0e e

4.5 EMERGENCY CORE COOLING SYSTEMS AND REACTOR BUILDING COOLING SYSTEM PERIODIC TESTING 4.5.1 Emergency Core Cooling Systems Applicability Applies to periodic testing requirements for the Emergency Core Cooling Systems.

Objective To verify that the Emergency Core Cooling Systems are operable.

Specification 4.5.1.1 System Tests 4.5.1.1.1 High Pressure Injection System

a.

During each refueling outage, a system test shall be conducted to demonstrate that the system is operable. A test signal will be applied to demonstrate actuation of the High Pressure Injection System for emergency core cooling operation.

b.

The test will be considered satisfactory if control board indication verifies that all components have responded to the actuation signal properly; all appropriate pump breakers shall have opened or closed and all valves shall have completed their travel.

4.5.1.1.2 Low Pressure Injection System

a.

During each refueling outage, a system test shall be conducted to demonstrate that the system is operable. The test shall be performed in accordance with the procedure summarized below:

(1) A test signal will be applied to demonstrate actuation of the Low Pressure Injection System for emergency core cooling operation.

(2)

Verification of the engineered safety features function of the Low Pressure Service Water System which supplies cooling water to the low pressure coolers shall be made to demonstrate operability of the coolers.

b.

The test will be considered satisfactory if control board indication verifies that all components have responded to the actuation signal properly; all appropriate pump breakers shall have opened or closed, and all valves shall have completed their travel.

4.5.1.1.3 Core Flooding System

a.

During each refueling outage, a system test shall be conducted to demonstrate proper operation of the system. During pressurization of the Reactor Coolant 4.5-1 9403310233 940324 PDR ADOCK 05000269