ML16293A639
| ML16293A639 | |
| Person / Time | |
|---|---|
| Site: | Oconee, Mcguire, Catawba, McGuire |
| Issue date: | 08/15/1980 |
| From: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parker W DUKE POWER CO. |
| References | |
| NUDOCS 8009030175 | |
| Download: ML16293A639 (1) | |
Text
' 1105 UNITED STATES NUCLEAR REGULATORY COMMISSION
- REGION II 101 MARIETTA ST., N.W., SUITE 3100 ATLANTA, GEORGIA 30303 In Reply Refer To:
AUG 1 1980 RII:JPO 5
- '0-270 0-~B25 13 50-4 Duke Power Company ATTN:
W. 0. Parker, Jr.
Vice President, Steam Production P. 0. Box 2178 Charlotte, NC 28242 Gentlemen:
Enclosed is Revision 1 to IE Bulletin No. 80-19. The revision merely clarifies the areas of concern; therefore, the actions including dates of reports required by you with respect to your nuclear power facility is not changed.
In order to assist the NRC in evaluating the value/impact of each Bulletin on licensees, it would be helpful if you would provide an estimate of the manpower expended in conduct of the review and preparation of the report(s) required by the Bulletin.
Please estimate separately the manpower associated with corrective actions necessary following identification of problems through the Bulletin.
Should you have any questions regarding the revised Bulletin or actions required by you, please contact this office.
Sincerely, James P. O'Reilly Director
Enclosures:
- 1.
IE Bulletin No. 80-19, Revision 1
- 2.
List Recently Issued IE Bulletins cc w/encl:
M. D. McIntosh, Plant Manager J. C. Rogers, Project Manager J. E. Smith, Station Manager D. G. Beam, Project Manager J. W. Hampton, Station Manager