ML16299A475
| ML16299A475 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 08/31/1987 |
| From: | Lieberman J NRC OFFICE OF ENFORCEMENT (OE) |
| To: | Tucker H DUKE POWER CO. |
| References | |
| EA-87-101, NUDOCS 8709010400 | |
| Download: ML16299A475 (1) | |
Text
AUG 31 1987 Docket No. 50-287 EA 87-101 Duke Power Company ATTN: Mr. H. B. Tucker, Vice President Nuclear Production Post Office Box 33189 Charlotte, North Carolina 28242 Gentlemen:
This will acknowledge receipt of your letter dated August 14, 1987 and your check for $25,000 in payment for the civil penalty proposed by NRC in a letter dated July 17, 1987. The corrective actions described in your letter will be examined during future inspections.
Sincerely, Original Sit'ed By James Lieberman, Director Office of Enforcement DISTRIBUTION:
JMTaylor, DEDO TMartin, DEDRO SSohinki, OGC JLieberman, OE HWong, OE JNGrace, RH Enforcement Coordinators RI, RII, RIII, RIV, RV TMurley, NRR OE br n HWong J bra 8/z. /87 8/4 /87 8709010400 870831 fDR ADOCK 05000287 PDR