ML16256A674
| ML16256A674 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 09/28/1983 |
| From: | Dance H NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Tucker H DUKE POWER CO. |
| References | |
| NUDOCS 8310040425 | |
| Download: ML16256A674 (4) | |
Text
REGULATURYSFORMATION DISTRIBUTION S M (RIDS)
ACCESSION NBR:8310040425.
DOC.DATE: 83/09/28 NOTARIZED: NO DOCKET #
FACIL:50-269 Oconee Nuclear Station, Unit 1, Duke Power Cot 05000269 50-270 Oconee Nuclear Station, Unit 2, Duke Power Co, 05000270
.50-287 Oconee Nuclear Station, Unit 3, Duke.Power Co.
05000287 AUTH,NAME AUTHUR AFFILiATION
- DANCEHC, Division of Project & Resident Programs RECIP,NAME RECIPIENT AFFILIATION TUCKERHB Duke Power Co.
SUBJECT:
Notifies that operator & senior operator licensing exams scheduled for wk of 831205.NRC -requirements for administration of exams encl.
DISTRIBUTION CODE: M003S COPIES RECEIVED:LTR ENCL L SIZE:
TITLE: Operator Requalification Program NOTES:AEOD/Ornstein:lcy.
05000269 AEOD/Ornstein:icy, 05000270 AEOD/Ornstein:icy, 05000287 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL NRR ORB4 BC 1
1 SUERMANN,J 1
1 INTERNAL: NRR/DHFS/OLB 01 2
2 04 1
1 RGN2 I
1I EXTERNAL: ACRS 08 10 10 INP0,J.STARNES 1
1 LPDR 03 1
1 NRC PDR 02 1
1 NSIC 05 1
1 NTIS 1
1 NOTES:
1 1
TOTAL NUMBER OF COPIES REQUIRED: LTTR 22 ENCL 22
- FICIAL RECORD COPY September 28, 1983 Duke Power Company ATTN:
Mr. H. B. Tucker, Vice President Nuclear Production Department 422 South Church Street Charlotte, NC 28242 Gentlemen:
SUBJECT:
OPERATOR AND SENIOR OPERATOR LICENSING EXAMINATIONS In a telephone conversation between Mr. D. Tidwell, Associate Instructor, Oconee Station, and Mr. C. Hehl of our Operator Licensing Section, arrangements were made for the administration of the examinations at the Oconee Nuclear Station.
The written, simulator, and plant oral examinations are scheduled for the week of December 5, 1983.
In order for us to meet the above schedule, it will be necessary for the facility to furnish the approved reference material as agreed to between Mr.
Hehl and Mr. Tidwell by October 5, 1983. Any delay in receiving this material will result in a delay in administration of the examinations. Our examinations are scheduled far in advance with considerable planning to utilize our present limited examiner manpower and to meet the examination date requested by the various facilities.
Therefore, missing the October 5, 1983 deadline, even by a few days, will likely result in a long delay, since it would not be possible to reschedule examinations at other facilities.
Mr. Tidwell has been advised of our reference material requirements, the number of reference material sets that are required, and the examiner's names and addresses where each set is to be mailed.
The facility management is responsible for providing adequate space and facilities in order to properly conduct the written examinations.
The enclosure, "Administration and Operator Licensing Written Examinations",
describes our requirements for conducting these examinations.
Mr. Tidwell has also been informed of these requirements.
All operator and senior license applications should be submitted on Form NRC-398 at least 60 days prior to the first examination date so that we will be able to review the training and experience of the candidates, process the medical certifications, and prepare final examiner assignments after candidate eligibility has been determined.
This request for information was approved by OMB under clearance number 3150-0101 which expires June 30, 1986.
Comments on burden and duplication may be directed to the Office of Management and Budget, Reports Management Room 3208, New Executive Office Building, Washington, D.C. 20503.
9310040425 830928 PDR ADOCK 05000269 V
Duke Power Company 2
September 28, 1983 Thank you for your consideration in this matter.
If you have any questions regarding the examination procedures and requirements, please contact Mr. Bruce A. Wilson, 404/221-5542, or Mr. C. Hehl, 404/221-2831.
Sincerely, (Original signed by HCDance)
Hugh C. Dance, Chief Project Branch 2 Division of Project and Resident Programs
Enclosure:
"Administration of Operator Licensing Written Examinations" cc w/enclosure:
R. Bugert, Training Supervisor, Oconee J. Ed Smith, Plant Superintendent, Oconee bcc w/enclosure:
J. Bryant, Resident Inspector Document Management Branch ITT'R I-Y' RH RII sehl:es B lson j/ AFGib on HCDance 9/1?/83 9/;L7/83 W
19A)
/83 9/,,W83
ENCLOSURE ADMINISTRATION OF OPERATOR LICENSING WRITTEN EXAMINATIONS NRC Requirements:
- 1. A single room shall be provided for completing the written examination. The location of this room and supporting restroom facilities shall be such as to prevent contact with all other facility/contractor personnel during the duration of the written examination. If necessary, the facility should make arrangements for the use of a suitable room at a local school, mote.1, or other building. Obtaining this room is the responsibility of the Ticensee.
- 2. Minimum spacing is one candidate per 5 X 21 ft., minimum size table with 3 foot spacing between tables.
No wall charts, models, and/or other training materials shall be present in the examining room.
- 3. Suitable arrangements are to be made by the facility for the candidates to have lunch, coffee, etc. These arrangements will be reviewed by the examiner and/or proctor.
- 4. The facility shall arrange to have a maximum of three knowledgeable personnel available to review the examination questions and answer key. This review will only begin after the start of the written examination and normally be limited to two hours.
- 5. The facility will provide sealed pads of paper for each candidate's use in completing the examination. All reference material needed to complete the examination will be furnished by the examiner. Candidates can bring calculators or slide rules but no other equipment or reference material to the examination room.
- 6. Only black ink or dark pencil should be used for writing answers to questions.