ML16298A386
ML16298A386 | |
Person / Time | |
---|---|
Site: | Susquehanna |
Issue date: | 10/18/2016 |
From: | Susquehanna |
To: | Gerlach R Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
Download: ML16298A386 (40) | |
Text
Oct. 18, 2016 Page 1 of 2
- MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2016-35234 USER INFORMATION:
GERLACH*ROSEY M EMPL#: 028401 CA#: 0363 Address: NUCSA2 Phone#: 542-3194 TRANSMITTAL INFORMATION:
TO: GERLACH*ROSEY M 10/18/2016 LOCATION: USNRC FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL. WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.
ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.
TRMl - TECHNICAL REQUIREMENTS MANUAL UNIT 1 REMOVE MANUAL TABLE OF CONTENTS DATE: 09/12/2016 ADD MANUAL TABLE OF CONTENTS DATE: 10/17/2016 CATEGORY: DOCUMENTS TYPE: TRMl
Oct. 18, 2016 Page 2 of 2
- ID: TEXT 3.11.2.6 REMOVE: REV: 6 ADD: REV: 7 CATEGORY: DOCUMENTS TYPE: TRMl ID: TEXT 3.3.4 ADD: REV: 10 REMOVE: REV: 9 CATEGORY: DOCUMENTS TYPE: TRMl ID: TEXT LOES REMOVE: REV: 87 ADD: REV: 88 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE. UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX .
SSES MANUAL Manual Name: TRMl Manual Title : TECHNICAL REQUIREMENTS MANUAL UNIT 1 Table Of Contents Issue Date: 10/17 / 2016 Procedure Name Rev I ssue Date Change ID Change Nulllber TEXT LOES 88 10/17 / 2016 Title : LI ST OF EFFECTIVE SECTIONS TEXT TOC 25 04 / 28 / 2015
Title:
TABLE OF CONTENTS TEXT 1.1 1 01/31 / 2014
Title:
USE AND APPLICATION DEFINITIONS TEXT 2.1 2 04 / 28 / 2015
Title:
PLANT PROGRAMS AND SETPOINTS PLANT PROGRAMS
- TEXT 2 . 2 10 01/31 / 2014 Title : PLANT PROGRAMS AND SETPOINTS INSTRUMENT TRIP SETPOINT TABLE TEXT 3 . 0 5 03 / 05 / 2015
Title:
TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILI TY & SURVEILLANCE (TRS)
APPLICABILITY TEXT 3 . 1.1 1 11 / 09/2007 Title : REACTIVITY CONTROL SYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS - ARI) INSTRUMENTATION TEXT 3.1 . 2 0 11 /1 8/2002
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT 3.1 . 3 5 04 / 16 / 2009 Title : REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3 . 1 . 4 0 11 / 18/2002
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION &
CHECK VALVE TEXT 3 .2. 1 17 03 /31/ 2016
- Page .l Title : CORE OPERATING LIMITS REPORT (COLR) of li Report Date: 10 / 17 / 16
SSES MANUAL Manual Name: TRMl Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.3.1 0 11/18/2002
Title:
INSTRUMENTATION RADIATION MONITORING INSTRUMENTATION TEXT 3.3.2 3 03/31/2011
Title:
INSTRUMENTATION SEISMIC MONITORING INSTRUMENTATION TEXT 3.3.3 2 11/09/2007
Title:
INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3 . 4 10 10/17 /2016
Title:
INSTRUMENTATION TRM POST - ACCIDENT MONITORING INSTRUMENTATION TEXT 3.3 . 5 0 11/18/2002 Tit l e : INSTRUMENTATION THIS PAGE I NTENTIONALLY LEFT BLANK
~"~~~~ TEXT 3 . 3 . 6 TEXT 3.3.7 4 04/29/2014 Title : INSTRUMENTATION TRM ISOLATION ACTUATION INSTRUMENTATION 2 11/10/2015 Title : INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3.3.8 1 10/22/2003 Ti t le: INSTRUMENTATION TRM RPS INSTRUMENTATION TEXT 3 . 3.9 3 04/17/2008 Tit le : OPRM INSTRUMENTATION CONFIGURATION TEXT 3.3.10 1 12/14/2004 Title : INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS TEXT 3.3.11 1 10/22/2003 Title : INSTRUMENTATION MVP ISOLATION INSTRUMENTATION
- _,?~..;
TEXT 3.3.12 Page 2.
1
Title:
WATER MONITORING INSTRUMENTATION of 16 03/05/2015 Report Date: 10/17/16
SSES MANUAL Manual Name: TRMl Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.4.1 1 04/26/2006
Title:
REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY TEXT 3.4.2 1 04/16/2009
Title:
REACTOR COOLANT SYSTEM STRUCTURAL INTEGRITY TEXT 3.4.3 1 11/09/2007
Title:
REACTOR COOLANT SYSTEM HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITORS TEXT 3.4.4 2 04/17/2008
Title:
REACTOR COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT 3.4.5 1 04/26/2006
Title:
REACTOR COOLANT SYSTEM REACTOR VESSEL MATERIALS TEXT 3.4.6 2 04/25/2013
Title:
REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION TEXT 3.5.1 1 02/04/2005
Title:
EMERGENCY CORE COOLING AND RCIC ADS MANUAL INHIBIT TEXT 3.5.2 1 11/09/2007
Title:
EMERGENCY CORE COOLING AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT 3.5.3 0 11/18/2002
Title:
EMERGENCY CORE COOLING AND RCIC LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1 0 11/18/2002
Title:
CONTAINMENT VENTING OR PURGING TEXT 3.6.2 2 04/29/2014
Title:
SUPPRESSION CHAMBER TO DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3 0 11/18/2002
Title:
CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION Page .l of .l.Q. Report Date: 10/17/16
SSES MANUAL Manual Name: TRMl Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.6.4 0 11/18/2002
Title:
CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT 3.7.1 0 11/18/2002
Title:
PLANT SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW) SHUTDOWN TEXT 3.7.2 0 11/18/2002
Title:
PLANT SYSTEMS ULTIMATE HEAT SINK (illIS) AND GROUND WATER LEVEL TEXT 3.7.3.l 3 09/08/2016
Title:
PLANT SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT 3.7.3.2 3 04/16/2009
Title:
PLANT SYSTEMS SPRAY AND SPRINKLER SYSTEMS TEXT 3.7.3.3 4
Title:
PLANT SYSTEMS C02 SYSTEMS TEXT 3.7.3.4 2 05/16/2016 04/16/2009
Title:
PLANT SYSTEMS HALON SYSTEMS TEXT 3.7.3.5 2 04/16/2009
Title:
PLANT SYSTEMS FIRE HOSE STATIONS TEXT 3.7.3.6 2 04/16/2009
Title:
PLANT SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT 3.7.3.7 1 04/26/2006
Title:
PLANT SYSTEMS FIRE RATED ASSEMBLIES TEXT 3.7.3.8 10 09/27/2012
Title:
PLANT SYSTEMS FIRE DETECTION INSTRUMENTATION TEXT 3.7.4 Page 1-1 04/26/2006
Title:
PLANT SYSTEMS SOLID RADWASTE SYSTEM of li Report Date: 10/17/16
SSES MANUAL
- - Manual Name: TRMl Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.7.5.1 1 03/05/2015
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT 3.7.5.2 0 11/18/2002
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT 3.7.5.3 1 04/26/2006
Title:
PLANT SYSTEMS LIQUID HOLDUP TANKS TEXT 3.7.6 3 06/04/2012
Title:
PLANT SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3.7.7 2 09/05/2008
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING TEXT 3.7.8 5 03/05/2015
Title:
PLANT SYSTEMS SNUBBERS TEXT 3.7.9 2 01/31/2014
Title:
PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10 1 12/14/2004
Title:
PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)
TEXT 3.7.11 0 04/16/2009
Title:
STRUCTURAL INTEGRITY TEXT 3.8.1 2 04/05/2010
Title:
ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT 3.8.2.1 2 11/09/2007
Title:
ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
CONTINUOUS TEXT 3.8:2.2 2 12/14/2004
- +
Title:
ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
AUTOMATIC Page .5. of li Report Date: 10/17/16
SSES MANUAL Manual Name: TRMl Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.8.3 2 03/05/2015
Title:
ELECTRICAL POWER DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT 3.8.4 0 11/18/2002
Title:
ELECTRICAL POWER 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT 3.8.5 1 11/14/2013
Title:
ELECTRICAL POWER DEGRADED VOLTAGE PROTECTION TEXT 3.8.6 1 12/08/2011
Title:
ELECTRICAL POWER EMERGENCY SWITCHGEAR ROOM COOLING TEXT 3.8.7 1 06/15/2009
Title:
BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT 3.9.1 0 11/18/2002
Title:
REFUELING OPERATIONS DECAY TIME TEXT 3.9.2 0 11/18/2002
Title:
REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3 0 11/18/2002
Title:
REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.l 1 04/26/2006
Title:
MISCELLANEOUS SEAL SOURCE CONTAMINATION TEXT 3.10.2 2 08/08/2006 Titleg MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3 2 06/15/2010
Title:
MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT 3.10.4 Page .Q 2 04/17 /2008
Title:
MISCELLANEOUS LEADING EDGE FLOW METER (LEFM) of li Report Date: 10/17/16
SSES MANUAL Manual Name: TRMl Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.11.1.1 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION TEXT 3.11.1.2 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS DOSE TEXT 3.11.1.3 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID WASTE TREATMENT SYSTEM TEXT 3.11.1.4 2 10/09/2012
Title:
RADIOACTIVE EFFLUENTS LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT 3 . 11 . 1. 5 3 03/05/2015
Title:
RADIOACTIVE EFFLUENTS RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT 3.11.2.1 3 04/26/2006
Title:
RADIOACTIVE EFFLUENTS DOSE RATE TEXT 3.11.2.2 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS DOSE - NOBLE GASES TEXT 3.11.2.3 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATE FORM TEXT 3.11.2.4 0 11/18/2002
Title:
RADIOACTIVE EFFLUENTS GASEOUS RADWASTE TREATMENT SYSTEM TEXT 3.11.2.5 4 07/03/2013
Title:
RADIOACTIVE EFFLUENTS VENTILATION EXHAUST TREATMENT SYSTEM TEXT 3.11.2.6 7 10/17/2016
Title:
RADIOACTIVE EFFLUENTS RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT 3.11.3 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS TOTAL DOSE Page 1 of 1.Q. Report Date: 10/17/16
SSES MANUAL Manual Name: TID11 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.11.4.1 5 03/05/2015
Title:
RADIOACTIVE EFFLUENTS MONITORING PROGRAM TEXT 3.11.4.2 2 04/26/2006
Title:
RADIOACTIVE EFFLUENTS LAND USE CENSUS TEXT 3.11.4.3 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS INTERLABORATORY COMPARISON PROGRAM TEXT 3.12.1 0 11/19/2002
Title:
LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL POOL STORAGE POOL TEXT 3.12.2 4 04/17/2008
Title:
LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS TEXT 3.12.3 0 11/19/2002
Title:
LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENT TEXT 4.1 0 08/31/1998
Title:
ADMINISTRATIVE CONTROLS ORGANIZATION TEXT 4.2 0 08/31/1998
Title:
ADMINISTRATIVE CONTROLS REPORTABLE EVENT ACTION TEXT 4.3 0 08/31/1998
Title:
ADMINISTRATIVE CONTROLS SAFETY LIMIT VIOLATION TEXT 4.4 1 12/18/2008
Title:
ADMINISTRATIVE CONTROLS PROCEDURES & PROGRAMS TEXT 4.5 0 08/31/1998
Title:
ADMINISTRATIVE CONTROLS REPORTING REQUIREMENTS TEXT 4.6 0 08/31/1998
Title:
ADMINISTRATIVE CONTROLS RADIATION PROTECTION PROGRAM Page Ji of .1Q Report Date: 10/17/16
SSES MANUAL
- Manual Name: TRMl Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 4. 7 0 08/31/1998
Title:
ADMINISTRATIVE CONTROLS TRAINING TEXT B3.0 5 03/05/2015
Title:
APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY TEXT B3 .1.1 2 04/29/2014
Title:
REACTIVITY CONTROL SYSTEMS BASES ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT B3.l.2 0 11/19/2002
Title:
REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT B3.l.3 3 03/31/2006
Title:
REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD BLOCK INSTRUMENTATION
- - TEXT B3.l.4 0 11/19/2002
Title:
REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION TEXT B3.2.1 AND CHECK VALVE 0 11/19/2002
Title:
CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT (COLR)
TEXT B3.3.l 1 01/31/2014
Title:
INSTRUMENTATION BASES RADIATION MONITORING INSTRUMENTATION TEXT B3.3.2 2 03/31/2011
Title:
INSTRUMENTATION BASES SEISMIC MONITORING INSTRUMENTATION TEXT B3.3.3 3 12/18/2008
Title:
INSTRUMENTATION BASES METEOROLOGICAL MONITORING INSTRUMENTATION TEXT B3.3.4 6 09/08/2016
Title:
INSTRUMENTATION BASES TRM POST ACCIDENT MONITORING (PAM) INSTRUMENTATION
- TEXT B3.3.5 Page -2_
2 11/09/2007
Title:
INSTRUMENTATION BASES THIS PAGE INTENTIONALLY LEFT BLANK of li Report Date: 10/17/16
SSES MANUAL Manual Name: TRMl Manual Title~ TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.3.6 5 01/31/2014
Title:
INSTRUMENTATION BASES TRM ISOLATION ACTUATION INSTRUMENTATION TEXT B3.3.7 2 11/10/2015
Title:
INSTRUMENTATION BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT B3.3.8 1 10/22/2003
Title:
INSTRUMENTATION BASES TRM REACTOR PROTECTION SYSTEM (RPS) INSTRUMENTATION TEXT B3.3.9 3 04/17/2008
Title:
OPRM INSTRUMENTATION TEXT B3.3.10 3 08/09/2010
Title:
INSTRUMENTATION BASES REACTOR RECIRCULATION PUMP MG SET STOPS TEXT B3.3.11 1 10/22/2003
Title:
INSTRUMENTATION BASES MVP ISOLATION INSTRUMENTATION TEXT B3.3.12 0 04/16/2009
Title:
WATER MONITORING INSTRUMENTATION TEXT B3.4.1 0 11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY TEXT B3.4.2 1 04/16/2009
Title:
REACTOR COOLANT SYSTEM BASES STRUCTURAL INTEGRITY TEXT B3.4.3 1 11/09/2007
Title:
REACTOR COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR TEXT B3.4.4 0 11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT B3.4.5 Page 10 0 11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR VESSEL MATERIALS of 1..Q.
Report Date: 10/17/16
SSES MANUAL Manual Name: TRMl Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.4.6 2 04/25/2013
Title:
REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION TEXT B3.5.l 0 11/19/2002
Title:
ECCS AND RCIC BASES ADS MANUAL INHIBIT TEXT B3.5.2 1 11/09/2007
Title:
ECCS AND RCIC BASES ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT B3.5.3 1 11/09/2007
Title:
ECCS AND RCIC BASES LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.l 0 11/19/2002
Title:
CONTAINMENT BASES VENTING OR PURGING TEXT B3.6.2 0 11/19/2002
Title:
CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT B3.6.3 2 04/17/2008
Title:
CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION TEXT B3.6.4 1 12/14/2004
Title:
CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.l 0 11/19/2002
Title:
PLANT SYSTEMS BASES EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN)
TEXT B3.7.2 0 11/19/2002
Title:
PLANT SYSTEMS BASES ULTIMATE HEAT SINK (UHS) GROUND WATER LEVEL TEXT B3.7.3.1 3 06/15/2010
Title:
PLANT SYSTEMS BASES FIRE SUPPRESSION WATER SUPPLY SYSTEM
- TEXT B3.7.3.2 Page 11 2 04/26/2006
Title:
PLANT SYSTEMS BASES SPRAY AND SPRINKLER SYSTEMS of li Report Date: 10/17/16
SSES MANUAL Manual Name: TRMl Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.7.3.3 0 11/19/2002
Title:
PLANT SYSTEMS BASES C02 SYSTEMS TEXT B3.7.3.4 3 04/29/2014
Title:
PLANT SYSTEMS- BASES HALON SYSTEMS TEXT B3.7.3.5 1 04/26/2006
Title:
PLANT SYSTEMS BASES FIRE HOSE STATIONS TEXT B3.7.3.6 1 04/26/2006
Title:
PLANT SYSTEMS BASES YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT B3.7.3.7 0 11/19/2002
Title:
PLANT SYSTEMS BASES FIRE RATED ASSEMBLIES TEXT B3.7.3.8 3 09/27/2012
Title:
PLANT SYSTEMS BASES FIRE DETECTION INSTRUMENTATION TEXT B3.7.4 0 11/19/2002
Title:
PLANT SYSTEMS BASES SOLID RADWASTE SYSTEM TEXT B3.7.5.1 0 11/19/2002
Title:
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT B3.7.5.2 0 11/19/2002
Title:
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT B3.7.5.3 0 11/19/2002
Title:
PLANT SYSTEMS BASES LIQUID HOLDUP TANKS TEXT B3.7.6 4 06/04/2013
Title:
PLANT SYSTEMS BASES ESSW PUMPHOUSE VENTILATION TEXT B3.7.7 Page l l of 2
MONITORING INSTRUMENTATION 16 01/31/2008
Title:
PLANT SYSTEMS BASES MAIN CONDENSER OFF GAS PRETREATMENT LOGARITHMIC. RADIATION Report Date: 10/17/16
SSES MANUAL
- Manual Na:me : TRMl Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.7.8 4 01/31/2014
Title:
PLANT SYSTEMS BASES SNUBBERS TEXT B3.7.9 2 12/08/2011
Title:
PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC TEXT B3.7.10 1 12/14/2004
Title:
PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS TEXT B3.7.11 1 04/14/2010
Title:
STRUCTURAL INTEGRITY TEXT B3.8.l 2 03/10/2010
Title:
ELECTRICAL POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT
Title:
PROTECTIVE DEVICES TEXT B3.8.2.1 ELE~TRICAL CONTINUOUS TEXT B3.8.2.2 0 11/19/2002 POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
1 09/17/2004
Title:
ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
AUTOMATIC TEXT B3.8.3 0 11/19/2002
Title:
ELECTRICAL POWER BASES DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT B3.8.4 0 11/19/2002
Title:
ELECTRICAL POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT B3.8.5 1 11/14/2013
Title:
ELECTRICAL POWER BASES DEGRADED VOLTAGE PROTECTION TEXT B3.8.6 2 12/08/2011
Title:
ELECTRICAL POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING TEXT B3.8.7 2 06/04/2013
Title:
BATTERY MAINTENANCE AND MONITORING PROGRAM Page 13 of 16 Report Date: 10/17/16
SSES MANUAL Manual Name: TRMl Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.9.1 0 11/19/2002 Title.: REFUELING OPERATIONS BASES DECAY TIME TEXT B3.9.2 0 11/19/2002
Title:
REFUELING OPERATIONS BASES COiv'.IMUNICATIONS TEXT B3.9.3 0 11/19/2002
Title:
REFUELING OPERATIONS BASES REFUELING PLATFORM TEXT B3.10.1 0 11/19/2002
Title:
MISCELLANEOUS BASES SEALED SOURCE CONTAMINATION TEXT B3.10.2 1 03/31/2006
Title:
MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT B3.10.3 0 11/19/2002
Title:
MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT B3.10.4 1 04/17/2008
Title:
MISCELLANEOUS BASES LEADING EDGE FLOW METER (LEFM)
TEXT B3 .11.1.1 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS CONCENTRATION TEXT B3.11.1.2 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS DOSE TEXT B3.11.1.3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID WASTE TREATMENT SYSTEM TEXT B3.11.1.4 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.1.5 Page 14 of INSTRUMENTATION 16 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES RADIOACTIVE LIQUID PROCESS MONITORING Report Date: 10/17/16
SSES MANUAL Manual Name: TRMl Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.11.2.1 1 12/14/2004
Title:
RADIOACTIVE EFFLUENTS BASES DOSE RATE TEXT B3.11.2.2 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES DOSE - NOBLE GASES TEXT B3 .11. 2. 3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATES FORM TEXT B3.11.2.4 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES GASEOUS RADWASTE TREATMENT SYSTEM TEXT B3 .11. 2. 5 5 07/03/2013
Title:
RADIOACTIVE EFFLUENTS BASES VENTILATION EXHAUST TREATMENT SYSTEM TEXT B3 .11. 2. 6 2 09/08/2016
Title:
RADIOACTIVE EFFLUENTS BASES RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT B3 .11. 3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES TOTAL DOSE TEXT B3 . 11. 4 . 1 5 03/05/2015
Title:
RADIOACTIVE EFFLUENTS BASES MONITORING PROGRAM TEXT B3.11.4.2 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LAND USE CENSUS TEXT B3.11.4.3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES INTERLABORATORY COMPARISON PROGRAM TEXT B3.12.1 1 10/04/2007
Title:
LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL
- TEXT B3.12.2 Page 15 1 12/03/2010
Title:
LOADS CONTROL PROGRAM BASES HEAVY LOADS REQUIREMENTS of li Report Date: 10/17/16
SSES MANUAL
- ~;-~,
Manual Name: TRMl Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.12.3 0 11/19/2002
Title:
LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS Page 16 of .lQ_
Report Date: 10/17/16
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 88 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
- Section TOC 1.0 Title TABLE OF CONTENTS USE A ND APPLICATION Page TRM I 1.0-1 Effective Date 04/23/2015 10/04/2002 Page TRM I 1.0-2 01/21/2014 Page TRM I 1.0-3 10/04/2002 2.0 PLANT PROGRAMS Page TRM I 2.0- 1 04/23/2015 Pages TRM I 2.0-2 and TRM I 2.0-3 01/28/2005 Page TRM I 2.0-4 06/25/2002 Page TRM I 2.0-5 01/21/2014 Page TRM I 2.0-6 03/27/2008 Page TRM I 2.0-7 05/15/2008 Pages TRM I 2.0-8 and TRM I 2.0-9 01/07/2011 Page TRM I 2.0-1 0 02/02/2010 Page TRM I 2.0- 11 11/15/2004 Page TRM I 2.0-12 03/27/2008 Pages TRM I 2.0-13 and TRM I 2.0-14 11/15/2004 Page TRM I 2.0-15 11/15/2005 3.0 APPLICABILITY Pages TRM I 3.0-1 and TRM I 3.0-2 02/19/2015 Page TRM I 3.0-3 03/15/2002 Page TRM I 3.0-4 02/19/2015 3.1 REACTIVITY CONTROL SYSTEMS Page TRM I 3.1 -1 10/31/2007 Pages TRM I 3.1-2 and TRM I 3.1-3 08/31/1998 Pages 3.1 -4 and 3.1 -5 08/31/1998 Page TRM I 3.1-6 03/22/2006 Page TRM I 3.1-7 04/07/2009 Page TRM I 3.1-8 03/27/2008 Pages TRM I 3.1-9 and TRM I 3.1 -9a 02/18/1999 Page TRM I 3.1-10 02/18/1999 3.2 CORE OPERATING LIMITS REPORT Page TRM I 3.2-1 07/07/1999 Pages TRM I 3.2-2 through TRM I 3.2-63 03/24/2016 3.3 INSTRUMENTATION Pages TRM I 3.3-1 through TRM I 3.3-3 07/16/1999 Page TRM I 3.3-4 and TRM I 3.3-5 10/31/2007 Page TRM I 3.3-6 03/10/2011
- SUSQUEHANNA - UNIT 1 TRM I LOES-1 EFFECTIVE DATE 10/06/2016
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 88 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
- Section Title Page TRM I 3.3-7 Page TRM / 3.3-8 Page TRM / 3.3-9 Page TRM / 3.3-9a Effective Date 10/31/2007 08/31/1998 10/07/2015 06/30/2010 Page TRM / 3.3-10 10/31/2007 Page TRM / 3.3-11 10/07/2015 Page TRM / 3.3-11a 10/06/2016 Page TRM / 3.3-12 03/30/2001 Page TRM / 3.3-13 01/07/2011 Page TRM / 3.3-14 12/14/1998 Page TRM / 3.3-15 04/11/2014 Page TRM I 3.3-16 01/07/2011 Page TRM I 3.3-17 11/04/2015 Page TRM I 3.3-17a 11/04/2015 Page TRM I 3.3-18 10/31/2007 Pages TRM I 3.3-19 through TRM / 3.3-21 10/22/2003 Page TRM / 3.3-22 03/27/2008 Page TRM / 3.3-22a 11/15/2004 Pages TRM I 3.3-22b through TRM I 3.3-22d 03/22/2006 Page TRM / 3.3-23 12/03/2004 Pages TRM I 3.3-24 and TRM I 3.3-25 05/16/2003 Page TRM I 3.3-26 10/22/2003 Page TRM / 3.3-27 02/19/2015
- 3.4 Page TRM/ 3.3-28 REACTOR COOLANT SYSTEM Page TRM I 3.4-1 Pages TRM I 3.4-2 through TRM I 3.4-5 Pages TRM I 3.4-6 through TRM I 3.4-8 04/07/2009 03/31/2006 10/23/1998 04/01/2009 Page TRM I 3.4-9 08/31/1998 Page TRM / 3.4-10 10/31/2007 Page TRM I 3.4-11 08/31/1998 Page TRM / 3.4-12 03/27/2008 Page TRM / 3.4-13 03/31/2006 Pages TRM / 3.4-14 and TRM / 3.4-15 04/25/2013 3.5 EMERGENCY CORE COOLING AND RCIC Page TRM / 3.5-1 01/28/2005 Pages TRM / 3.5-2 and TRM I 3.5-3 08/31/1998 Pages TRM I 3.5-4 and TRM / 3.5-5 10/31/2007 Pages 3.5-6 and 3.5-7 08/31/1998
- SUSQUEHANNA - UNIT 1 TRM I LOES-2 EFFECTIVE DATE 10/06/2016
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 88 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
- Section 3.6 Title CONTAINMENT Page 3.6-1 Pages TRM I 3.6-2 and TRM I 3.6-2a Page 3.6-3 Effective Date 08/31/1998 04/16/2014 08/31/1998 Page TRM I 3.6-4 01/07/2002 Page 3.6-5 08/31/1998 Pages TRM I 3.6-6 through TRM I 3.6-8 12/31/2002 3.7 PLANT SYSTEMS Pages 3.7~1 through 3.7-3 08/31/1998 Page TRM I 3. 7-4 03/31/2006 Pages TRM I 3.7-5 through TRM I 3.7-7 08/18/2016 Page TRM I 3. 7-8 08/02/1999 Pages TRM I 3.7-9 and TRM I 3.7-10 04/07/2009 Page TRM I 3.7-11 12/29/1999 Page TRM I 3.7-12 08/02/1999 Page TRM I 3.7.13 05/09/2016 Page TRM I 3.7-14 08/09/2005 Pages TRM I 3.7-15 and TRM I 3.7-16 08/02/1999 Page TRM I 3.7-17 04/07/2009 Page TRM / 3.7-18 08/02/1999 Page TRM / 3.7-19 04/07/2009 I
I I
e Pages TRM / 3.7-20 through TRM / 3.7-22 Page TRM I 3. 7-23 .
Page TRM / 3.7-24 Page TRM I 3. 7-25 08/02/1999 04/07/2009 03/31/2006 08/02/1999 Page TRM / 3. 7-26 09/25/2012 Page TRM / 3.7-27 11/24/2011 I
Pages TRM / 3.7-28 through TRM / 3.7-34a 09/25/2012 Page TRM I 3. 7-35 03/31/2006 Pages TRM / 3.7-36 and TRM / 3.7-37 02/01/1999 Page TRM / 3.7-38 02/19/2015 Page TRM I 3. 7-39 08/31/1998 Page TRM / 3.7-40 03/31/2006 Page TRM / 3.7-41 05/24/2012 Pages TRM / 3.7-41a through TRM / 3.7-41c 05/24/2012 Page TRM / 3.7-42 09/04/2008 Page TRM I 3. 7-43 08/31/1998 Page TRM / 3.7-44 02/19/2015 Pages TRM / 3.7-45 and TRM / 3.7-46 10/05/2006 Page TRM / 3. 7-47 06/07/2007
- SUSQUEHANNA - UNIT 1 TRM I LOES-3 EFFECTIVE DATE 10/06/2016
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 88 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
- Section Title Page TRM I 3.7-48 Page TRM I 3. 7-49 Page TRM I 3. 7-50 Page TRM I 3.7-51 Effective Date 10/05/2006 06/07/2007 01/21/2014 08/16/2006 Page TRM I 3.7-52 12/03/2004 Page TRM I 3. 7-53 04/15/2003 Page TRM I 3. 7-54 07/29/1999 Pages TRM I 3.7-55 through TRM I 3.7-57 0:4/01/2009 3.8 ELECTRICAL POWER Page TRM I 3.8-1 0410212002 Page TRM I 3.8-2 01/28/2005 Pages TRM I 3.8-3 and TRM /3.8-4 03/25/2010 Pages TRM I 3.8-5 and TRM I 3.8-6 0410212002 Page TRM I 3.8-7 10/31/2007 Pages TRM I 3.8-8 through TRM I 3.8-10 12/03/2004 Page TRM I 3.8-11 09/03/2004 Page TRM I 3.8-12 12/03/2004 Page TRM I 3.8-13 02/19/2015 Page TRM I 3.8-14 08/31/1998 Pages TRM I 3.8-15 through TRM I 3.8-17 0410212002 Page 3.8-18 08/31/1998 Page TRM I 3.8-*19 0410212002
- Page 3.8-20 08/31/1998 Pages TRM I 3.8-21 and TRM I 3.8-22 06/06/1999 Page TRM I 3.8-23 11/07/2013 Pages TRM I 3.8-24 and TRM I 3.8-25 11/30/2011 Page TRM I 3. 8-26 05/28/2009 Page TRM I 3.8-27 11/29/2006 Pages TRM I 3.8-28 and TRM I 3.8-29 05/28/2009 3.9 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 08/31/1998 3.10 MISCELLANEOUS Page TRM I 3.10-1 03/31/2006 Pages TRM I 3.10-2 and TRM I 3.10-3 08/31/1998 Page TRM I 3.10-4 08/01/2006 Pages TRM I 3.10-5 and TRM I 3.10-6 03/22/2006 Page TRM I 3.10-7 06/10/2010 Page TRM I 3.10-8 03/27/2008
- SUSQUEHANNA - UNIT 1 TRM I LOES-4 EFFECTIVE DATE 10/06/2016
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 88 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
- Section 3.11 Title RADIOACTIVE EFFLUENTS Page TRM / 3.11-1 Pages TRM / 3.11-2 and TRM / 3.11-3 Page TRM / 3.11-4 Effective Date 03/31/2006 08/31/1998 03/31/2006 Page TRM / 3.11-5 08/31/1998 Page TRM / 3.11-6 03/31/2006 Pages TRM / 3.11-7 and TRM / 3.11-8 08/31/1998 Pages TRM / 3.11-9 and TRM / 3.11-10 10/09/2012 Pages TRM / 3.11-1 'I and TRM / 3.11-12 08/31/1998 Page TRM / 3.11-13 02/19/2015 Page TRM / 3.~ 1-14 12/03/2004 "Pages 3.11-15 and 3.11-16 09/01/1998 Page TRM / 3.11-17 03/31/2006 Page 3.11-18 08/3V1998 Page TRM / 3.11-19 08/15/2005 Pages TRM / 3.11-20 and TRM / 3.11-21 03/31/2006 Page TRM / 3.11-22 0410212002 Page TRM / 3.11-23 11/14/2006 Page TRM / 3.11-24 06/18/2013 Page TRM / 3.11-25 04/12/2007 Page TRM I 3.11-26 01/21/2004 Page TRM / 3.11-27 08/11/2016 Page TRM / 3.11-28 10/06/2016 Page TRM / 3.11-29 Page TRM I 3.11.30 Page TRM / 3.11.31 Page TRM I 3.11.32 Page TRM / 3.11-33 Page TRM I 3.11-34 12/03/2004 01/21/2004 08/11/2016 10/06/2016 03/31/2006 08/31/1998
,J Page TRM I 3.11-35 03/31/2006 Pages TRM I 3.11-36 through TRM I 3.11-39 11/30/2005 Page TRM / 3.11-40 02/19/2015 Pages TRM I 3.11-41 through TRM I 3.11-43 08/31/1998 Page TRM / 3.11-44 08/01/2006 Page TRM / 3.11-45 03/31/2006 Page 3.11-46 08/31/1998 Page TRM/ 3.11-47 03/31/2006 3.12 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM I 3.12-3 02/05/1999 Page TRM / 3.12-4 03/14/2008
- Page TRM / 3.12-5 02/05/1999 4.0 ADMINISTRATIVE CONTROLS Pages 4.0-1 through 4.0-3 08/31/1998 Page TRM I 4.0-4 12/11/2008 Pages 4.0-5 through 4.0-8 08/31/1998
--~-:.:::~-:.
SUSQUEHANNA - UNIT 1 TRM I LOES-5 EFFECTIVE DATE 10/06/2016
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 88 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
- Section B 3.0 Title APPLICABILITY BASES Pages TRM I B 3.0-1 through TRM I B 3.0-3 Page TRM I B 3.0-4 Page TRM I B 3.0-4a and TRM I B 3.0-4b Effective Date 08/31/1998 02/19/2015 02/19/2015 Page TRM I B 3.0-5 02/19/2015 Page TRM I B 3.0-6 08/31/1998 Page TRM I B 3.0-7 04/12/2007 Pages TRM I B 3.0-8 and TRM I B 3.0-9 08/31/1998 Pages TRM I B 3.0-10 and TRM I B 3.0-11 03/15/2002 Page TRM I B 3.0-12 11/30/2005 Pages TRM I B 3.0-13 through TRM I B 3.0-15 02/19/2015 B 3.1 REACTIVITY CONTROL SYSTEMS BASES Page TRM I B 3.1-1 07/13/1999 Page TRM I B 3.1-2 04/16/2014 Page TRM I B 3.1-3 10/31/2007 Page B 3.1-4 08/31/1998 Page TRM I B 3.1-5 11/15/2005 Pages TRM I B 3.1-6 and TRM I B 3.1-7 03/22/2006 Page TRM I B 3.1-8 02/18/1999 B 3.2 CORE OPERATING LIMITS BASES Page B 3.2-1 08/31/1998
- B 3.3 INSTRUMENTATION BASES Page TRM I B 3.3-1 Page TRM I B 3.3-2 Page TRM I B 3.3-2a Page TRM I B 3.3-3 01/21/2014 03/10/2011 10/31/2007 12/11/2008 Page TRM I B 3.3-3a 10/31/2007 Page TRM I B 3.3-4 06/30/2010 Pages TRM I B 3.3-5 and TRM I B 3.3-5a 08/11/2016 Page TRM I B 3.3-6 06/30/2010 Page TRM I B 3.3-7 10/07/2015 Page TRM I B. 3.3-8 .06/30/2010 Page TRM I B 3.3-9 10/31/2007 Pages TRM I B 3.3-10 through TRM I B 3.3-12 01/07/2011 Page TRM I B 3.3-13 01/21/2014 Page TRM I B 3.3-14 06/25/2002 Page TRM I B 3.3-14a 11/04/2015 Page TRM I B 3.3-14b 11/04/2015 Page TRM I B 3.3-14c 11/04/2015 Pages TRM I B 3.3-15 and TRM I B 3.3-16 10/22/2003 Page TRM I B 3.3-17 03/22/2006 Pages TRM I B 3.3-17a through TRM I B 3.3-17c 03/22/2006 Page TRM I B 3.3-17d 03/27/2008
- SUSQUEHANNA - UNIT 1 TRM I LOES-6 EFFECTIVE DATE 10/06/2016
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 88 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
- Section Title Pages TRM I B 3.3-17e and TRM I B 3.3-17f Pages TRM I B 3.3-18 and TRM I B 3.3-19 Page TRM I B 3.3-20 Page TRM I B 3.3-21 Effective Date 03/22/2006 08/03/2010 10/22/2003 05/16/2003 Pages TRM I B 3.3-22 and TRM I B 3.3-23 04/07/2009 B 3.4 REACTOR COOLANT SYSTEM BASES Page B 3.4-1 08/31/1998 Pages TRM I B 3.4-2 and TRM I B 3.4-3 04/01/2009 Pages TRM I B 3.4-4 and TRM I B 3.4-4a 10/31/2007 Page TRM I B 3.4-5 10/15/1999 Page B 3.4-6 08/31/1998 Pages TRM I B 3.4-7 and TRM I B 3.4-8 04/25/2013 B 3.5 ECCS AND RCIC BASES Pages B 3.5-1 and B 3.5-2 08/31/1998 Pages TRM I B 3.5-3 through TRM I B 3.5-5 10/31/2007 B 3.6 CONTAINMENT BASES Page TRM I B 3.6-1 07/26/2001 Page TRM I B 3.6-2 02/01/1999 Page B 3.6-3 08/31/1998 Page TRM I B 3.6-4 03/27/2008 Page TRM *1 B 3.6-5 04/04/2007 Page TRM I B 3.6-6 12/03/2004 Pages TRM I B.3.6-7 through TRM I B 3.6-11 12/31/2002 B 3.7 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 08/31/1998 Page TRM I B 3.7-3 06/10/2010 Page TRM I B 3.7-3a 12/27/2007 Page TRM I B 3.7-4 03/31/2006 Page TRM I B 3.7-5 08/02/1999 Page TRM I B 3.7-6 03/31/2006 Pages TRM I B 3.7-7 and TRM I B 3.7-7a 08/02/1999 Page TRM I B 3.7-8 05/29/2013 Page TRM I B 3.7-9 04/11/2014 Page TRM I B 3.7-10 08/02/1999 Page TRM I B 3.7-10a 03/31/2006 Page TRM I B 3. 7-11 08/02/1999 Page TRM I B 3.7-11a 03/31/2006 Pages TRM I B 3.7-12 and TRM I B 3.7-13 08/02/1999 Pages TRM I B 3.7-14 and TRM I B 3.7-14a 09/25/2012
- SUSQUEHANNA - UNIT 1 TRM I LOES-7 EFFECTIVE DATE 10/06/2016
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 88 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
- Section Title Page TRM I B 3.7-14b Pages TRM I B 3.7-15 and TRM I B 3.7-16 Pages B 3.7-17 through B 3.7-20 Page TRM I B 3.7-21 Effective Date 11/24/2011 02/01/1999 08/31/1998 05/29/2013 P~ges TRM I B 3.7-21a through TRM I B 3.7-21d 05/24/2012 Pages TRM I B 3.7-21e through TRM I B 3.7-21g 05/29/2013 Page TRM I B 3.7-22 and.TRM I B 3.7-23 01/30/2008 Page TRM I B 3.7-24 10/05/2006 Page TRM I B 3.7-25 01/21/2014 Pages TRM I B 3.7-26 through TRM I B 3.7-28 10/05/2006 Pages TRM I B 3.7-29 and TRM I B 3.7-30 06/07/2007 Page TRM I B 3.7-30a 10/05/2006 Page TRM I B 3.7-30b 01/21/2014 Page TRM I B 3.7-31 11/30/2011 Page TRM I B 3.7-32 03/09/2001 Page TRM I B 3.7-33 04/15/2003 Page TRM I B 3.7-34 12/03/2004 Page TRM I B 3.7-35 0710512000 Pages TRM I B 3. 7-36 through TRM I B 3. 7-39 04/01/2009 Page TRM I B 3.7-40 04/08/2010 B 3.8 ELECTRICAL POWER BASES Page TRM I B 3.8-1 04/02/2002 Page TRM I B 3.8-2 01/28/2005 Page TRM I B 3.8-2a 03/01/2010 Page TRM I B 3.8-3 0410212002 Page TRM I B 3.8-3a 04/02/2002 Page TRM I B 3.8-4 09/03/2004 Page TRM I B 3.8-4a 0410212002 Page B 3.8-5 08/31/1998 Pages TRM I B 3.8-6 through TRM I B 3.8-15 0410212002 Page TRM I B 3.8-16 11/07/2013 Page TRM I B 3.8-17 11/30/2011 Pages TRM I B 3.8-17a and TRM I B 3.8-17b 11/30/2011 Pages TRM I B 3.8-18 through TRM I B 3.8-20 05/29/2013 Pages TRM* / B 3.8-21 and TRM I B 3.8-22 05/28/2009
. Page TRM I B 3.8-23 05/29/2013 Page TRM I B 3.8-24 05/28/2009 B.3.9 REFUELING OPERATIONS BASES Pages B 3.9-1 through B 3.9-7 08/31/1998 SUSQUEHANNA - UNIT 1 TRM I LOES-8 EFFECTIVE DATE 10/06/2016
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 88 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
- Section B 3.10 Title MISCELLANEOUS BASES Page B 3.10-1 Pages TRM I B 3.10-2 and TRM I B 3.10-3 Pages TRM I B 3.10-4 and TRM I B 3.10-5 Effective Date 08/31/1998 03/22/2006 08/23/1999 Page TRM I B 3.10-6 03/27/2008 B 3.11 RADIOACTIVE EFFLUENTS BAS.ES Pages B 3.11-1throughB3.11-9 08/30/1998 Page TRM I B 3.11-10 02/01/1999 Pages TRM/B 3.11-11 and TRM/B 3.11-11a 0410712000 Pages TRM/B 3.11-12 and TRM/B 3.11-13 02/01/1999 Page TRM I B 3.11-14 12/03/2004 Page TRM I B 3.11-15 02/01/1999 PagesB 3.11-16 through B 3.11-19 08/30/1998 Page TRM I B 3.11-20 04/02/2002 Page TRM I B 3.11-20a 04/02/2002 Page TRM I B 3.11-21 05/13/2005 Pages TRM I B 3.11-22 and TRM I B 3.11-23 11/14/2006 Pages TRM I B 3.11-23a and TRM I B 3.11-23b 06/18/2013 Pages TRM I B 3.11-24 and TRM I B 3.11-24a 08/11/2016 Page TRM I B 3.11-25 01/21/2004 Pages B 3.11-26 and B 3.11-27 08/30/1998 Page TRM I B 3.11-28 11/30/2005 Page TRM I B 3.11-29 02/19/2015 Pages TRM I B 3.11-30 and TRM I B 3.11-31 05/29/2013 Page TRM I B 3.11-32 08/30/1998 Page TRM I B 3.11-33 06/30/2010 Pages B 3.11-34 and B 3.11-35 08/30/1998 Page TRM I B 3.11-36 02/12/1999 B.3.12 LOADS CONTROL PROGRAM BASES Page TRM I B 3.12-1 09/19/2007 Page TRM I B 3.12-2 11/29/2010 Page TRM I B 3.1.2-3 02/05/1999
- SUSQUEHANNA - UNIT 1 TRM I LOES-9 EFFECTIVE DATE 10/06/2016
TRM Post Accident Monitoring Instrumentation.
Rev. 10 3.3.4
- 3.3 3.3.4 TRO 3.3.4 Instrumentation TRM Post-Accident Monitoring Instrumentation The TRM post-accident monitoring instrumentation channels shown in Table 3.3.4-1 shall be OPERABLE. .
APPLICABILITY: According to Table 3.3.4-1 ACTIONS
N 0 TES-------------------------------------------------------------
- 1. Separate condition entry is allowed for each Function.
- 2. The provisions of TRO 3.0.6 are not applicable.
CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required A.1 Enter the Condition referenced Immediately channel inoperable. in Table 3.3.4-1 for the channel.
B. As required by Required B.1 Initiate the preplanned 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Action A.1 and referenced alternate method of monitoring in Table 3.3.4-1. the appropriate parameter(s).
AND B.2 Restore the required channel 7 days I 30 days (c) to OPERABLE status.
C. As required by Required C.1 Restore the required 30 days
- Action A.1 and referenced channel(s) to OPERABLE in Table 3.3.4-1
- status.
D. As required by Required D.1 Verify a minimum 14 of the Immediately Action A.1 and referenced in associated acoustic monitor Table 3.3.4-1 channels and 5 of the ADS AND SRV acoustic monitor channels are operable. Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter (cJ COMPLETION TIME for REQUIRED ACTION B.2 is extended from 7 to 30 days during construction activities associated with the replacement of SPING equipment with VERMS equipment.
- SUSQUEHANNA - UNIT 1 TRM I 3.3-9 EFFECTIVE DATE 10/07/2015
TRM Post Accident Monitoring Instrumentation Rev. 10 3.3.4
- ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME OR D.2 Verify SRV tailpipe Immediately temperature indication and alarm are available for the AND tailpipe associated with the inoperable acoustic monitor. Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter OR D.3 Verify that the following Immediately alternate monitoring methods in TS Table 3.3.3.1-1 are OPERABLE: AND a Function 1 AND
" Function 2
~
a Function 3 Function 10 Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter D.4 Restore the required 30 days channel(s) to OPERABLE status.
At next outage with containment entry, not to exceed the next refueling outage for in-accessible containment components .
- SUSQUEHANNA - UNIT 1 TRM I 3.3-9a EFFECTIVE DATE 06/30/2010
TRM Post Accident Monitoring Instrumentation Rev. 10 3.3.4 TECHNICAL REQUIREMENT SURVEILLANCE
NOTES ---------------------------------------------------------
- 1. Refer to Table 3.3.4-1 to determine which TRSs apply for each Post Accident Monitoring Function.
- 2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided an alternate means of monitoring the parameter or an associated function is available.
SURVEILLANCE FREQUENCY TRS 3.3.4.1 Perform CHANNEL CHECK 31 days TRS 3.3.4.2 Perform CHANNEL FUNCTIONAL TEST 92 days TRS 3.3.4.3 Perform a CHANNEL CALIBRATION. The Trip 24 months Setpoint shall be less than or equal to 0.25 of the full open noise level.
TRS 3.3.4.4 Perform CHANNEL CALIBRATION 24 months TRS 3.3.4.5 . Perform CHANNEL CALIBRATION of the 92 days Primary Containment H2 and 0 2 Analyzers.
SUSQUEHANNA - UNIT 1 TRM I 3.3-10 EFFECTIVE DATE 10/31/2007
TRM Post Accident Monitoring Instrumentation Rev. 10 3.3.4
- 2. Main Steam Safety/Relief Valve 1,2 1/valve D TRS 3.3.4.1 Position Indicator (Acoustic TRS 3.3.4.2 Monitor) TRS 3.3.4.3
- 3. Reactor Building Vent Noble Gas Monitor
- 4. Standby Gas Treatment System Vent Noble Gas Monitor
- 5. Turbine Building Vent Noble Gas Monitor
- .*.:... SUSQUEHANNA - UNIT 1 TRM I 3.3-11 EFFECTIVE DATE 10/07/2015
TRM Post Accident Monitoring Instrumentation Rev. 10 3.3.4
- TABLE 3.3.4-1 (continued)
TRM POST-ACCIDENT MONITORING INSTRUMENTATION APPLICABLE CONDITIONS MODES OR OTHER REFERENCED SPECIFIED REQUIRED FROM REQUIRED REQUIRED FUNCTION CONDITIONS CHANNELS ACTION A.1 SURVEILLANCE
- 6. Standby Gas Treatment System Vent Stack Sampling System Flow
- 7. Turbine Building Vent Stack Sampling System Flow
- 8. Containment H2 and 0 2 Analyzer(bJ 1,2 2 c TRS 3.3.4.1 TRS 3.3.4.5 (a) When moving irradiated fuel in the secondary containment.
(b) TRO 3.0.4.c is applicable .
- SUSQUEHANNA - UNIT 1 TRM / 3.3-11a EFFECTIVE DATE 10/06/2016
Radioactive Gaseous Effluent Monitoring Instrumentation Rev. 7 3.11.2.6
- 3.11 3.11.2 Radioactive Effluents Gaseous Effluents 3.11.2.6 Radioactive Gaseous Effluent Monitoring Instrumentation TRO 3.11.2.6 The radioactive gaseous effluent monitoring instrumentation channels shown in Table 3.11.2.6-1 shall be OPERABLE with their setpoints established in accordance with the ODCM to ensure that the limits of Requirement 3.11.2.1 are not exceeded.
APPLICABILITY: According to Table 3.11.2.6-1 ACTIONS
NOTE --------------------------------------------------------
- 1. Separate condition entry is allowed for each channel.
- 2. The provisions of TRO 3.0.6 are not applicable .
- A.
CONDITION Radioactive gaseous A.1 REQUIRED ACTION Suspend the release of COMPLETION TIME Immediately effluent monitoring radioactive gaseous effluents instrumentation channel
- monitored by the affected alarm/trip setpoint less channel conservative than required to ensure that the limits of OR Requirement 3.11.2.1 are not exceeded A.2 Declare the channel Immediately inoperable (continued)'
- SUSQUEHANNA - UNIT 1 TRM I 3.11-25 EFFECTIVE DATE 04/12/2007
Radioactive Gaseous Effluent Monitoring Instrumentation Rev. 7 3.11.2.6 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME B. Reactor Building B.1 Take grab samples Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> Ventilation System while release is Noble Gas Activity in progress.
Monitor low range AND channel inoperable B.2 Analyze grab samples for Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> isotopic activity to the required of grab sample LLDs for principal noble gas gamma emitters (Table 3.11.2.1-1)
AND B.3 Restore monitoring 30 days instrumentation C. Deleted D. Reactor Building D.1 Estimate flow rate Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> Ventilation Monitoring while release is System Effluent System in progress Flow Rate Monitor or AND Sampler Flow Rate Monitor inoperable D.2 Restore monitoring 30 days instrumentation (continued)
SUSQUEHANNA - UNIT 1 TRM I 3.11-26 EFFECTIVE DATE 01/21/2004
Radioactive Gaseous Effluent Monitoring Instrumentation Rev. 7 3.11.2.6
- ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME E. Turbine Building Ventilation E.1 Verify mechanical vacuum Immediately System Noble Gas Activity pump is not in operation Monitor low range channel inoperable AND E.2 Take grab samples Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> while release is in progress AND E.3 Analyze grab samples for Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after isotopic activity to the sample required LLDs for the principal noble gas gamma emitters (Table 3.11.2.1-1)_
AND E.4 Restore monitoring instrumentation 30 days F. Deleted G. Turbine Building Ventilation G. 1 Estimate flow rate Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> Monitoring System: while release is in Effluent Flow Rate Monitor progress.
or Sample (Bypass or Low AND Range) Flow Rate Monitor inoperable G.2 Restore monitoring 30 days instrumentation (continued)
- SUSQUEHANNA - UNIT 1 TRM I 3.11-27 EFFECTIVE DATE 08/11/2016
r Radioactive Gaseous Effluent Monitoring Instrumentation Rev. 7 3.11.2.6 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME H. Standby Gas Treatment H.1 Take grab samples Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> System Noble Gas Activity during operation of Monitor low range channel SGTS inoperable AND H.2 Analyze grab samples for Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> isotopic activity to the required of grab sample LLDs for principal noble gas being taken gamma emitters (Table 3.11.2.1-1)
AND H.3 Restore monitoring 30 days instrumentation I. Deleted J. SGTS Ventilation J.1 Estimate flow rate Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> Monitoring System:. during operation of Effluent flow rate monitor SGTS or sample (Bypass or Low AND Range) flow rate monitor inoperable J.2 Restore monitoring 30 days instrumentation (continued)
SUSQUEHANNA - UNIT 1 TRM I 3.11-28 EFFECTIVE DATE 10/06/2016
Radioactive Gaseous Effluent Monitoring Instrumentation Rev. 7 3.11.2.6
- ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME I<. Required Actions and K.1 Explain why this inoperability In the next Completion Times not met was not corrected in a timely Radioactive Effluent for Conditions B through J manner Release Report per TS Section 5.6 TECHNICAL REQUIREMENT SURVEILLANCE
NOTE --------------------------------------------------------
Refer to Table 3.11.2.6-1 to determine which TRSs apply for each Monitoring Function.
SURVEILLANCE FREQUENCY TRS 3.11.2.6.1 Perform CHANNEL CHECK 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> TRS 3.11.2.6.2 Deleted TRS 3.11.2.6.3 Perform Source Check 31 days TRS 3.11.2.6.4 Perform CHANNEL FUNCTIONAL TEST 92 days TRS 3.11.2.6.5 Perform CHANNEL CALIBRATION 24 months SUSQUEHANNA - UNIT 1 TRM I 3.11-29 EFFECTIVE DATE 12/03/2004
Radioactive Gaseous Effluent Monitoring Instrumentation Rev. 7 3.11.2.6
- TABLE 3.11.2.6-1 (Page 1 of 3)
RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION REQUIRED SURVEILLANCE FUNCTION APPLICABILITY CHANNELS REQUIREMENTS
- 1. REACTOR BUILDING VENTILATION MONITORING SYSTEM
- a. Noble Gas Activity Monitor At all Times 1 TRS 3.11.2.6.1 (Low Range) TRS 3.11.2.6.3 TRS 3.11.2.6.4 TRS 3.11.2.6.5
- b. Deleted C. Deleted
- d.
e.
Effluent System Flow Rate Monitor Sampler Flow Rate Monitor At all Times At all Times 1 TRS 3.11.2.6.1 TRS 3.11.2.6.4 TRS 3.11.2.6.5 TRS 3.11.2.6.1 TRS 3.11.2.6.4 TRS 3.11.2.6.5 (continued)
- SUSQUEHANNA - UNIT 1 TRM I 3.11-30 EFFECTIVE DATE 01/21/2004
Radioactive Gaseous Effluent Monitoring Instrumentation Rev. 7 3.11.2.6
- TABLE 3.11.2.6-1 (Page 2 of 3)
RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION REQUIRED SURVEILLANCE FUNCTION APPLICABILITY CHANNELS REQUIREMENTS
- 2. TURBINE BUILDING VENTILATION MONITORING SYSTEM
- a. Noble Gas Activity Monitor At all Times TRS 3.11.2.6.1 (Low Range) TRS 3.11.2.6.3 TRS 3.11.2.6.4 TRS 3.11.2.6.5
- b. Deleted
- c. Deleted
- f. Sample Flow Rate Monitor At all Times TRS 3.11.2.6.1 (Low Range) TRS 3.11.2.6.4 TRS 3.11.2.6.5 (continued)
- SUSQUEHANNA - UNIT 1 TRM I 3.11-31 EFFECTIVE DATE 08/11/2016
Radioactive Gaseous Effluent Monitoring Instrumentation Rev. 7 3.11.2.6
- TABLE 3.11.2.6-1(Page3 of 3)
RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION REQUIRED SURVEILLANCE FUNCTION APPLICABILITY CHANNELS REQUIREMENTS
- 3. STANDBY GAS TREATMENT SYSTEM (STGS) MONITOR
- a. Noble Gas Activity Monitor During TRS 3.11.2.6.1 (Low Range) operation of TRS 3.11.2.6.3 SGTS(a) TRS 3.11.2.6.4 TRS 3.11.2.6.5
- b. Deleted
- c. Deleted
- d.
e.
Effluent System Flow Rate Monitor Sample Flow Rate Monitor (Bypass)
During operation of SGTS(a)
During operation of TRS 3.11.2.6.1 TRS 3.11.2.6.4 TRS 3.11.2.6.5 TRS 3.11.2.6.1 TRS 3.11.2.6.4 SGTS(a) TRS 3.11.2.6.5
- f. Sample Flow Rate Monitor During operation TRS 3.11.2.6.1 (Low Range) of SGTS(a) TRS 3.11.2.6.4 TRS 3.11.2.6.5 (a) TRO 3.0.4.c is applicable .
- SUSQUEHANNA - UNIT 1 TRM I 3.11-32 EFFECTIVE DATE 10/06/2016