ML16294A373

From kanterella
Jump to navigation Jump to search
Forwards IE Bulletin 79-14,Revision 1, Seismic Analysis for As-Built Safety-Related Piping Sys
ML16294A373
Person / Time
Site: Oconee, Mcguire, McGuire  Duke Energy icon.png
Issue date: 07/18/1979
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
References
NUDOCS 7908130106
Download: ML16294A373 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION 10, REGIONI11 101 MARIETTA ST., N.W., SUITE 3100 ATLANTA, GEORGIA 30303 JUL 1 8 1979 In Reply Refer To:

RII:JPO 50-369, 50-370 50-469? 5 Duke Power Company Attn: W. 0. Parker, Jr.

Vice President, Steam Production P. 0. Box 33189 422 South Church Street Charlotte, North Carolina 28242 Gentlemen:

IE Bulletin 79-14 is revised to limit the scope of work required. The changes are indicated on the enclosed replacement page for the bulletin. If you desire additional information regarding this matter, please contact this office.

Sincerely, James P. O'Reilly Director

Enclosure:

Page 2 of 3 to IE Bulletin No. 79-14, Rev. 1 7908130106

SJUL18 1979 Duke Power Company

-2 cc w/encl:

M. D. McIntosh, Project Manager Post Office Box 488 Cornelius, North Carolina 28031 J. C. Rogers, Project Manager Post Office Box 33189 Charlotte, North Carolina 28242 J. E. Smith, Station Manager Post Office Box 1175 Seneca, South Carolina 29678