Annual Non-Radiological Environmental Operating Report2024-04-23023 April 2024 2023 Annual Non-Radiological Environmental Operating Report PNP 2024-016, Notice of Intent to Pursue Subsequent License Renewal2024-04-18018 April 2024 Notice of Intent to Pursue Subsequent License Renewal PNP 2024-006, Notification of Changes in Accordance with 10 CFR 50.82(a)(7)2024-04-0909 April 2024 Notification of Changes in Accordance with 10 CFR 50.82(a)(7) PNP 2024-001, License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations2024-02-0909 February 2024 License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations PNP 2023-030, License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2023-12-14014 December 2023 License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations PNP 2023-035, Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements2023-12-12012 December 2023 Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements PNP 2023-028, Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments2023-12-0606 December 2023 Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments PNP 2023-033, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation PNP 2023-025, Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.822023-09-28028 September 2023 Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82 PNP 2023-026, Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations2023-09-28028 September 2023 Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations PNP 2023-021, Ventilated Storage Cask Inspection Summary Report2023-08-16016 August 2023 Ventilated Storage Cask Inspection Summary Report PNP 2023-023, Special Report – High Range Noble Gas Monitor Inoperable2023-08-0909 August 2023 Special Report – High Range Noble Gas Monitor Inoperable PNP 2023-018, 2022 Annual Non-Radiological Environmental Operating Report2023-04-25025 April 2023 2022 Annual Non-Radiological Environmental Operating Report PNP 2023-007, And Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports2023-04-19019 April 2023 And Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports PNP 2023-008, 2022 Radiological Environmental Operating Report2023-04-18018 April 2023 2022 Radiological Environmental Operating Report PNP 2023-002, 6 to Updated Final Safety Analysis Report2023-03-31031 March 2023 6 to Updated Final Safety Analysis Report PNP 2023-006, Report of Changes to Security Plan, Revision 202023-03-29029 March 2023 Report of Changes to Security Plan, Revision 20 PNP 2023-012, Presentation on Regulatory Path to Reauthorize Power Operations2023-03-16016 March 2023 Presentation on Regulatory Path to Reauthorize Power Operations PNP 2023-001, Regulatory Path to Reauthorize Power Operations2023-03-13013 March 2023 Regulatory Path to Reauthorize Power Operations PNP 2023-004, Report of Changes to Palisades Nuclear Plant Technical Specification Bases2023-03-0808 March 2023 Report of Changes to Palisades Nuclear Plant Technical Specification Bases PNP 2023-005, Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report2023-03-0101 March 2023 Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report PNP 2022-037, Report of Changes to Security Plan, Revision 192022-12-14014 December 2022 Report of Changes to Security Plan, Revision 19 PNP 2022-036, Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2022-11-0808 November 2022 Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme PNP 2022-035, International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations2022-11-0202 November 2022 International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations PNP 2022-024, Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance PNP 2022-026, Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance PNP 2022-031, License Amendment Request, Revise License Condition to Eliminate Cyber Security Plan Requirements2022-09-14014 September 2022 License Amendment Request, Revise License Condition to Eliminate Cyber Security Plan Requirements PNP 2022-025, Report of Changes to Palisades Nuclear Plant Security Plan, Revision 182022-09-12012 September 2022 Report of Changes to Palisades Nuclear Plant Security Plan, Revision 18 PNP 2022-032, 2022 Evacuation Time Estimate Report2022-09-0707 September 2022 2022 Evacuation Time Estimate Report PNP 2022-023, Report of Changes to Palisades Nuclear Plant Security Plan, Revision 172022-08-15015 August 2022 Report of Changes to Palisades Nuclear Plant Security Plan, Revision 17 PNP 2022-014, Report of Changes to Palisades Nuclear Plant Site Emergency Plan, Revision 342022-07-13013 July 2022 Report of Changes to Palisades Nuclear Plant Site Emergency Plan, Revision 34 PNP 2022-016, License Amendment Request: Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2022-07-12012 July 2022 License Amendment Request: Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme PNP 2022-017, Request for Exemptions from Certain Emergency Planning Requirements of 10 CFR 50.47(b); 10 CFR 50.47(c)(2); and 10 CFR Part 50, Appendix E2022-07-11011 July 2022 Request for Exemptions from Certain Emergency Planning Requirements of 10 CFR 50.47(b); 10 CFR 50.47(c)(2); and 10 CFR Part 50, Appendix E PNP 2022-019, & Big Rock Point - Notification of Expected Date of Transfer of Ownership of Nuclear Plants to Holtec Palisades, LLC; and Notification of Receipt of All Required Regulatory Approvals2022-06-24024 June 2022 & Big Rock Point - Notification of Expected Date of Transfer of Ownership of Nuclear Plants to Holtec Palisades, LLC; and Notification of Receipt of All Required Regulatory Approvals PNP 2022-010, Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel2022-06-13013 June 2022 Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel PNP 2022-011, Termination of the Emergency Response Data System (Eros) Link2022-06-13013 June 2022 Termination of the Emergency Response Data System (Eros) Link 2024-08-02
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARPNP 2024-027, Supplement to License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2024-07-0909 July 2024 Supplement to License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations PNP 2024-003, License Amendment Request to Approve the Biasi Critical Heat Flux (CHF) Correlation for Use with the Palisades Main Steam Line Break (MSLB) Analysis2024-05-24024 May 2024 License Amendment Request to Approve the Biasi Critical Heat Flux (CHF) Correlation for Use with the Palisades Main Steam Line Break (MSLB) Analysis PNP 2024-005, License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations2024-05-0101 May 2024 License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations PNP 2024-001, License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations2024-02-0909 February 2024 License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations PNP 2023-030, License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2023-12-14014 December 2023 License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations PNP 2022-031, License Amendment Request, Revise License Condition to Eliminate Cyber Security Plan Requirements2022-09-14014 September 2022 License Amendment Request, Revise License Condition to Eliminate Cyber Security Plan Requirements PNP 2022-016, License Amendment Request: Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2022-07-12012 July 2022 License Amendment Request: Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme ML21152A1112021-06-0101 June 2021 Proposed Changes (mark-up) to Palisades Plant - Appendix a Technical Specifications, and Appendix B Environmental Protection Plan Pages ML21152A1122021-06-0101 June 2021 Page Change Instructions and Retyped Pages for the Palisades Plant Appendix a Permanently Defueled Technical Specifications and Appendix B Environmental Protection Plan ML21152A1132021-06-0101 June 2021 Palisade Nuclear Plant - Proposed Technical Specifications Bases Changes ML21152A1102021-06-0101 June 2021 Evaluation of the Proposed Changes PNP 2020-042, and Big Rock Point Application for Order Consenting to Transfers of Control of Licenses and Approving Conforming License Amendments2020-12-23023 December 2020 and Big Rock Point Application for Order Consenting to Transfers of Control of Licenses and Approving Conforming License Amendments RS-19-040, Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2019-06-25025 June 2019 Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML19149A3042019-05-28028 May 2019 Enclosure Attachment 1 (Continued) to Pnp 2019-028: Operating License Page Change Instructions and Retyped Renewed Facility Operating License Pages ML19149A3022019-05-28028 May 2019 Enclosure to Pnp 2019-028: Response to Request for Additional Information - License Amendment Request to Revise Existing Facility Operating License Conditions Regarding NFPA 805 Modifications ML19149A3032019-05-28028 May 2019 Enclosure Attachment 1 to Pnp 2019-028: Renewed Facility Operating License Page Markups PNP 2019-007, License Amendment Request to Change the Full Compliance Implementation Date for the Fire Protection Program Transition License Condition for Required Modifications2019-03-0808 March 2019 License Amendment Request to Change the Full Compliance Implementation Date for the Fire Protection Program Transition License Condition for Required Modifications CNRO-2019-00003, Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 42019-01-31031 January 2019 Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 4 PNP 2018-040, License Amendment Request to Revise Existing Facility Operating License Conditions Regarding NFPA 805 Modifications - Proposed Renewed Facility Operating License Page Changes (Markup)2018-11-0101 November 2018 License Amendment Request to Revise Existing Facility Operating License Conditions Regarding NFPA 805 Modifications - Proposed Renewed Facility Operating License Page Changes (Markup) ML18305B3222018-11-0101 November 2018 License Amendment Request to Revise Existing Facility Operating License Conditions Regarding NFPA 805 Modifications - Proposed Operating License Change ML18305B3212018-11-0101 November 2018 License Amendment Request to Revise Existing Facility Operating License Conditions Regarding NFPA 805 Modifications ML18270A3232018-09-27027 September 2018 Attachment 2: Probabilistic Risk Assessment Technical Adequacy ML18270A3262018-09-27027 September 2018 Attachment 5: Proposed Technical Specification Bases Changes ML18270A3252018-09-27027 September 2018 Attachment 4: Page Change Instructions and Revised Pages, and Appendix a Technical Specifications ML18270A3222018-09-27027 September 2018 Attachment 1: Description and Evaluation of Technical Specifications Changes ML18270A3282018-09-27027 September 2018 Attachment 7: Traveler TSTF-425 Versus Pnp RFOL SR Applicability Cross Reference Table ML18270A3272018-09-27027 September 2018 Attachment 6: No Significant Hazards Consideration PNP 2018-025, License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control- Risk Informed Technical Specification Task Force (RITSTF) Initiative 5b.2018-09-27027 September 2018 License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control- Risk Informed Technical Specification Task Force (RITSTF) Initiative 5b. ML18270A3242018-09-27027 September 2018 Attachment 3: Proposed Changes and Appendix a Technical Specifications Pages ML18152A9292018-05-30030 May 2018 License Amendment Request to Revise Emergency Diesel Generator Degraded Voltage Surveillance Requirement PNP 2018-004, Supplement to License Amendment Request to Change the Full Compliance Implementation Date for the Fire Protection Program Transition License Condition for Required Modifications2018-01-24024 January 2018 Supplement to License Amendment Request to Change the Full Compliance Implementation Date for the Fire Protection Program Transition License Condition for Required Modifications PNP 2017-066, License Amendment Request to Change the Full Compliance Implementation Date for the Fire Protection Program Transition License Condition for Required Modifications2017-11-0101 November 2017 License Amendment Request to Change the Full Compliance Implementation Date for the Fire Protection Program Transition License Condition for Required Modifications PNP 2017-059, License Amendment Request Supplement - Cyber Security Plan Implementation Schedule2017-10-17017 October 2017 License Amendment Request Supplement - Cyber Security Plan Implementation Schedule PNP 2017-035, License Amendment Request - Administrative Controls for a Permanently Defueled Condition2017-07-27027 July 2017 License Amendment Request - Administrative Controls for a Permanently Defueled Condition PNP 2017-007, License Amendment Request, Cyber Security Plan Implementation Schedule2017-03-30030 March 2017 License Amendment Request, Cyber Security Plan Implementation Schedule PNP 2016-046, License Amendment Request for Editorial and Administrative Changes to Technical Specifications2016-11-0909 November 2016 License Amendment Request for Editorial and Administrative Changes to Technical Specifications PNP 2016-049, License Amendment Request: Control Rod Drive Exercise Surveillance2016-08-22022 August 2016 License Amendment Request: Control Rod Drive Exercise Surveillance PNP 2016-005, License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal and Clarify SR Usage Rule Application to Section 5.5 Testing.2016-07-11011 July 2016 License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal and Clarify SR Usage Rule Application to Section 5.5 Testing. PNP 2016-001, License Amendment Request - Revision to the Requirements for Steam Generator Tube Inspections and Repair Criteria in the Cold Leg Tube Sheet Region2016-03-0303 March 2016 License Amendment Request - Revision to the Requirements for Steam Generator Tube Inspections and Repair Criteria in the Cold Leg Tube Sheet Region PNP 2015-035, License Amendment Request - Cyber Security Plan Implementation Schedule2015-06-11011 June 2015 License Amendment Request - Cyber Security Plan Implementation Schedule PNP 2014-111, Revised License Condition - License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors2014-12-18018 December 2014 Revised License Condition - License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors PNP 2014-091, Supplement to License Amendment Request to Revise Emergency Response Organization Staff Augmentation Response Times2014-12-0909 December 2014 Supplement to License Amendment Request to Revise Emergency Response Organization Staff Augmentation Response Times ML14237A1442014-12-0808 December 2014 Issuance of Amendment Cyber Security Plan Implementation Schedule PNP 2014-049, License Amendment Request to Implement 10 CFR 50.61 a, Alternate Fracture Toughness Requirements for Protection Against Pressurized Thermal Shock Events.2014-07-29029 July 2014 License Amendment Request to Implement 10 CFR 50.61 a, Alternate Fracture Toughness Requirements for Protection Against Pressurized Thermal Shock Events. ML14211A5252014-07-29029 July 2014 WCAP-17628-NP, Revision 1, Palisades, Alternate Pressurized Thermal Shock (PTS) Rule Evaluation. PNP 2014-042, License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-426, Revise or Add Actions to Preclude Into LCO 3.0.3 - RITSTF Initiatives 6b & 6c, Using the Consolidated Line Item Improvement Process2014-06-11011 June 2014 License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-426, Revise or Add Actions to Preclude Into LCO 3.0.3 - RITSTF Initiatives 6b & 6c, Using the Consolidated Line Item Improvement Process PNP 2013-086, License Amendment Request - Cyber Security Plan Implementation Schedule2013-12-30030 December 2013 License Amendment Request - Cyber Security Plan Implementation Schedule PNP 2013-044, License Amendment Request to Revise Emergency Response Organization Staff Augmentation Response Times2013-06-25025 June 2013 License Amendment Request to Revise Emergency Response Organization Staff Augmentation Response Times PNP 2012-074, License Amendment Request - Technical Specifications Change to Add LCO 3.0.8 on the Lnoperability of Snubbers2012-09-0606 September 2012 License Amendment Request - Technical Specifications Change to Add LCO 3.0.8 on the Lnoperability of Snubbers PNP 2012-046, License Amendment Request - Cyber Security Plan Implementation Schedule Milestones2012-06-20020 June 2012 License Amendment Request - Cyber Security Plan Implementation Schedule Milestones 2024-07-09
[Table view] Category:Technical Specification
MONTHYEARPNP 2024-001, License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations2024-02-0909 February 2024 License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations PNP 2023-030, License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2023-12-14014 December 2023 License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations ML22102A2482022-04-14014 April 2022 Request for Additional Information Regarding License Amendment Request for Permanently Defueled Technical Specifications ML21152A1112021-06-0101 June 2021 Proposed Changes (mark-up) to Palisades Plant - Appendix a Technical Specifications, and Appendix B Environmental Protection Plan Pages ML21152A1132021-06-0101 June 2021 Palisade Nuclear Plant - Proposed Technical Specifications Bases Changes RS-19-039, Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls2019-06-26026 June 2019 Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls PNP 2019-017, Submittal of Changes to Technical Specifications Bases2019-03-21021 March 2019 Submittal of Changes to Technical Specifications Bases PNP 2018-052, Supplement to License Amendment Request -Application to Revise Technical Specifications to Adopt TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control- Risk Informed Technical Specification Task Force.2018-11-16016 November 2018 Supplement to License Amendment Request -Application to Revise Technical Specifications to Adopt TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control- Risk Informed Technical Specification Task Force. ML18270A3222018-09-27027 September 2018 Attachment 1: Description and Evaluation of Technical Specifications Changes ML18270A3242018-09-27027 September 2018 Attachment 3: Proposed Changes and Appendix a Technical Specifications Pages ML18270A3252018-09-27027 September 2018 Attachment 4: Page Change Instructions and Revised Pages, and Appendix a Technical Specifications ML18270A3262018-09-27027 September 2018 Attachment 5: Proposed Technical Specification Bases Changes PNP 2017-067, Submittal of Changes to Palisades Nuclear Plant Technical Specifications Bases2017-11-0808 November 2017 Submittal of Changes to Palisades Nuclear Plant Technical Specifications Bases PNP 2016-046, License Amendment Request for Editorial and Administrative Changes to Technical Specifications2016-11-0909 November 2016 License Amendment Request for Editorial and Administrative Changes to Technical Specifications PNP 2014-088, Report to NRC of Changes to Technical Specifications Bases2014-09-15015 September 2014 Report to NRC of Changes to Technical Specifications Bases PNP 2014-042, License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-426, Revise or Add Actions to Preclude Into LCO 3.0.3 - RITSTF Initiatives 6b & 6c, Using the Consolidated Line Item Improvement Process2014-06-11011 June 2014 License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-426, Revise or Add Actions to Preclude Into LCO 3.0.3 - RITSTF Initiatives 6b & 6c, Using the Consolidated Line Item Improvement Process PNP 2012-097, Report to NRC of Changes to Technical Specifications Bases2012-11-0909 November 2012 Report to NRC of Changes to Technical Specifications Bases PNP 2011-032, Report to NRC of Changes of Technical Specifications Bases2011-04-25025 April 2011 Report to NRC of Changes of Technical Specifications Bases PNP 2011-018, Regarding License Amendment Request to Extend the Containment Type a Leak Rate Test Frequency to 15 Years2011-04-0606 April 2011 Regarding License Amendment Request to Extend the Containment Type a Leak Rate Test Frequency to 15 Years ML1020105792010-07-20020 July 2010 License Amendment Request for Emergency Diesel Generator Fuel Oil and Lube Oil Systems ML0930604142009-11-0202 November 2009 Report of Changes to Technical Specifications Bases ML0913501812009-05-14014 May 2009 Supplement to License Amendment Request: Changes to Technical Specification Administrative Controls Section ENOC-09-00009, Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions2009-04-27027 April 2009 Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions ML0901602382009-02-0606 February 2009 Issuance of Amendment Spent Fuel Pool Region I Storage Requirements ML0827404452008-11-20020 November 2008 Issuance of Amendment Eliminate License Condition 2.F ML0822703122008-08-14014 August 2008 Report of Changes to Technical Specifications Bases ML0723203952007-08-16016 August 2007 Report of Changes to Technical Specifications Bases ML0722201032007-07-25025 July 2007 Submittal of Technical Specifications Bases Changes ML0718002162007-06-28028 June 2007 License Amendment Request: Replacement of Containment Sump Buffer ML0714501052007-05-31031 May 2007 Technical Specifications Pages Re Programs and Manuals for Steam Generator ML0631803592006-11-0606 November 2006 License Amendment Request: Realistic Large Break Loss-of-Coolant Accident ML0628303852006-09-25025 September 2006 Alternative Source Term- Proposed License Amendment ML0623000332006-08-17017 August 2006 Report of Changes to Technical Specifications Bases ML0524102132005-08-22022 August 2005 Report of Changes to Technical Specifications Bases ML0425904452004-09-0202 September 2004 Report of Changes to Technical Specifications Bases ML0421604082004-08-0202 August 2004 Tech Spec Pages for Amendment No. 217 Regarding the Relocating of the Primary Coolant System Pressure, Cold-Leg Temperature and Flow Departure from Nucleate Boiling Limits to the Core Operating Limits Report ML0404204242004-01-30030 January 2004 Application for Technical Specification Improvement to Eliminate Requirements for Hydrogen Recombiners and Hydrogen/Oxygen Monitors Using the Consolidated Line Item Improvement Process ML0330001112003-10-17017 October 2003 Report of Changes to Technical Specifications Bases ML0328900502003-10-0606 October 2003 License Amendment Request: Increase Rated Thermal Power, Response to Request for Additional Information ML0316110532003-06-0303 June 2003 License Amendment Request: Increase Rated Thermal Power ML0303805792003-01-22022 January 2003 Technical Specifications and Bases ML0231701012002-10-31031 October 2002 Report of Changes to Technical Specifications Bases ML0207201012002-03-0101 March 2002 License Amendment Request, Surveillance Requirement Frequency for Containment Spray Nozzle Inspections ML0205901512002-02-26026 February 2002 Amendment No. 207 Retechnical Specification on Spent Fuel Pool Boron Concentration ML18344A3791978-06-15015 June 1978 Proposed Technical Specification Changes on Power Distribution Limits ML18353B1461978-03-0909 March 1978 Iodine Removal System - Proposed Technical Specification Changes ML18353A8671978-02-22022 February 1978 Letter Proposed Technical Specifications Change on Heatup and Cooldown Curves for Cycle 3 Operation ML18353A8741978-02-21021 February 1978 Letter Proposed Technical Specifications Change on Steam Generator Operating Allowance ML18347A1881978-01-0303 January 1978 Proposed Technical Specifications Changes Relating to Overpressure Protection System ML18353B1451977-11-11011 November 1977 Transmittal of Technical Specification - Deletion of Annual Operating Report 2024-02-09
[Table view] Category:Bases Change
MONTHYEARML21152A1132021-06-0101 June 2021 Palisade Nuclear Plant - Proposed Technical Specifications Bases Changes PNP 2019-017, Submittal of Changes to Technical Specifications Bases2019-03-21021 March 2019 Submittal of Changes to Technical Specifications Bases ML18270A3242018-09-27027 September 2018 Attachment 3: Proposed Changes and Appendix a Technical Specifications Pages ML18270A3222018-09-27027 September 2018 Attachment 1: Description and Evaluation of Technical Specifications Changes ML18270A3252018-09-27027 September 2018 Attachment 4: Page Change Instructions and Revised Pages, and Appendix a Technical Specifications ML18270A3262018-09-27027 September 2018 Attachment 5: Proposed Technical Specification Bases Changes PNP 2017-067, Submittal of Changes to Palisades Nuclear Plant Technical Specifications Bases2017-11-0808 November 2017 Submittal of Changes to Palisades Nuclear Plant Technical Specifications Bases PNP 2016-046, License Amendment Request for Editorial and Administrative Changes to Technical Specifications2016-11-0909 November 2016 License Amendment Request for Editorial and Administrative Changes to Technical Specifications PNP 2014-088, Report to NRC of Changes to Technical Specifications Bases2014-09-15015 September 2014 Report to NRC of Changes to Technical Specifications Bases PNP 2014-042, License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-426, Revise or Add Actions to Preclude Into LCO 3.0.3 - RITSTF Initiatives 6b & 6c, Using the Consolidated Line Item Improvement Process2014-06-11011 June 2014 License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-426, Revise or Add Actions to Preclude Into LCO 3.0.3 - RITSTF Initiatives 6b & 6c, Using the Consolidated Line Item Improvement Process PNP 2012-097, Report to NRC of Changes to Technical Specifications Bases2012-11-0909 November 2012 Report to NRC of Changes to Technical Specifications Bases PNP 2011-032, Report to NRC of Changes of Technical Specifications Bases2011-04-25025 April 2011 Report to NRC of Changes of Technical Specifications Bases ML1020105792010-07-20020 July 2010 License Amendment Request for Emergency Diesel Generator Fuel Oil and Lube Oil Systems ML0930604142009-11-0202 November 2009 Report of Changes to Technical Specifications Bases ML0913501812009-05-14014 May 2009 Supplement to License Amendment Request: Changes to Technical Specification Administrative Controls Section ML0822703122008-08-14014 August 2008 Report of Changes to Technical Specifications Bases ML0723203952007-08-16016 August 2007 Report of Changes to Technical Specifications Bases ML0722201032007-07-25025 July 2007 Submittal of Technical Specifications Bases Changes ML0623000332006-08-17017 August 2006 Report of Changes to Technical Specifications Bases ML0524102132005-08-22022 August 2005 Report of Changes to Technical Specifications Bases ML0425904452004-09-0202 September 2004 Report of Changes to Technical Specifications Bases ML0330001112003-10-17017 October 2003 Report of Changes to Technical Specifications Bases ML0303805792003-01-22022 January 2003 Technical Specifications and Bases ML0231701012002-10-31031 October 2002 Report of Changes to Technical Specifications Bases ML0207201012002-03-0101 March 2002 License Amendment Request, Surveillance Requirement Frequency for Containment Spray Nozzle Inspections ML18353B1461978-03-0909 March 1978 Iodine Removal System - Proposed Technical Specification Changes ML18353A8671978-02-22022 February 1978 Letter Proposed Technical Specifications Change on Heatup and Cooldown Curves for Cycle 3 Operation ML18353A8741978-02-21021 February 1978 Letter Proposed Technical Specifications Change on Steam Generator Operating Allowance ML18353B1451977-11-11011 November 1977 Transmittal of Technical Specification - Deletion of Annual Operating Report ML18348A7721977-09-19019 September 1977 Transmittal of Proposed Technical Specification Changes ML18353A8891977-05-17017 May 1977 Letter Request for Change to Technical Specifications on Minimum Qualification Requirements for Radiation Protection Manager (Health Physicist) ML18348A6861977-05-17017 May 1977 Letter Request for Change to Technical Specifications on Minimum Qualification Requirements for Radiation Protection Manager (Health Physicist) ML18353A8681977-03-0101 March 1977 Letter Technical Specifications Changes for Inservice Inspection and Testing Requirements 2021-06-01
[Table view] |
Text
~Entergy Entergy Nuclear Operations, Inc.
Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043-9530 Tel 269 764 2000 Charles F. Arnone Site Vice President PNP 2016-046 November 9, 2016 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
SUBJECT:
License Amendment Request for Editorial and Administrative Changes to Technical Specifications Palisades Nuclear Plant Docket No. 50-255 Renewed Facility Operating License No. DPR-20
Dear Sir or Madam:
Pursuant to 10 CFR 50.90, Entergy Nuclear Operations, Inc. (ENO) requests Nuclear Regulatory Commission (NRC) review and approval of a proposed amendment to revise the Renewed Facility Operating License (RFOL) for the Palisades Nuclear Plant (PNP).
ENO proposes to revise PNP RFOL, Appendix A, Technical Specifications (TS), by making changes to the TS Limiting Condition for Operation 3.0.9 and TS 5.5.10, "Ventilation Filter Testing Program."
The proposed changes have been evaluated in accordance with 10 CFR 50.91 (a)(1) using criteria in 10 CFR 50.92(c), and it has been determined that the changes involve no significant hazards consideration. The bases for this determination are included in Attachment 1, which also includes a description of the proposed changes, a technical evaluation, a regulatory evaluation, and an environmental consideration. Attachment 2 provides the marked-up RFOL and TS pages showing the proposed changes.
Attachment 3 provides the revised RFOL and TS pages reflecting the proposed changes.
ENO requests approval of the proposed changes by November 9,2017. Once approved, the amendment shall be implemented within 30 days.
PLP 2016-046 Page 2 of 2 In accordance with 10 CFR 50.91 (b), a copy of this application, with attachments, is being provided to the designated State of Michigan official.
I declare under penalty of perjury that the foregoing is true and correct. Executed on November 9, 2016.
Sincerely, CFA/jse Attachments: 1. Description and Assessment of Requested Change
- 2. Proposed Renewed Facility Operating License and Technical Specifications Pages
- 3. Page Change Instructions and Revised Renewed Facility Operating License and Revised Technical Specifications Pages cc: Administrator, Region III, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC State of Michigan
Attachment 1 Description and Assessment of Requested Change 1.0
SUMMARY
DESCRIPTION Pursuant to 10 CFR 50.90, Entergy Nuclear Operations, Inc. (ENO) requests Nuclear Regulatory Commission (NRC) review and approval of a proposed amendment to revise the Renewed Facility Operating License, Appendix A, Technical Specifications (TS), for the Palisades Nuclear Plant (PNP).
The proposed changes consist of the following:
- An editorial change to TS Limiting Condition for Operation (LCO) 3.0.9 to correct a typographical error and
- An administrative change to correct and modify the description of components within TS 5.5.10, "Ventilation Filter Testing Program."
2.0 DETAILED DESCRIPTION The proposed changes to the TS are described in detail below:
- 1. A change is proposed which would add a period at the end of the first paragraph in TS LCO 3.0.9, at the bottom of TS page 3.0-3.
2.. Changes are proposed to TS Section 5.5.10, "Ventilation Filter Testing Program,"
concerning the descriptions of the control room ventilation and fuel handling area ventilation systems.
The flowrate parameters specified in TS Section 5.5.1 Oa are corrected to reflect the flowrate parameters of the control room air filter unit fans (V-26A and V-26B) rather than the control room ventilation main supply fans (V-95 and V-96).
In addition, this section is modified to replace all component identification numbers for the systems' fans or filters with the noun names of ventilation systems (e.g., V-8A and V-8B are replaced by a reference to the fuel handling area ventilation system).
3.0 TECHNICAL EVALUATION
- 1. The proposed change to TS LCO 3.0.9 would add a period at the end of the last sentence in the first paragraph in TS LCO 3.0.9, located at the bottom of TS page 3.0-3.
1 of 5
LCO 3.0.9 was added to the TS in Amendment No. 252 (Reference 1). The associated license amendment request (Reference 2) inadvertently omitted the period at the end of this paragraph.
This change is considered to be an editorial change because the addition of the period at the end of the sentence would not change the content or meaning of the sentence.
- 2. The proposed changes to TS Section 5.5.10, "Ventilation Filter Testing Program,"
would correct and modify the descriptions of the control room ventilation and fuel handling area ventilation systems.
Specifically, TS Section 5.5.1 Oa is corrected to reflect the flowrate of each of the control room ventilation air filter unit fans (V-26A and V-26B) rather than each of the control room ventilation air handling unit fans (V-95 and V-96).
The control room ventilation system contains two independent, redundant trains that recirculate and filter the air within the control room envelope. Each train has a control room air filter unit that is provided for emergency operation. Each filter unit includes upstream high-efficiency particulate air (HEPA) filters, two banks of carbon adsorber trays, downstream HEPA filters, and a fan (either V-26A or V-26B).
Each control room ventilation system train also contains an air handling unit that provides conditioned air to the control room. Each air handling unit has a fan (either V-95 or V-96) operating at a flowrate of 12,500 cfm each. During normal operations, one air handling unit is in service with the air handling unit associated with the other train in standby.
Since the HEPA filters are located in the control room air filter units, TS Section 5.5.10a. should provide the flowrate associated with each of the control room ventilation air filter unit fans (Le., 3200 cfm, +10%, -5%) rather than the flowrate for each of the control room ventilation air handling unit fans (12,500 cfm, +/- 10%).
This correction is considered to be an administrative change. The incorrect fan and flowrate information was added to the TS in Amendment No. 174 (Reference 3). The associated license amendment request (Reference 4) did not discuss why the control room ventilation air handling unit fan information was added rather than the control room ventilation air filter unit fan information. The correction of this erroneous information does not affect the practicability of the testing performed under the ventilation filter testing program, and has no effect on testing program acceptance criteria.
In addition, this change would modify TS Section 5.5.10 by replacing the identification numbers for the systems' components with the acronym for the noun names of the ventilation systems (e.g., fans V-SA and V-SB would be replaced by the acronym (FHAV) for the fuel handling area ventilation system). This change 2 of 5
would improve clarity and conforms with Section 5.5.11, "Ventilation Filter Testing Program (VFTP)," of NUREG-1432, "Standard Technical Specifications, Combustion Engineering Plants," Revision 4 (Reference 5).
4.0 REGULATORY EVALUATION
4.1 No Significant Hazards Consideration Entergy Nuclear Operations, Inc. has evaluated whether or not a significant hazards consideration is involved with the proposed amendment by focusing on the three standards set forth in 10 CFR 50.92, "Issuance of amendment," as discussed below:
- 1. Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?
Response: No The proposed changes to the Palisades Nuclear Plant (PNP) Technical Specifications (TS) are editorial or administrative in nature. The changes make an editorial correction in the TS, and correct and modify the component descriptions in the ventilation filter testing program TS. These changes do not alter accident analysis assumptions, add any initiators, or affect the function of plant systems or the manner in which systems are operated, maintained, modified, tested, or inspected. The proposed changes do not require any plant modifications which affect the performance capability of the structures, systems, and components relied upon to mitigate the consequences of postulated accidents, and have no impact on the probability or consequences of an accident previously evaluated.
Therefore, the proposed changes do not involve a significant increase in the probability or consequences of an accident previously evaluated.
- 2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?
Response: No The proposed changes to the PNP TS are editorial or administrative in nature.
The changes make an editorial correction in the TS, and correct and modify the component descriptions within the ventilation filter testing program TS. The proposed changes do not alter accident analysis assumptions, add any initiators, or affect the function of plant systems or the manner in which systems are operated, maintained, modified, tested, or inspected. The proposed changes do not require any plant modifications which affect the performance capability of the structures, systems, and components relied upon to mitigate the consequences of 3015
postulated accidents, and do not create the possibility of a new or different kind of accident from any accident previously evaluated.
Therefore, the proposed changes do not create the possibility of a new or different kind of accident from any previously evaluated.
- 3. Does the proposed change involve a significant reduction in a margin of safety?
Response: No Plant safety margins are established through limiting conditions for operation, limiting safety system settings, and safety limits specified in the technical specifications. The proposed changes to the TS are editorial or administrative in nature and do not impact any safety margins. Because there is no impact on established safety margins as a result of these changes, the proposed change does not involve a significant reduction in a margin of safety.
Therefore, the proposed changes do not involve a significant reduction in a margin of safety.
4.2 Conclusions In conclusion, based on the considerations discussed above, (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
5.0 ENVIRONMENTAL CONSIDERATION
The proposed amendment does not involve (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluent that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure. Accordingly, the proposed amendment meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22(c)(9).
Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed amendment.
6.0 REFERENCES
- 1. NRC letter, "Palisades Nuclear Plant -Issuance of Amendment Re:
Application for Technical Specification Change (TSTF-427) to Add Limiting Condition for Operation 3.0.9 regarding the Unavailability of Barriers Using the Consolidated Line Item Improvement Process (TAC No. MF3215)," dated October 22,2014 (ADAMS Accession No. ML14283A287) 4 of 5
- 2. ENO letter, PNP 2013-076, "License Amendment Request - Application for Technical Specification Change (TSTF-427) to Add LCO 3.0.9 Regarding the Unavailability of Barriers Using the Consolidated Line Item Improvement Process," December 11, 2013 (ADAMS Accession No. ML13345B160)
- 3. NRC letter, "Palisades Plant - Issuance of Amendment Re: Revision of Administrative Controls and Related Technical Specifications (TAC No.
M94287)," October 31,1996 (ADAMS Accession No. ML020840145)
- 4. Consumers Power Company letter, "Technical Specification Change Request
- Revision of Administrative Controls," dated December 11, 1995
- 5. NRC NUREG-1432, "Standard Technical Specifications, Combustion Engineering Plants," Volume 1, Revision 4, dated April 2012 (ADAMS Accession Number ML12102A165) 5 of 5
Attachment 2 Proposed Renewed Facility Operating License and Technical Specifications Pages (showing proposed changes; additions are highlighted and deletions are strikethrough)
Four pages follow
(1) Pursuant to Section 104b of the Act, as amended, and 10 CFR Part 50, "Licensing of Production and Utilization Facilities," (a) ENP to possess and use, and (b) ENO to possess, use and operate, the facility as a utilization facility at the designated location in Van Buren County, Michigan, in accordance with the procedures and limitation set forth in this license; (2) ENO, pursuant to the Act and 10 CFR Parts 40 and 70, to receive, possess, and use source and special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Updated Final Safety Analysis Report, as supplemented and amended; (3) ENO, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use byproduct, source, and special nuclear material as sealed sources for reactor startup, reactor instrumentation, radiation monitoring equipment calibration, and fission detectors in amounts as required; (4) ENO, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source, or special nuclear material for sample analysis or instrument calibration, or associated with radioactive apparatus or components; and (5) ENO, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operations of the facility.
C. This renewed operating license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations in 10 CFR Chapter I and is subject to all applicable provisions of the Act; to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1) ENO is authorized to operate the facility at steady-state reactor core power levels not in excess of 2565.4 Megawatts thermal (100 percent rated power) in accordance with the conditions specified herein.
(2) The Technical Specifications contained in Appendix A, as revised through Amendment No. 2eS xxx, and the Environmental Protection Plan contained in Appendix B are hereby incorporated in the license. ENO shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
(3) Fire Protection ENO shall implement and maintain in effect all provisions of the approved fire protection program that comply with 10 CFR 50.48(a) and 10 CFR 50.48(c), as specified in the license amendment request dated December 12, 2012, as supplemented by letters dated February 21 , 2013, September 30, 2013, October 24,2013, December 2,2013, April 2, 2014, May 7,2014, June 17, 2014, Renewed License No. DPR-20 Amendment No. 262, 294, 256
LCO Applicability 3.0 3.0 LCO APPLICABILITY LCO 3.0.7 Special Test Exception (STE) LCOs in each applicable LCO section allow specified Technical Specifications (TS) requirements to be changed to permit performance of special tests and operations. Unless otherwise specified, all other TS requirements remain unchanged. Compliance with STE LCOs is optional. When an STE LCO is desired to be met but is not met, the ACTIONS of the STE LCO shall be met. When an STE LCO is not desired to be met, entry into a MODE or other specified condition in the Applicability shall only be made in accordance with the other applicable Specifications.
LCO 3.0.8 When one or more required snubbers are unable to perform their associated support function(s), any affected supported LCO(s) are not required to be declared not met solely for this reason if risk is assessed and managed, and:
- a. the snubbers not able to perform their associated support function(s) are associated with only one train or subsystem of a multiple train or subsystem supported system or are associated with a single train or subsystem supported system and are able to perform their associated support function within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />; or
- b. the snubbers not able to perform their associated support function(s) are associated with more than one train or subsystem of a multiple train or subsystem supported system and are able to perform their associated support function within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
At the end of the specified period the required snubbers must be able to perform their associated support function(s), or the affected supported system LCO(s) shall be declared not met.
LCO 3.0.9 When one or more required barriers are unable to perform their related support function(s), any supported system LCO(s) are not required to be declared not met solely for this reason for up to 30 days provided that at least one train or subsystem of the supported system is OPERABLE and supported by barriers capable of providing their related support function(s), and risk is assessed and managed. This specification may be concurrently applied to more than one train or subsystem of a multiple train or subsystem supported system provided at least one train or subsystem of the supported system is OPERABLE and the barriers supporting each of these trains or subsystems provide their related support function(s) for different categories of initiating events.
Palisades Nuclear Plant 3.0-3 Amendment No. 2M, 252
Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.9 Secondary Water Chemistry Program A program shall be established, implemented and maintained for monitoring of secondary water chemistry to inhibit steam generator tube degradation and shall include:
- a. Identification of a sampling schedule for the critical variables and control points for these variables,
- b. Identification of the procedures used to measure the values of the critical variables,
- c. Identification of process sampling pOints, which shall include monitoring the discharge of the condensate pumps for evidence of condenser in-leakage,
- d. Procedures for the recording and management of data,
- e. Procedures defining corrective actions for all off-control point chemistry conditions, and
- f. A procedure identifying (a) the authority responsible for the interpretation of the data, and (b) the sequence and timing of administrative events required to initiate corrective actions.
5.5.10 Ventilation Filter Testing Program A program shall be established to implement the following required testing of Control Room Ventilation (CRV) and Fuel Handling Area Ventilation (FHAV) systems at the frequencies specified in Regulatory Guide 1.52, Revision 2 (RG 1.52), and in accordance with RG 1.52 and ASME N51 0-1989, at the system flowrates and tolerances specified below*:
- a. Demonstrate for each of the ventilation systems that an inplace test of the High Efficiency Particulate Air (HEPA) filters shows a penetration and system bypass < 0.05% for the CRV system and < 1.00% for the ~
Handling Area Ventilation System FHAV system when tested in accordance with RG 1.52 and ASME N510-1989:
Ventilation System Flowrate (CFM)
V 81'. or V 8B FHAV (single fan operation) 7300 +/-20%
V 81'. and V 8B FHAV (dual fan operation) 10,000 +/-20%
V 95 or V 96 CRV 12,500 :I:: 10% 3200 +10% -5%
Palisades Nuclear Plant 5.0-14 Amendment No. +89, 230
Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.10 Ventilation Filter Testing Program (continued)
- b. Demonstrate for each of the ventilation systems that an inplace test of the charcoal adsorber shows a penetration and system bypass < 0.05% for the CRV system and < 1.00% for the Fblel!=landling AFea '1entilatien System FHAV system when tested in accordance with RG 1 .52 and ASME N510-1989.
Ventilation System Flowrate (CFMl
'I 8A and 'I 88 FHAV (dual fan operation} 10,000+/-20%
'I 26A and 'I 268 CR 3200 +10% -5%
- c. Demonstrate for each of the ventilation systems that a laboratory test of a sample of the charcoal adsorber, when obtained as described in RG 1.52 shows the methyl iodide penetration less than the value specified below when tested in accordance with ASTM D3803-1989 at a temperature of
~ 30°C and equal to the relative humidity specified as follows:
Ventilation System Penetration Relative Humidity
¥F-eeFHAV 6.00% 95%
'1FC 26A and '1FC 268 CR~ 0.157% 70%
- d. For each of the ventilation systems, demonstrate the pressure drop across the combined HEPA filters, the prefilters, and the charcoal adsorbers is less than the value specified below when tested in accordance with RG 1.52 and ASME N510-1989:
Ventilation System Delta P (In HgO) Flowrate (CFM)
V SA and '188 FHAV (dual fan operation) 6.0 10,000 +/-20%
VF 26A and VF 268 CRV 8.0 3200 +10% -5%
- e. Demonstrate that the heaters for the CRV system dissipates the following specified value +/- 20% when tested in accordance with ASME N510-1989:
Ventilation System Wattage V!=IX 26A and '1!=1X 268 CR~ 15 kW The provisions of SR 3.0.2 and SR 3.0.3 are applicable to the Ventilation Filter Testing Program frequencies.
- Should the 720-hour limitation on charcoal adsorber operation occur during a plant operation requiring the use of the charcoal adsorber - such as refueling - testing may be delayed until the completion of the plant operation or up to 1,500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> of filter operation; whichever occurs first.
Palisades Nuclear Plant 5.0-15 Amendment No. +89, 230
Attachment 3 Page Change Instructions and Revised Renewed Facility Operating License and Revised Technical Specifications Pages Five pages follow
Page Change Instructions ATTACHMENT TO LICENSE AMENDMENT NO. xxx RENEWED FACILITY OPERATING LICENSE NO. DPR-20 DOCKET NO. 50-255 Remove the following pages of Renewed Facility Operating License (RFOL) and Appendix A, Technical Specifications (TS), and replace with the attached revised pages.
The revised pages are identified by amendment number and contain a line in the margin indicating the area of change.
REMOVE INSERT RFOL, page 3 RFOL, page 3 TS, page 3.0-3 TS, page 3.0-3 TS, pages 5.0-14 and 5.0-15 TS, pages 5.0-14 and 5.0-15
(1) Pursuant to Section 104b of the Act, as amended, and 10 CFR Part 50, "licensing of Production and Utilization Facilities," (a) ENP to possess and use, and (b) ENO to possess, use and operate, the facility as a utilization facility at the designated location in Van Buren County, Michigan, in accordance with the procedures and limitation set forth in this license; (2) END, pursuant to the Act and 10 CFR Parts 40 and 70, to receive, possess, and use source and special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Updated Final Safety Analysis Report, as supplemented and amended; (3) END, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use byproduct, source, and special nuclear material as sealed sources for reactor startup, reactor instrumentation, radiation monitoring equipment calibration, and fission detectors in amounts as required; (4) END, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source, or special nuclear material for sample analysis or instrument calibration, or associated with radioactive apparatus or components; and (5) END, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operations of the facility.
C. This renewed operating license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations in 10 CFR Chapter I and is subject to all applicable provisions of the Act; to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1) END is authorized to operate the facility at steady-state reactor core power levels not in excess of 2565.4 Megawatts thermal (100 percent rated power) in accordance with the conditions specified herein.
(2) The Technical Specifications contained in Appendix A, as revised through Amendment No. xxx, and the Environmental Protection Plan contained in Appendix B are hereby incorporated in the license. END shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
(3) Fire Protection ENO shall implement and maintain in effect all provisions of the approved fire protection program that comply with 10 CFR 50.48(a) and 10 CFR 50.48(c), as specified in the license amendment request dated December 12, 2012, as supplemented by letters dated February 21 , 2013, September 30, 2013, October 24,2013, December 2,2013, April 2, 2014, May 7,2014, June 17,2014, Renewed License No. DPR-20 Amendment No. 2eS, xxx
LCO Applicability 3.0 3.0 LCO APPLICABILITY LCO 3.0.7 Special Test Exception (STE) LCOs in each applicable LCO section allow specified Technical Specifications (TS) requirements to be changed to permit performance of special tests and operations. Unless otherwise specified, all other TS requirements remain unchanged. Compliance with STE LCOs is optional. When an STE LCO is desired to be met but is not met, the ACTIONS of the STE LCO shall be met. When an STE LCO is not desired to be met, entry into a MODE or other specified condition in the Applicability shall only be made in accordance with the other applicable Specifications.
LCO 3.0.8 When one or more required snubbers are unable to perform their associated support function(s), any affected supported LCO(s) are not required to be declared not met solely for this reason if risk is assessed and managed, and:
- a. the snubbers not able to perform their associated support function(s) are associated with only one train or subsystem of a multiple train or subsystem supported system or are associated with a single train or subsystem supported system and are able to perform their associated support function within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />; or
- b. the snubbers not able to perform their associated support function(s) are associated with more than one train or subsystem of a multiple train or subsystem supported system and are able to perform their associated support function within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
At the end of the specified period the required snubbers must be able to perform their associated support function(s), or the affected supported system LCO(s) shall be declared not met.
LCO 3.0.9 When one or more required barriers are unable to perform their related support function(s), any supported system LCO(s) are not required to be declared not met solely for this reason for up to 30 days provided that at least one train or subsystem of the supported system is OPERABLE and supported by barriers capable of providing their related support function(s), and risk is assessed and managed. This specification may be concurrently applied to more than one train or subsystem of a multiple train or subsystem supported system provided at least one train or subsystem of the supported system is OPERABLE and the barriers supporting each of these trains or subsystems provide their related support function(s) for different categories of initiating events.
Palisades Nuclear Plant 3.0-3 Amendment No. ~, xxx
Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.9 Secondary Water Chemistry Program A program shall be established, implemented and maintained for monitoring of secondary water chemistry to inhibit steam generator tube degradation and shall include:
- a. Identification of a sampling schedule for the critical variables and control points for these variables,
- b. Identification of the procedures used to measure the values of the critical variables,
- c. Identification of process sampling points, which shall include monitoring the discharge of the condensate pumps for evidence of condenser in-leakage,
- d. Procedures for the recording and management of data,
- e. Procedures defining corrective actions for all off-control point chemistry conditions, and
- f. A procedure identifying (a) the authority responsible for the interpretation of the data, and (b) the sequence and timing of administrative events required to initiate corrective actions.
5.5.1 0 Ventilation Filter Testing Program A program shall be established to implement the following required testing of Control Room Ventilation (CRV) and Fuel Handling Area Ventilation (FHAV) systems at the frequencies specified in Regulatory Guide 1.52, Revision 2 (RG 1.52), and in accordance with RG 1.52 and ASME N51 0-1989, at the system flowrates and tolerances specified below*:
- a. Demonstrate for each of the ventilation systems that an inplace test of the High Efficiency Particulate Air (HEPA) filters shows a penetration and system bypass < 0.05% for the CRV system and < 1.00% for the FHAV system when tested in accordance with RG 1.52 and ASME N51 0-1989:
Ventilation System Flowrate (CFM)
FHAV (single fan operation) 7300 +/-20%
FHAV (dual fan operation) 10,000 +/-20%
CRV 3200 +10% -5%
Palisades Nuclear Plant 5.0-14 Amendment No. ~, xxx
Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.10 Ventilation Filter Testing Program (continued)
- b. Demonstrate for each of the ventilation systems that an inplace test of the charcoal adsorber shows a penetration and system bypass < 0.05% for the CRV system and < 1.00% for the FHAV system when tested in accordance with RG 1.52 and ASME N510-1989.
Ventilation System Flowrate (CFM)
FHAV (dual fan operation) 10,000 +/-20%
CRV 3200 +10% -5%
- c. Demonstrate for each of the ventilation systems that a laboratory test of a sample of the charcoal adsorber, when obtained as described in RG 1.52 shows the methyl iodide penetration less than the value specified below when tested in accordance with ASTM D3803-1989 at a temperature of
- 5 30°C and equal to the relative humidity specified as follows:
Ventilation System Penetration Relative Humidity FHAV 6.00% 95%
CRV 0.157% 70%
- d. For each of the ventilation systems, demonstrate the pressure drop across the combined HEPA filters, the prefilters, and the charcoal adsorbers 'is less than the value specified below when tested in accordance with RG 1.52 and ASME N510-1989:
Ventilation System Delta P (In HgO) Flowrate (CFM)
FHAV (dual fan operation) 6.0 10,000 +/-20%
CRV 8.0 3200 +10% -5%
- e. Demonstrate that the heaters for the CRV system dissipates the following specified value +/-20% when tested in accordance with ASME N510-1989:
Ventilation System Wattage CRV 15kW The provisions of SR 3.0.2 and SR 3.0.3 are applicable to the Ventilation Filter Testing Program frequencies.
- Should the 720-hour limitation on charcoal adsorber operation occur during a plant operation requiring the use of the charcoal adsorber - such as refueling - testing may be delayed until the completion of the plant operation or up to 1 ,500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> of filter operation; whichever occurs first.
Palisades Nuclear Plant 5.0-15 Amendment No. ~,xxx