Summary of 790719 Meeting W/Utils in Bethesda,Md to Discuss Outstanding Items from NRC Orders & IE Bulletins Generic to All B&W Facilities
ML16245A426
Person / Time
Site: Davis Besse, Oconee, Arkansas Nuclear, Crystal River, Rancho Seco  
Issue date: 07/31/1979
From: Capra R
NRC - TMI-2 BULLETINS & ORDERS TASK FORCE
To: Brandimore S, Kaplan D, Porter W
DUKE POWER CO., FLORIDA POWER CORP., SACRAMENTO MUNICIPAL UTILITY DISTRICT
References
NUDOCS 7908300599
Download: ML16245A426 (54)


Text

CN-.

JUL 3 1 1979 Docket Nos.:

270, 281, 50-302, 312, 313, 346 FACILITIES:

Oconee Nuclear Station, Units No. 1, 2, and 3 Crystal River Unit-No. 3, Nuclear Generating Station Rancho Seco Nuclear-Generating Station Arkansas Nuclear One, Unit No. 1' Davis-Besse Nuclear Power Station, Unit No. 1 LICENSEES:

Duke Power Company Florida Power Corporation Sacramento Municipal Utility District Arkansas Power & Light Company Toledo Edison Company

SUBJECT:

SUMMARY

OF MEETING HELD ON JULY 19,1979, TO DISCUSS OUTSTANDING ITEMS FROM COMMISSION ORDERS AND IE BULLETINS GENERIC TO ALL BABCOCK & WILCOX (B&W)

OPERATING PLANTS On July 19, 1979, members of the NRC staff were invited to attend a meeting'of the B&W Owners' Group (TMI-2 Follow-up Subcommittee) in Bethesda, Maryland to discuss outstanding items related to the Commission's confirmatory shutdown Orders issued for each B&W operating plant and Bulletins issued by the NRC's-Office of Inspection and Enforcement (IE). 'In addition to representatives from the"NRC staff and the' licensees listed above,-representatives from B&W also participated in the meeting.

A list of attendees is provided as Enclosure 1 to this summary.

Rackground In light of the Three Mile Island Unit 2 accident, the Commission confirmed by Orders, issued to each holder of an operating-license.for facilities using a B&W designed reactor, that each licensee would undertake a series of actions, both immediate and long-term, to increase the capability and reliability of the plant to respond to Various transient events.- In addition, each Order confirmed that the facility would shut down or remain shut down and not be restarted until the imediate-actions specified in the Order were accomplished and found acceptable by the Director,,Office of Nuclear Reactor Regulation. These immediate actions were completed by each licensee, reviewed by theNRC staff and found acceptable.

However, in each-staff Safety Evaluation of the licensee's compliance.withihe Commission Order, certain issues were found to require more detailed and long-term study prior to their final resolution.

Several of these issues are, applicable generically to all of the B&W operating plants.

In addition to the Commission Orders, a series of IE Bulletins were is~e9

(%GS 79-lAwad 79-05)

Lu

,aho a

O pea

,pat also aereofactions to. bc taken bytelcen sees.

A.tions takenty al o a q b sd.... ~ i~

..... t. n.s......

y....h. J.i....s........

a...I..I....;..................

the l-icersis,, as a resul : of-these Bulletins, are piesently underligrve

  • e eric l yll-s-a-by fIIAt 61aff;"~rr.

t1 r~pc rr Mj a5 rlpc

--a~&

to all

.&.. p. t.i..p. l t A...............................

1WC 1GUM 31 (9.76)

Niat 0240 U.S. GV RNM NT PRINTING O iCeS: 1978 -

Ss - 76

JUL 3 1 1979 Meeting Summary

-3 Branch Technical Position ASB 10-1 were also used in the evaluation. It was pointed out that the objective of the short-term recommendations is to supplement. IE Bulletin requirements.for the Westinghouse and Combustion Engineering plants to quickly improve thh AFW system performance and relia bility and the objective of the long-term recommendations is to end up with an AFW system-that is adequate and answers all relevant TMI-2 concerns. The draft short-.and long-term recommendations of this study were discussed with the Owners' Group. The 'staff evaluation of the Westinghouse and Combustion Engineering plants will be available as a NUREG document by the end of August 1979.

It was suggested.by the NRC staff and agreed to by the Owners' Group that they would perform a reliability study.on their plants, using the same methodology as the staff used for the Westinghouse and Combustion Engineering plants.

The Owners' Group committed to meeting with the staff in mid-August to outline their plan for performing this study.

The study would serve as a basis for continued design modifications and/or improvements to pgr'ade the performance and reliability of the AFW system.

The staff closed the meeting with a review of the status of the following' topics:

(1) IE Bulletin Review Draft Safety Evaluations have been prepared for responses t6 Bulletins 79-05 and 79-05A. Responses to Bulletin 79-05B are being reviewed, and incorporated into these Safety Evaluations. A request for addi tional information will be sent to each licensee, where required, to resolve any open items. Issuance of the Safety Evaluations should take place in September 1979.

(2)-

Technical Specification Change Requests As a result of actions taken to comply with the Commission's.Orders and IE Bulletins, each licensee has filed requests for changes to its facilities' Technical Specifications. 'These requests are being.reviewed by the staff and should-result in license amendments being issued to the utilities in late August or early September 1979.

(3) Long-Term Actions Required by Commission Orders As part of the requirements for lifting the Commission Order, each utility was directed to provide,a schedule, within 30 days of the Order being lifted, which provides. its schedule for the completion of the long-term requirements of the Order. The staff is presently.reviewing the adequacy of the long-term schedules. 'If the schedules need to be modified, the staff will deal directly with the licensees.

(4) Implementation of Short-Term Recommendations of the TMI-2 Lessons Learned Task Force A meeting will be held on August 1, 1979, in Bethesda, Maryland to discuss this topic. Additional meeting information, such as time, place and npnda will h forthrong C.

.I.A3 8 ( 7 ).NACM.0240..

o.........

D U R A 0.

PMC FK 31 (9 76 NRCK0240U.S

£ GVERNMENftr PRINTNG OFFICUE t974 263 749

Meeting, Sumary J U L 3 1 1979 Conclusion The following is a summary of commitments made at the meeting:

Staff (1

-Provide requests for additional information on IE Bulletins responses by August 1979.

(2) Provide license amendments for Technical Specification changes by late Auglust 1979.

(3) Provide further. iriformation on the implementation ofthe short-term recommendations of the-TMI-2 Lessons Learned Task Force at the August 1, 1979 meeting.

Owners' Group (1)

Advise the staff by letter of the procedures it intends to follow for interacting and.corresponding with the staff.

(2) Meet with the staff in mid-August to outline its plan for performing the AFW system reliability study.

(3) Meet with the staff at a future date to discuss additiohal analyses needed in theareas of inadequate core cooling and evaluation of accidents and transients beyond current design analyses.

riginal signed byl R. A. Capra,, B&W Project Manager Bulletins- & Orders Task Force Office of.Nuclear Reactor Regulation Distribution:

Service Lists See attached pages 27745 ~~ B& /F

[j*

SUR 4A 1 I= F 197/31/79 1

34BC 1 M 318

(.76)

NRM 024gu

e. envRnaMeNT PnINTING owWIcus sa

-esI s

E. Case R. Mattson D. Eisenhut D. Ross D. Vassallo C. Heltemes T. Novak Z. Rosztoczy S. Israel P. Matthews G. Mazetis P. Norian N. Wagner K. Mahan J. Lee W Gammill

  • B.

Grimes R. Reid Project Manager, DOR R. A. Capra NRC PDR Docket Files (7)

ACRS (16)

Local POR (3)

NCRee 1 Attendees SB Chron File

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 JUL 3 11979 Docket Nos.:

50-269, 270, 287, 50-302, 312, 313, 346 FACILITIES:

Oconee Nuclear Station, Units No. 1, 2, and 3 Crystal River Unit No. 3, Nuclear Generating Station Rancho Seco Nuclear Generating Station Arkansas Nuclear One, Unit No. 1 Davis-Besse Nuclear Power Station, Unit No. 1 LICENSEES:

Duke Power Company Florida Power Corporation Sacramento Municipal Utility District Arkansas Power & Light Company Toledo Edison Company

SUBJECT:

SUMMARY

OF MEETING HELD ON JULY 19, 1979, TO DISCUSS OUTSTANDING ITEMS FROM COMMISSION ORDERS AND IE BULLETINS GENERIC TO ALL BABCOCK & WILCOX (B&W) OPERATING PLANTS On July 19, 1979, members of the NRC staff were invited to attend a meeting of the B&W:Owners' Group (TMI-2 Follow-up Subcommittee) in Bethesda, Maryland to discuss outstanding items related to the Commission's confirmatory shutdown Orders issued for each B&W operating plant and Bulletins issued by the NRC's Office of Inspection and Enforcement (IE).

In addition to representatives from the NRC staff and the licensees listed above, representatives from B&W also participated in the meeting.

A list of attendees is provided as Enclosure 1 to this summary.

Background

In light of the Three Mile Island Unit 2 accident, the Commission confirmed by Orders, issued to each holder of an operating license for facilities using a B&W designed reactor, that each licensee would undertake a series of actions, both immediate and long-term, to increase the capability and reliability of the plant to-respond to various transient events. In addition, each Order confirmed that the facility would shut down or remain shut down and not be restarted until the immediate actions specified in the Order were accomplished and found acceptable by. the Director, Office of Nuclear Reactor Regulation. These immediate actions were completed by each licensee, reviewed by the NRC staff and found acceptable.

However,, in each staff Safety Evaluation of the licensee's compliance with the Commission Order, certain issues were found to require more detailed and long-term study prior to their final resolution. Several of these issues are applicable generically to all of the B&W operating plants.

In addition to the Commission Orders, a series of IE Bulletins were issued (79-05,79-05A and 79-05B) to each of the B&W operating plants. These Bulletins also required a series of actions to be taken by the licensees. Actions taken by the licensees, as a result of these Bulletins, are presently undergoing review by the NRC staff. Many of these specific actions are also applicable generically to all of the B&W operating plants.

Meeting Summary JUL J 1 979 The majorpurpose of the meeting was to discuss these generic issues with theB&W'Owners' Group to determine the feasibility of resolving some of these issues through the Owners' Group instead of through separate interaction with each licensee.

Discussion The NRC staff explained the respective roles of the special task forces which have been organized within the Office of Nuclear Reactor Regulation, subse quent to the TMI-2 accident. A detailed explanation of the Bulletins & Orders (B&O) Task Force was then presented. This included a breakdown of the work scope, interfacing organizations, organization within the Task Force, schedule of B&O activities with respect to the B&W facilities, and a review of the items considered by the staff as outstanding B&W generic issues. A copy of each of the viewgraphs presented by the staff is provided in Enclosure 2 to this summary.

Mr. David Holt (Duke Power Company), Chairman of the Subcommittee, then presented an overview of the membership, scope, objectives and organization of the B&W Owners' Group. Mr. Holt pointed out that the Owners' Group does not constitute a legal entity and'assumes no financial or legal responsibility for its members or.member companies. As such, all contractual matters and program funding are controlled by each member in accordance with individual contracts with B&W or other suppliers of services to the Owners:' Group.

The Qwners' Group cannot make any legal or commercial commitments for individual members.

As a result of this understanding, it was agreed between the Owners' Group and the staff that the Group could still be useful by providing a forum for joint discussions of generic issues and establishing unified positions during interactions with B&W and/or the NRC. However, correspondence requiring the expenditure of funds would not be addressed to the Owners' Group, but would be sent to each of the member licensees. A copy of the Owners' Group organization and charter is provided as Enclosure 3 to this summary.

The NRC staff then presented a detailed discussion of auxiliary feedwater system (AFW) reliability and performance. Upgrading the performance and reliability of the AFW system was required as an immediate action on all of the Commission's Orders issued to the B&W plants. It was pointed out that additional review and modifications would be required in this area in the future. The staff discussed its detailed review of the AFW systems installed in all of-the plants with Westinghouse and Combustion Engineering designed reactors. This review included obtaining a response to a staff questionnaire, and meeting with each licensee to review the "as built" design and operation of each AFW system. The information obtained for each plant was evaluated by

  • a systems engineer and a systems reliability engineer, with emphasis given to improving AFW system performance and reliability, including the identification of dominant failure modes and giving consideration to the potential for the human operators to affect the AFW system performance and reliability. The criteria' of the current issue of Standard Review Plan Section 10.4.9 and

JUL 3 1 979 Meeting Summary

-3 Branch Technical Position ASB 10-1 were also used in the evaluation.

It was pointed out that the objective of the short-term recommendations is to supplement IE Bulletin requirements for the Westinghouse and Combustion Engineering plants to quickly improve the AFW system performance and relia bility and the objective of the long-term recommendations is to end up with an AFW system that is adequate and answers all relevant TMI-2 concerns. The draft short-and long-term recommendations of this study were discussed with the Owners' Group. The staff evaluation of the Westinghouse and Combustion Engineering plants will be available as a NUREG document by the end of August 1979. It was suggested by the NRC staff and agreed to by the Owners' Group that they would perform a reliability study on their plants, using the same methodology as the staff used for the Westinghouse and Combustion Engineering plants. The Owners' Group committed to meeting with the staff in mid-August to outline their plan for performing this study. The study would serve as a basis for continued design modifications and/or improvements to upgrade the performance and reliability of the AFW system.

The staff closed the meeting with a review of the status of the following topics:

(1) IE Bulletin Review Draft Safety Evaluations have been prepared for responses to Bulletins 79-05. and 79-05A. Responses to Bulletin 79-05B are being reviewed and incorporated into these Safety Evaluations. A request for addi tional information will be sent to each licensee, where required, to, resolve any open items.

Issuance of the Safety Evaluations should take place in September 1979.

(2) Technical Specification Change Requests As a result of actions taken to comply with the Commission's Orders andIE Bulletins, each licensee has filed requests for changes to its facilities' Technical Specifications. These requests are being reviewed by the staff and should result in license amendments being issued to the utilities in late August or early September 1979.

.(3)

Long-Term Actions Required by Commission Orders As part of the requirements for lifting the Commission Order, each utility was directed to provide a schedule, within 30 days of the Order being lifted, which provides its schedule for the completion of the long-term requirements of the Order. The staff is presently reviewing the adequacy of the long-term schedules. If the schedules need to be modified, the staff will deal directly with the licensees.

(4) 'Implementation of Short-Term Recommendations of the TMI-2 Lessons Learned Task Force A meeting will be held on August 1, 1979, in Bethesda, Maryland to discuss this topic. Additional meeting information, such as time, place and agenda will be forthcoming.

Meeting Summary JUL 3 1 1979 Conclusion The following is a summary of commitments made at the meeting:

Staff (1) Provide requests for additional information on IE Bulletins responses by August 1979.

(2) Provide license amendments for Technical Specification changes by late August 1979.

(3) Provide further information on the implementation of the short-term recommendations of the TMI-2 Lessons Learned Task Force at the August 1, 1979 meeting.

Owners' Group (1) Advise the staff by letter of the procedures it intends to follow for interacting and corresponding with the staff.

(2) Meet with the staff in mid-August to outline its plan for performing the AFW system reliability study.

(3) Meet with the staff at a future date to discuss additional analyses needed in the areas of inadequate core cooling and evaluation of accidents and transients beyond current design analyses.

R. A. Ca ra, B&W Project Manager Bulletins & Orders Task Force Office of Nuclear Reactor Regulation

ENCLOSURE 1 LIST OF ATTENDEES Duke Power Company D. Holt R. Gill Florida Power Corporation P. Baynard Sacramento Municipal Utility District S. Anderson Arkansas Power & Light Company D. Mardis D. Williams Toledo Edison Company C. Domeck E. Novak Babcock & Wilcox E. Kane R. Ham NRC T. Novak (B&O Task Force)

P. Matthews (B&O Task Force)

M. Taylor (Probabilistic Analysis Branch)

R. Reid (Operating Reactors)

D. Garner (Operating Reactors)

R. Capra (B&O Task Force)

  • CLOSURE 2

NRR SPECIAL TASK FORCES TMI-2SUPPORT R. VOLLMER BULLETINS & ORDERS D. ROSS LESSONS LEARNED R. MATTSON UNRESOLVED SAFETY ISSUES S. HANAUER NRC/TMI INVESTIGATION GROUP

  • CLOSURE 2

Page 2

BULLETINS & ORDERS TASK FORCE WORK SCOPE

1. SAFETY EVALUATION - CONFORMANCE WITH COMMISSION'S ORDERS
2. SAFETY EVALUATION -

IE BULLETINS 79-05,79-05A, & 79-05B

3. CONDUCT GENERIC REVIEWS OF OPERATING PLANTS
4. APPLY "LESSONS LEARNED" RECOMMENDATIONS TO OPERATING PLANTS INTERFACING ORGANIZATIONS DIVISION OF OPERATING REACTORS DIVISION OF SYSTEMS SAFETY LESSONS LEARNED TASK FORCE INSPECTION & ENFORCEMENT (IE)

ACRS B&W UTILITIES -

DUKE, SMUD, AP&L, TECO, FPC, MET ED B&W OWNERS GROUP

BULLETINS & ORDERS TASK FORCE D.F. ROSS, JR., DIRECTOR T.H. NOVAK, DEPUTY DIRECTOR PROJECT MANAGEMENT SYSTEMS GROUP ANALYSIS GROUP GROUP LEADER GROUP LEADER GROUP LEADER J. HELTEMES S. ISRAEL Z. ROSZTOCZY B&W TEAM LEADER TEAM LEADER R. CAPRA G. MAZETIS P. MATTHEWS GE REACTOR SYSTEMS AUXILIARY SYSTEMS CE POWER SYSTEMS OPERATING LICENSE W

CONTAINMENT SYSTEMS INST. & CONT. SYSTEMS-

SCHEDULE OF B&O ACTIVITIES FOR B&W ACTIVITY ORDER REVIEW ISSUE COMMISSION ORDERS 5/7/79 THROUGH 5/17/79 ISSUE SAFETY EVALUATION ON COMPLIANCE (LIFT ORDER) 5/18/79 THROUGH 7/6/79 RECEIVE LONG TERM SCHEDULE 6/18/79 THROUGH 8/6/79 RECEIVE TECH. SPEC.

5/25/79 THROUGH 7/13/79 REVIEW TECH. SPEC./ISSUE LICENSE AMENDMENTS 8/79 C,

REVIEW LONG TERM SCHEDULE /ISSUE SAFETY EVALUATION ONGOING m

BULLETIN REVIEW ISSUE BULLETINS (79-05,79-05A, & 79-05B) 4/79 REVIEW RESPONSES / DRAFT SAFETY EVALUATIONS 7/79 ISSUE REQUEST FOR ADDITIONAL INFORMATION 7/79 ISSUE SAFETY EVALUATIONS 8/79 GENERIC REVIEW NUREG 0560 -

FEEDWATER TRANSIENTS 5/79 NUREG 0565 SMALL BREAK LOCA 8/79 DEGRADED CORE COOLING 12/79 EVALUATION OF ACCIDENTS & TRANSIENTS BEYOND CURRENT DESIGN 12/79

[TMI -2 ACCIDENT

[ UTILITYVENDOR B s MEI -

MEETINGS ISSUED MEETINGS ORDERS ISSUED IEB

RESPONSE

B&O EVALUATION B&0 EVAL.

ISSUE SERs ISSUE ER i

LICENSE AMEND LONG TERM ACTIONS m

4GENERIC STUDIES D

TECH SPEC CHANGES B&W OWNERS LESSN SLEARNTD GROUP LESSONS LEARNED ADDITIONAL INSTRUCTIONS TO UTILITIES ISSUE SERs &

LICENSE AMEND.

ENCLOSURE 2 (Page 6)

B&W GENERIC ITEMS LONG-TERM ITEMS REQUIRED BY COMMISSION ORDER

1. FAILURE MODE AND EFFECTS ANALYSIS FOR THE ICS
2. UPGRADE ANTICIPATORY TRIP TO SAFETY-GRADE
3. OPERATOR TRAINING AND DRILLING -

HIGH STATE OF PREPAREDNESS LONG-TERM ITEMS RESULTING FROM STAFF SE AND OTHER GENERIC STUDIES

1. ANALYSES:

LOFW AND OTHER ANOMALOUS TRANSIENTS SMALL BREAK LOCA LIFT FREQUENCY AND MECHANICAL RELIABILITY OF PORV AND SAFETY VALVES

2. PRESSURE VESSFL INTEGRITY:

P-T CURVE FOR ACCIDENT CONDITIONS THERMAL-MACHANICAL REPORT ON BEHAVIOR OF VESSEL MATERIALS 3,

AFW/EFW:

UPGRADE RELIABILITY SHORT-TERM RECOMMENDATIONS OF LESSONS LEARNED TASK FORCE

1. EMERG. PWR. FOR PZR HEATERS & LVL INDICATION AND PORV & BLOCK VALVE
2. PERFORMANCE TESTING OF PORV AND SAFETY VALVES
3. DIRECT INDICATION FOR PORV
4. INSTRUMENTATION FOR INADEQUATE CORE COOLING
5. CONTAINMENT ISOLATION DIVERSITY
6. SHIFT SUPERVISOR RESPONSIBILITIES
7. SHIFT TURNOVER
8. ACCESS CONTROL FOR CONTROL ROOM

NCLOSURE 2 (Page 7)

SHORT TERM RECOMMENDATIONS OF THE TMI-2 LESSONS LEARNED TASK FORCE -

NUREG 0578 IMPLEMENTATION BY B&O TASK FORCE.

1. EMERG. PWR. FOR PZR HEATERS & LVL. IND. AND PORV (AND BLOCK VALVE)
2. PERFORMANCE TESTING OF PORV AND SAFETY VALVES
3. DIRECT INDICATION FOR PORV
4. INSTRUMENTATION FOR INADEQUATE CORE COOLING
5. CONTAINMENT ISOLATION DIVERSITY
6. AUTO-INITIATE AFW
7. AFW FLOW INDICATION
8. ANALYSIS OF DESIGN AND OFF-NORMAL TRANSIENTS AND ACCIDENTS
9. SHIFT SUPERVISOR RESPONSIBILITIES
10. SHIFT TURNOVER
11. ACCESS CONTROL FOR CONTROL ROOM IMPLEMENTATION BY OTHERS 1.

RECOMBINER PENETRATION

2. RECOMBINER INSTALLATION
3. INTEGRITY OF SYSTEMS OUTSIDE CONTAINMENT
4. SHIELDING FOR POST ACCIDENT OPERATIONS
5. POST ACCIDENT SAMPLING
6. INCREASED RANGE ON RADIATION MONITORS
7. IODINE INSTRUMENTATION
8. SHIFT SAFETY ENGINEER
9. ONSITE TECH. SUPPORT CENTER
10. ONSITE OPERATIONAL CENTER 11. REVISED LCOs BASED UPON SAFETY SYSTEM AVAILABILITY OVERLAPS WITH ORDERS OR STAFF SAFETY EVALUATIONS

B&W 177 FA OWNERS' GROUP SO s0 a ISI Executive 4

Users' I

Committee I

Committee Group I

L co- --t-e L-Asymmetric Environmental OTSG Tube THI-2 RV Reactor ATWS LOCA Qualification Failure Follow-up Materials Core Subcommittee M

Loads of Electrical Subcommittee Subcommittee Subcommittee Subcommittee C

Subcommittee Components I

Subcommittee Shoos 1S Teco

NCLOSURE 30Pge2 B&Wv 177 FA OMR1'S GROUP iiJGINLZRIIIG AiID LICE ME G Approved by Execut-ve Ccnittee June 2, 1977

ENCLOSURE 3 (Page

3)

B&W 177 FA OWiER'S CROUP Engineering & Licensinr Charter

1. Membership Membership in the B&W 177 FA Owner's Group - Engineering and Licensing (Cwncr's Group) shall be limited to represei.tatives of utility companies
  • or their service organizations who are currently either designing, con structing or operating generating plants utilizing a Babcock & Wilcox 177 FA nuclear steam supply system. A member can participate in any one, or all, of the active issues of the Owner's Group. Attachment 1 identi fies current participating utilities and their representatives.
2.

ScoDe Owner's Group activities shall be directed to engineering and licensing issues related to B&W 177 fuel assembly plants. Problems related to plant operation generally fall within the domain of the LI&W Plant Super intendent User's Group and are not specifically addressed by this Group, however, the Chairman of the Executive Comittee should establish con munication with the Superintendent's Group on matters that are of inter est to both groups. The Owner's Group does not constitute a legal entity, and assumes no financial or legal responsibility for its members or memoer companies.

3.

Objectives The objectives of the Owner's Group are:

a. To provide a forum for joint discussions and/or resolution of generic issues through effective communication between members, and between the Owner's Group and other organizations.
b. To provide mechanisms for establishing unified positions during inter actions with 8&W and/or the iHRC on generic issues.
c..To provide a method for controlling costs and schedules relative' to the resolution of generic issues.
d.

To improve communications between members on nongeneric issues.

Organization The Owner's Group is governed by an Executive Committee consisting of one member from each participating utility company or their designated service organization.

2

.*NCLOSURE 3 (Page 4)

Responsibilities and duties of the.Executive Committee include:

a. Establish policy for the Owner's Group.
b.

Select a Chairman and Secretary to serve a term of one calendar year.

c.. Meet as often as deemed appropriate by the Chairman, but no less than tvice a year.

d.

Establish non-standing technical committees for specified purposes.

e.

Each member of the Executive.Committee or his designee shall have one vote regarding recommended actions on a specific item.

A majority of those members active on a given issue must agree to an action before it is undertaken by the Owner's Group. Dissenting members are encour aged to participate ith the majority; however, they shall not be committed to do so and may act individually on their own behalf.

As appropriate, all members who choose to participate on a specific issue may be requested to submit letter3 to the Executive Committee Chairman indicating that they will support noncommercial decisions made by the Owner's Group as necessary to resolve the issue.

Responsibilities and duties of the technical committees include:

a. Technical committees shall have at least one Executive Committee member at all times.
b. Technical committee voting membership may include Non-Owner's Group members, consultants, B&W representatives and others agreed upon by the Executive Committee.
c. Technical committees will be dissolved upon completion of their assign ment and will report progress of their activities to the Executive Committee Chairman as requested and shall submit a final report summariz ing their accomplishments..
d.

Technical committees may develop mutually beneficial contracts with consultants, vendors, and other agencies to resolve a mutual problem.

These contracts will in no way financially commit the Owner's Group, as a entity, but may commit individual members through indivilual contracts.

c.

Technical committees shall appoint a Chairman and/or Secretary to organize their activities and maintain records for the committee.

4inutes of Technical Committee meetings shall be prepared and transmitted to Tech nical and Executive.Committee members.

Duties of the Executive Committee Chairman include:

a.. Chairing all Executive Committee meetings.

0,ENCLOSURE 3 (Page 5)

b. Establizhing agendas, dates and locations for all Executive Com mittee meetines.

C. Acting as the Owner's Group spokesman during meetings with, other organizations. He may appoint an alternate to act in his absencc.

Dtties of the Executive Secretary include:

a. Preparation of minutes for all Executive Comnittee meetings.

Minutes shall be prepared and transmitted to all members within two weeks of each mceting.

b. Chairing Executive Committee meetings in the absence of the Chair man.
5.

Program Funding Al contractual matters and program funding shall be controlled by each.

member in accordance with indvidual cnrcswt lW or other sU0_

Plirs f srviesto he wne'sGrou., The Owner's Group shall not Make anly legal, or commerciaj. commitments for individual members.

6.

Meeting Expenses All. attend-Ing mem,.bers shall be r

po sbe or h i on e p ne, and ob~e responsiblat forhei chown es un a prorated portion of common expenses relative to each Owner's GrouD meeting.

  • . Charter A croval and Amendment This Charter shallobe approved, and can be amended, by a majority vote of the Executive Committee.

BABCOCK & WILCOX OWNERS GROUP UTILITIES (OPERATING REACTORS)

Mr. William 0.

Parker, Jr.

Vice President-Steam Production Duke Power Company P.O. Box 2178 422 South Church Street Charlotte, North Carolinia 28242 Mr. William Cavanaugh, III Vice President, Generation and Construction Arkansas Power & Light Company P.O. Box 551 Little Rock, Arkansas 72203 Mr. J.. J. Mattimoe Assistant General Manager and Chief Engineer Sacramento Municipal Utility District 6201 S Street P.O. Box 15830 Sacramento, California 95813 Mr. Lowell: E. Roe Vice President, Facilities Development Toledo Edison Company Edison Plaza 300 Madison Avenue Toledo, Ohio 43652 Mr. W. P. Stewart Manager, Nuclear Operations Florida Power Corporation P.O. Box 14042 Mail Stop C-4 St. Petersburg, Florida 33733 Mr. J. G. Herbein Vice President-Generation Metropolitan Edison Company Post Office Box 542 Reading, PA. 19640

Duke Power Company cc w/enclosure(s):

Mr.. William L. Porter DukePowe ComanyMr.

Robert B. Borsun Duke Power Companyilcox Post Office Box 2178 N

c1 422 South Church Street Nuclear Power Generation Divisi on Suite 420, 7735 Old Georcgetown Road Charlotte, North Carolina 28242 BehsaLarln 01 Bethesda, Maryland 20014 J. Michael McCarry, III, Esquire Manager LIS DeBevoise & Liberrian 700 Shoreham Building NUS Corporation 2536 Countryside Boulevard 806 15th Street, N.W.

Washington, D. C. 20005 earwater, Florida 33515 Oconee Public Library cc w/enclosure(s) and incoming 2Q1 South Spring Street Walhalla, South Carolina 29691 Office of I ceoIntergovernnental Relations 116 West Jones Street Honorable James. Phinney Rtr County Supervisor of Oconee County Raleigh, North Carolina 27603 Walhalla, South Carolina 29621 Director, Technical Assessment DiVision Office of Radiation Programs (AW-459)

U. S. Environmental Protection Agency Crystal Mall #2 Arlington, Virginia 20460 U. S. Environmental Protection Agerfcy Region IV Office ATTN:

EIS COORDINATOR 345 Courtland Street, N.E.

Atlanta, Georgia 30308 U. S. Nuclear Regulatory Commission Region II Office of Inspection and Enforcement ATTN:

Mr. Francis Jape P. !. Box 85 Seneca, South Carolina 29678

Arkansas Power & Light Company cc.w/enclosure(s):

Phillip K. Lyon, Esq.

Director, Technical Assessment House, Holms & Jewell Division 1550 Tower Building Office of Radiation Programs Little Rock, Arkansas 72201 (AW-459)

U. S. Environmental Protection Agency Mr. David C. Trimble Crystal Mall #2 Manager, Licensing Arlington, Virginia 20460 Arkansas Power & Light Company P. 0. Box 551 U. S. Environmental Protection Agenc, Little Rock, Arkansas 72203 Region VI Office ATTN:

EIS COORDINATOR Mr. James P. O'Hanlon 1201 Elm Street General Manager First International Building Arkansas Nuclear One Dallas, Texas 75270 P. 0. Box 608 Russellville, Arkansas 72801 cc w/enclosure(s) and incoming dtd.:

Mr. William Johnson Director, Bureau of Environmental U.,S-. Nuclear Regulatory Commission Health Services P. 0. Box 2090 4815 West Markham Street Russellville, Arkansas 72801 Little Rock, Arkansas 72201 Mr. Robert B. Borsum Babcock & Wilcox Nuclear Power Generation Division Suite 420, 7735 Old Georgetown Road Bethesda, Maryland 20014 Troy B. Conner, Jr.,

Esq.

Conner, Moore & Corber 1747 Pennsylvania Avenue, N.W.

Washington, D.C.

20006 Arkansas Polytechnic College Russellville, Arkansas 72801 Honorable Ermil Grant Acting County Judge of Pope County Pope County Courthouse Russellville, Arkansas 72801

NM

[i chael L. uias Lsq.

-Sacramento Munic pa ty 1150 17th Stree ON. W.

District Washington, D. C. 20036 Dr. Richard F. Cole Atomic Safety and Licensing Board Panel cc w/enclos.ure(s):

U. S. Nuclear Reculatory Com.'mission David S. Kaplan, Secretary and Washington, 0. C. 20555 General Counsel 6201 S Street Mr. Frederick J. Shon P.0. Box 15830

.Atomic Safety and Licensing Board Panel Sacramento, California 95813 U. S. Nuclear Regulatory Co missio Washington, D. C. 20555 Sacramento'County Board of Supervisors Timothy V..A. Dillon, Esq.

827 7th Street, Room 424 Suite 380 Sacramento' California 95814 1850 K Street, N. W.

Washington, 0. C. 20006 California Energy Commission ATTN:

Librarian Mr. Mark Vandervelden 1111 Howe AvenueM Sacramento, California 95825 Ms.

Re is Mr. Robert Christopherson Friends of the Earth Business and Municipal Department California Lecislative Office Sacramento City-County Library 717 K Street, 208 828 1 Street SacrSment CSacramento, California 95814 Sacramento, California 95814 D irector, Technical Assessmnt Atomic Safety andLicensing Board Panel Direton U. S..Nuclear Regulatory Commission Diisan-'

Washington., D. C. 20555 Office of Radiation Programs (AW-459)

Atomic Safety and Licensing Appeal U. S. Environmental Protection Agency Board Panel Crystal all #2 U. S. Nuclear Regulatory Conission Arlington, Virginia 20460 Washington, 0. C. 2055 U. S. Environmental Protection Agency Mr. Robert B. Borsum Region IX Office Babcock & Wilcox ATTN:

EIS COORDINATOR Huclear Power Generation Division 215 Fremont Street Suite 420, 7735 Old Georgetown Road San Francisco, California 94111 Bethesda, Maryland 20014 Mr. Frank Hahn

,Mr.

Richard D. Castro California Energy Connission 2231 K Street 1111 Howe Avenue Sacramento, califon 95814 Sacramento, California 95825 Mr. Gary Hursh, Esq.

Msl.

Eleanor Schwartz 520 Capital Mafl California State Office suite.?Qo.

600 Pennsylvania Avenue, S. E., Room 201 sacramento, California 95184 mashington, 0. C. 20003 Docketing and Service Section Office of the Secretary U. S. Nuclear Regulatory Commission Radiation Control Unit 14ahigtnD.C. 20555 Radiological Health Section 714 P Street, Room 498 Sacramento, Cjlifornia 94814

Toledo Edison Compa 9

cc w/enclosure(s):

Mr. Donald H. Hauser, Esq.

Director, Technical Assessment The Cleveland Electric Division Illuminating Company Office of Radiation Programs P. 0. Box 5000 (AW-459)

Cleveland, Ohio 44101 U. S. Environmental Protection Agency Crystal Mall #2 Gerald Charnoff, Esq.

Arlington, Virginia 20460 Shaw, Pittman, Potts and Trowbridge U. S. Environmental Protection Agency 1800 M Street, N.W.

Federal Activities Branch Washington, D.C. 20036 Region V Office ATTN:

EIS COORDINATOR Leslie Henry, Esq.

230 South Dearborn Street Fuller, Seney, Henry and Hodge Chicago, Illinois 60604 300 Madison Avenue Toledo, Ohio 43604 cc w/enclosure(s) and incoming dtd.:

Mr. Robert B. Borsum Babcock & Wilcox Ohio Department of Health Nuclear Power Generation Division ATTN:

Director of Health Suite 420, 7735 Old Georgetown Road 450 East Town Street Bethesda, Maryland 20014 Columbus, Ohio 43216 Iyan.W. Smith, Esq.

Ida' Rupp Public LibraryIvn.SmtEq 310up Publio ibrarAt6ic6 Safety and Licensing Board Panel Port Clinton,0hio 43452 U.S. Nuclear.Regulatory Commission Washington, D.C. 20555 President, Board of County Dr. Cadet H. Hand, Jr.

Commissioners of Ottawa County Director, Bodega Marine Laboratory Port Clinton, Ohio 43452 University of California P.O. Box 247 Attorney General Bodega Bay, California 94923 Department of Attorney General 30 East Broad Street Dr. Walter H. Jordan Columbus, Ohio 43215 881 W. Outer Drive Oak Ridge, Tennessee 37830 Harold Kahn, Staff Scientist Honorable Tim McCormack Power Siting Commission 361 East Broad Street statehouse Columbus, Ohio 43216 statlhuse Columbus, Ohio Mr. Rick Jagger Ms.

Jean Deluljak Industrial Commission 381 East 272 Sta te of hio Euclid, Ohio 44117 2323 West 5th Avenue Columbus, Ohio 43216 lip

Florida Power Corporation cc w/enclosure(s): MMr.

Robert B. Borsum Mr..S. A. Brandimore Vice President and General Counsel Babcock & Wilcox P. 0. Box.14042 Nuclear Power Generation Division St. Petersburg, Florida 33733 Suite 420, 7735 Old Georget6wn Road Bethesda, Maryland 20014 Mr.

ilbur Langely, Chairman Board of County Commissioners cc w/enclosures & incoming Citrus County dtd:

Iverness, Florida 36250 Bureau of Intergovernmental Relations U. S. Environmental Protection Agency 660 Apalachee Parkway Region IV Office Tallahassee, Florida 32304 ATTN:

EIS COORDINATOR 345 Courtland Street, N.E.

Atlanta, Georgia 3U3.0 Director. Technical Assessment Division Office of Radiation Programs (AW-459)

U. S. Environmental Protection Agency Crystal Mall #2 Arlington, Virginia 20460 Crystal River Public Library Crystal River, Florida 32629 Mr. J. Shreve The Public Counsel Room 4 Holland Bldg.

Tallahassee, Florida 32304 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida lontgomery Building 2562 Executive Center Circle, E.

Tallahassee, Florida 32301 Attorney General Department of Legal Affairs The Capitol Tallhassee, Florida 32304

Metropolitan Ed, so o

y cc w/enclosure(s):

G. F. Trowbridge, Esquire Dauphin County Office Emergency Shaw, Pittman, Potts & Trowbridge Preparedness 1800 M Street, N.W.

Court House, Room 7 Washington, D. C. 20036 Front & Market Streets Harrisburg, Pennsylvania.17101 GPU Service Corporation Richard 11.

Heward, Project Manager
r.

T..Gary 8roughtQ n Safety and Department of Environmental Resources Licensing Manager ATTN:

Director, Office of Radiological 260 CherryC Hill Road Health Parsippany, New Jersey 07F54 Post Office Box 2063 Harrisburg, Pennsylvania 17105 Pennsylvania Electric Company fr. R. W. Conrad Director, Technical Assessment Vice President, Generation Division 1001 Broad Street Office of Radiation Programs Johnstown, Pennsylvania 15907 (AW-459)

U. S. Environmental Protection. Agency Miss Hary V. Southard, Chairman Crystal Mall #2 Citizens for a Safe Environment Arlington, Virginia 20460 Po.st Office Box 405 Harrisburg, Pennsylvania 17108 Mr. Robert B. Borsum Babcock & Wilcox Government Publications Section Nuclear Power Generation Division State of Library of Pennsylvania Suite 420, 7735 Old Georgetown Road Box 1601 (Education Building)

Bethesda, Maryland 20014 Harrisburg, Pennsylvania 17126 cc w/enclosure(s) and incoming Dr. Edward 0. Swartz dtd.

Board: of Supervisors Londonderry Township Governor's Office of State Planning RFD#l - Geyers Church Road and Development Hiddletown, Pennsylvania 17057 ATTN:

Coordinator, Pennsylvania State Clearinghouse U. S. Environmental Protection Agency P. 0. Box.1323 Region III Office Harrisburg, Pennsylvania 17120 ATTN:-

EIS COORDINATOR Curtis Buil ding (Sixth Floor) 6thand Walnut Streets Philadelphia, Pennsylvania 191061 DrcoTcnc Assessmen

E. Case R. Mattson D. Eisenhut D. Ross D. Vassallo C. Heltemes T. Novak Z. Rosztoczy S. Israel P. Matthews G. Mazetis P. Norian N. Wagner K. Mahan J. Lee W Gammill B. Grimes R. Reid Project Manager, DOR R. A. Capra NRC PDR Docket Files (7)

ACRS (16)

Local PDR (s) 2C ee j Attendees SB Chron File

V REG(

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 JUL 3 1 1979 Docket Nos.:

50-269, 270, 287, 50-302, 312, 313, 346 FACILITIES:

Oconee Nuclear Station, Units No. 1, 2, and 3 Crystal River Unit No. 3, Nuclear Generating Station Rancho Seco Nuclear Generating Station Arkansas Nuclear One, Unit No. 1 Davis-Besse Nuclear Power Station, Unit No. 1 LICENSEES:

Duke Power Company Florida Power Corporation Sacramento Municipal Utility District Arkansas Power & Light Company Toledo Edison Company

SUBJECT:

SUMMARY

OF MEETING HELD ON JULY 19, 1979, TO DISCUSS OUTSTANDING ITEMS FROM COMMISSION ORDERS AND IE BULLETINS GENERIC TO ALL BABCOCK & WILCOX (B&W) OPERATING PLANTS On July 19, 1979, members of the NRC staff were invited to attend a meeting of the B&WOwners' Group (TMI-2 Follow-up Subcommittee) in Bethesda, Maryland to discuss outstanding items related to the Commission's confirmatory shutdown Orders issued for each B&W operating plant and Bulletins issued by the NRC's Office of Inspection and Enforcement (IE).

In addition to representatives from the NRC staff and the licensees listed above, representatives from B&W also participated in the meeting.

A list of attendees is provided as Enclosure 1 to this summary.

Background

In light of the Three Mile Island Unit 2 accident, the Commission confirmed by Orders, issued to each holder of an operating license for facilities using a B&W designed reactor, that each licensee would undertake a series of actions, both immediate and long-term, to increase the capability and reliability of the plant to respond to various transient events. In addition, each Order confirmed that the facility would shut down or remain shut down and not be restarted until the immediate actions specified in the Order were accomplished and found acceptable by. the Director, Office of Nuclear Reactor Regulation. These immediate actions were completed by each licensee, reviewed by the NRC staff and found acceptable.

However, in each staff Safety Evaluation of the licensee's compliance with the Commission Order, certain issues were found to require more detailed and long-term study prior to their final resolution. Several of these issues are applicable generically to all of the B&W operating plants.

In addition to the Commission Orders, a series of IE Bulletins were issued (79-05,79-05A and 79-05B) to each of the B&W operating plants. These Bulletins also required a series of actions to be taken by the licensees. Actions taken by the licensees, as a result of these Bulletins, are.presently undergoing review by the NRC staff. Many of these specific actions are also applicable generically to all of the B&W operating plants.

Meeting Summary JUL 1 1979 The major~purpose of the meeting was to discuss these generic issues with theB&W Owners' Group to determine the feasibility of resolving some of these issues through the Owners' Group instead of through separate interaction with each licensee.

Discussion The NRC staff explained the respective roles of the special task forces which have been organized within the Office of Nuclear Reactor Regulation, subse quent to the TMI-2 accident. A detailed explanation of the Bulletins & Orders (B&O) Task Force was then presented. This included a breakdown of the work scope, interfacing organizations, organization within the Task Force, schedule of B&O activities with respect to the B&W facilities, and a review of the items considered by the staff as outstanding B&W generic issues. A copy of each of the viewgraphs presented by the staff is provided in Enclosure 2 to this summary.

Mr. David Holt (Duke Power Company), Chairman of the Subcommittee, then presented an overview of themembership, scope, objectives and organization of the B&W Owners' Group. Mr. Holt pointed out that the Owners' Group does not constitute a legal entity and'assumes no financial or legal responsibility for its members or member companies. As such, all contractual matters and program funding are controlled by each member in accordance with individual contracts with B&W or other suppliers of services to the Owners' Group. The Owners' Group cannot make any legal or commercial commitments for individual members. As a result of this understanding, it was agreed between the Owners' Group and the staff that the Group could still be useful by providing a forum for joint discussions of generic issues and establishing unified positions during interactions with B&W and/or the NRC. However, correspondence requiring the expenditure of funds would not be addressed to the Owners' Group, but would be sent to each of the member licensees. A copy of the Owners Group organization and charter is provided as Enclosure 3 to this summary.

The NRC staff then presented a detailed discussion of auxiliary feedwater system (AFW) reliability and performance. Upgrading the performance and reliability of the AFW system was required as an immediate action on all of the Commission's Orders issued to the B&W plants. It was pointed out that additional review and modifications would be required in this area in the future. The staff discussed its detailed review of the AFW systems installed in all of'the plants with Westinghouse and Combustion Engineering designed reactors. This review included obtaining a response to a staff questionnaire, and meeting with each licensee to review the "as built" design and operation of each AFW system. The information obtained for each plant was evaluated by a systems engineer and a systems reliability engineer, with emphasis given to improving AFW system performance and reliability, including the identification of dominant failure modes and giving consideration to the potential for the human.operators to affect the AFW system performance and reliability. The criteria of the current issue of Standard Review Plan Section 10.4.9 and

JUL 3 1 1979 Meeting Summary

-3 Branch Technical Position ASB 10-1 were also used in the evaluation. It was pointed out that the objective of the short-term recommendations is to supplement IE Bulletin requirements for the Westinghouse and Combustion Engineering plants to quickly improve the AFW system performance and relia bility and the objective of the long-term recommendations is to end up with an AFW system that is adequate and answers all relevant TMI-2 concerns. The draft short-and long-term recommendations of this study were discussed with the Owners' Group. The staff evaluation of the Westinghouse and Combustion Engineering plants will be available as a NUREG document by the end of August 1979. It was suggested by the NRC staff and agreed to by the Owners' Group that they would perform a reliability study on their plants, using the same methodology as the staff used for the Westinghouse and Combustion Engineering plants. The Owners' Group committed to meeting with the staff in mid-August to outline their plan for performing this study. The study would serve as a basis for continued design modifications and/or improvements to upgrade the performance and reliability of the AFW system.

The staff closed the meeting with a review of the status of the following topics:

(1) IE Bulletin Review Draft Safety Evaluations have been prepared for responses to Bulletins 79-05 and 79-05A. Responses to Bulletin 79-05B are being reviewed and incorporated into these Safety Evaluations. A request for addi tional information will be sent to each licensee, where required, to resolve any open items.. Issuance of the Safety Evaluations should take place in September 1979.

(2) Technical Specification Change Requests As a result of actions taken to comply with the Commission's Orders and IE Bulletins, each licensee has filed requests for changes to its facilities' Technical Specifications. These requests are being reviewed by the staff and should result in license amendments being issued to the utilities in late August or early September 1979.

(3) Long-Term Actions Required by Commission Orders As part of the requirements for lifting the Commission Order, each utility was directed to provide a schedule, within 30 days of the Order being lifted, which provides its schedule for the completion of the long-term requirements of the Order. The staff is presently reviewing the adequacy of the long-term schedules. If the schedules need to be modified, the staff will deal directly with the licensees.

(4) Implementation of Short-Term Recommendations of the TMI-2 Lessons Learned Task Force A meeting will be held on August 1, 1979, in Bethesda, Maryland to discuss this topic. Additional meeting information, such as time, place and agenda will be forthcoming.

0.1 Meeting Summary JUL 3 1 1979 Conc usion The following is a summary of commitments made at the meeting:

Staff (1) Provide requests for additional information on IE Bulletins responses by August 1979.

(2) Provide license amendments for Technical Specification changes by late August 1979.

(3) Provide further information on the implementation of the short-term recommendations of the TMI-2 Lessons Learned Task Force at the August 1, 1979 meeting.

Owners' Group (1) Advise the staff by letter of the procedures it intends to follow for interacting and corresponding with the staff.

(2) Meet with the staff in mid-August to outline its plan for performing the AFW system reliability study.

(3) Meet with the staff at a future date to discuss additional analyses needed in the areas of inadequate core cooling and evaluation of accidents and transients beyond current design analyses.

R. A. Ca ra, B&W Project Manager Bulletins & Orders Task Force Office of Nuclear Reactor Regulation

ENCLOSURE 1 LIST OF ATTENDEES Duke Power Company D. Holt R. Gill Florida Power Corporation P. Baynard Sacramento Municipal Utility District S. Anderson Arkansas Power & Light Company D. Mardis D. Williams Toledo Edison Company C. Domeck E. Novak Babcock & Wilcox E. Kane R. Ham NRC T. Novak (B&O Task Force)

P. Matthews (B&O Task Force)

M. Taylor (Probabilistic Analysis Branch)

R. Reid (Operating Reactors)

D. Garner (Operating Reactors)

R. Capra (B&O Task Force)

CLOSURE 2 NRR SPECIAL TASK FORCES TMI-2 SUPPORT R. VOLLMER BULLETINS & ORDERS D. ROSS LESSONS LEARNED R. MATTSON UNRESOLVED SAFETY ISSUES S. HANAUER NRC/TMI INVESTIGATION GROUP

INCLOSURE 2 (Page 2)

BULLETINS & ORDERS TASK FORCE WORK SCOPE

1. SAFETY EVALUATION -

CONFORMANCE WITH COMMISSION'S ORDERS

2. SAFETY EVALUATION -

IE BULLETINS 79-05,79-05A, & 79-05B

3. CONDUCT GENERIC REVIEWS OF OPERATING PLANTS
4. APPLY "LESSONS LEARNED" RECOMMENDATIONS TO OPERATING PLANTS INTERFACING ORGANIZATIONS DIVISION OF OPERATING REACTORS DIVISION OF SYSTEMS SAFETY LESSONS LEARNED TASK FORCE INSPECTION & ENFORCEMENT (IE)

ACRS B&W UTILITIES -

DUKE, SMUD, AP&L, TECO, FPC, MET ED B&W OWNERS GROUP

BULLETINS & ORDERS TASK FORCE D.F. ROSS, JR., DIRECTOR T.H. NOVAK, DEPUTY DIRECTOR PROJECT MANAGEMENT SYSTEMS GROUP ANALYSIS GROUP GROUP LEADER GROUP LEADER GROUP LEADER C-)

J. HELTEMES S. ISRAEL Z. ROSZTOCZY m

B&W TEAM LEADER TEAM LEADER R. CAPRA G. MAZETIS P. MATTHEWS GE REACTOR SYSTEMS CE--AUXILIARY SYSTEMS CE POWER SYSTEMS OPERATING LICENSE W

CONTAINMENT SYSTEMS-INST. & CONT. SYSTEMS

SCHEDULE OF B&O ACTIVITIES FOR B&W ACTIVITY ORDER REVIEW ISSUE COMMISSION ORDERS 5/7/79 THROUGH 5/17/79 ISSUE SAFETY EVALUATION ON COMPLIANCE (LIFT ORDER) 5/18/79 THROUGH 7/6/79 RECEIVE LONG TERM SCHEDULE 6/18/79 THROUGH 8/6/79 RECEIVE TECH. SPEC.

5/25/79 THROUGH 7/13/79 REVIEW TECH. SPEC./ISSUE LICENSE AMENDMENTS 8/79 C)

REVIEW LONG TERM SCHEDULE / ISSUE SAFETY EVALUATION ONGOING BULLETIN REVIEW ISSUE BULLETINS (79-05,79-05A, & 79-05B) 4/79 REVIEW RESPONSES / DRAFT SAFETY EVALUATIONS 7/79 ISSUE REQUEST FOR ADDITIONAL INFORMATION 7/79 ISSUE SAFETY EVALUATIONS 8/79 GENERIC REVIEW NUREG 0560 -

FEEDWATER TRANSIENTS 5/79 NUREG 0565 SMALL BREAK LOCA 8/79 DEGRADED CORE COOLING 12/79 EVALUATION OF ACCIDENTS & TRANSIENTS BEYOND CURRENT DESIGN 12/79

T7MI-2 ACCIENAT UTILITY VENDOR 1eis MEETINGS]$:

MEETINGS ISSUED ORDERS ISSUED IEB RESPONsSS B&0 EVALUATION

.B&0 EVL ISSUE JS ISSUE SER, E

LICENSE AMEND LONG TERM ACTIONS GENERC STDIESTECH-SPEC CHANGES B&W OWNERS L--

ES SOS 00NSLEA RN E D --

GROUP ADDITIONAL INSTRUCTIO NS TO UTILITIES ISSUE SERs &

LICENSE AMEND.

ENCLOSURE 2 (Page 6)

B&W GENERIC ITEMS LONG-TERM ITEMS REQUIRED BY COMMISSION ORDER

1.

FAILURE MODE AND EFFECTS ANALYSIS FOR THE ICS

2. UPGRADE ANTICIPATORY TRIP TO SAFETY-GRADE
3. OPERATOR TRAINING AND DRILLING - HIGH STATE OF PREPAREDNESS LONG-TERM ITEMS RESULTING FROM STAFF SE AND OTHER GENERIC STUDIES
1. ANALYSES:

LOFW AND OTHER ANOMALOUS TRANSIENTS SMALL BREAK LOCA LIFT FREQUENCY AND MECHANICAL RELIABILITY OF PORV AND SAFETY VALVES

2. PRESSURE VESSEL INTEGRITY:

P-T CURVE FOR ACCIDENT CONDITIONS THERMAL-MACHANICAL REPORT ON BEHAVIOR OF VESSEL MATERIALS

3. AFW/EFW:

UPGRADE RELIABILITY SHORT-TERM RECOMMENDATIONS OF LESSONS LEARNED TASK FORCE

1. EMERG. PWR. FOR PZR HEATERS & LVL INDICATION AND PORV & BLOCK VALVE
2. PERFORMANCE TESTING OF PORV AND SAFETY VALVES
3. DIRECT INDICATION FOR PORV
4. INSTRUMENTATION FOR INADEQUATE CORE COOLING
5. CONTAINMENT ISOLATION DIVERSITY
6. SHIFT SUPERVISOR RESPONSIBILITIES
7. SHIFT TURNOVER
8. ACCESS CONTROL FOR CONTROL ROOM

ENCLOSURE 2 (Page 7)

SHORT TERM RECOMMENDATIONS OF THE TMI-2 LESSONS LEARNED TASK FORCE -

NUREG 0578 IMPLEMENTATION BY B&O TASK FORCE

1. EMERG. PWR. FOR PZR HEATERS & LVL. IND. AND PORV (AND BLOCK VALVE)
2. PERFORMANCE TESTING OF PORV AND SAFETY VALVES
3. DIRECT INDICATION FOR PORV
4. INSTRUMENTATION FOR INADEQUATE CORE COOLING
5. CONTAINMENT ISOLATION DIVERSITY
6. AUTO-INITIATE AFW
7. AFW FLOW INDICATION
8. ANALYSIS OF DESIGN AND OFF-NORMAL TRANSIENTS AND ACCIDENTS
9. SHIFT SUPERVISOR RESPONSIBILITIES
10. SHIFT TURNOVER
11. ACCESS CONTROL FOR CONTROL ROOM IMPLEMENTATION BY OTHERS 1.

RECOMBINER PENETRATION

2. RECOMBINER INSTALLATION
3. INTEGRITY OF SYSTEMS OUTSIDE CONTAINMENT
4. SHIELDING FOR POST ACCIDENT OPERATIONS
5. POST ACCIDENT SAMPLING
6. INCREASED RANGE ON RADIATION MONITORS
7. IODINE INSTRUMENTATION
8. SHIFT SAFETY ENGINEER
9. ONSITE TECH. SUPPORT CENTER
10. ONSITE OPERATIONAL CENTER
11. REVISED LCOs BASED UPON SAFETY SYSTEM AVAILABILITY OVERLAPS WITH ORDERS OR STAFF.SAFETY EVALUATIONS

B&W 177 FA OWNERS' GROUP go S

Se Os IST L

Executive Users Comite Committee Group Asymmetric Environmental OTSG Tube TMI-2 RV Reactor ATWS LOCA Qualification Failure Follow-up Materials Subcomittee Loads of Electrical Subcommittee Subcommittee Subcommittee Subcommittee Subcommittee Components C

Subcommittee IFPC.

ShF O

ENCLOSURE 3 (Page 2)

B&W 177 FA. 07,TER'S GROUP E~aI:~R~u AMD L I

IG Approved by Exec-u'/e Cc,-,.ittee June 2, 1977

ENCLOSURE 3 (Page

3)

B&W 177 FA OWHIER'S GOUP Engineerinp & Licensinr Charter

1. Membership Membership in the E&W 177 FA Owner's Group - Engineering and Licensing (Owner's Group) shall be limited to represe:.tatives of utility corpanies
  • or their service organizations who are currently either designing, con structing or operating generating plants utilizing a Babcock & Wilcox 177 FA nuclear steam supply system.

A member can participate in any one, or all, of the active issues of the Owner's Group. Attachment 1 identi fies current participating utilities and their representatives.

2. Scone Owner's Group activities shall be directed to engineering and licensing issues related to B&W 177 fuel assembly plants.

Problems related to plant operation generally fall within the dcmain of the 3&W Plant Super intendent User's Group and are not specifically addressed by this Group; however, the Chairman of the Executive Committee should establish con munication with the Superintendent's Group on matters that are of inter est to both groups. The Owner's Group does not constitute a legal entity, and assumes no financial or legal responsibility for its mer.bers or member companies.

3.

Ob jectives The objectives of the Owner's Group are:

a. To provide a forum for joint discussions and/or resolution of generic issues through effective communication between members, and between the Owner's.Group and other organizations.
b. To provide mechanisms for establishing unified positions during inter actions with B&W and/or the NRC on generic issues.
c.

To provide a method for controlling costs and schedules relative to the resolution of generic issues.

d. To improve communications between members on nongeneric issues.
4. Organization The Owner's Group is governed by an Executive Committee consisting of one member from each participating utility company or their designated service organization.

2 NCLOSURE 3 (Page 4)

Responsibilities and duties of the Executive Committee include:

a. Establish policy for the Owner's Group.
b. Select a Chairman and Secretary to serve a term of one calendar year.
c.

Meet as often as deemed appropriate by the Chairman, but no less than tvice a year.

d.

Establish non-standing technical committees for specified purposes.

e.

Each member of the Executive.Committee or his designee shall have one vote regarding recommended actions on a specific item.

A majority of those members active on a given issue must agree to an action before it is undertaken by the Owner's Group.

Dissenting members are encour aged to participate with the majority; however, they shall not be committed to do so and may act individually on their own behalf.

As appropriate, all members who choose to participate on a specific issue may be requested to submit letters to the Executive Committee Chairman indicating that they will support noncommercial decisions made by the Owner's Group as necessary to resolve the issue.

Responsibilities and duties of the technical committees include:

a. Technical committees shall have at least one Executive Committee member at'all times.
b. Technical committee voting membership may include Non-Owner's Group members, consultants, B&d representatives and others agreed upon by the Executive Comittee.
c. Technical committees will be dissolved upon completion of their assign ment and will report progress of their activities to the Executive Committee Chairman as requested and shall submit a final report summariz ing their accomplishments.
d.

Technical committees may develop mutually beneficial contracts with consultants, vendors, and other agencies to resolve a mutual problem.

These contracts will in no way financially commit the Owner's Group, aS an entity, but may commit individual members through individual contracts.

e.

Technical committees shall appoint a Chairman and/or Secretary to organize their activities and maintain records for the committee.

inutes of Technical Committee meetings shall be prepared and transmitted to Tech nical and Executive.Comittee mebers.

Duties of the Executive Committee Chairman include:

a.. Chairing all Executive Committee meetings.

ENCLOSURE 3 (Page 5

b. Establichingn agendas, dates and locations for all Executive Comn mittee meetines.
c.

Acting as the Owner's Group spokcs 1 dn metings with ner organizations.

Hie may appoint an alternate, to,act in his absecnce.

DUties of the Executive Secretary include:

a. Preparation of minutes for all Executive Comm ittee meetings Minutes shall be prpared and transmitted to all members within two weeks of-each'me-tin,.
b. Chairing Executive Committee meetings in the absence of the Chair man.
5.

Program Fundin All contractual matters mid program funding shall be controlled by each member in accordance with individual contracts with B&W1 or othe uI plirsosevcst the Owner's Group. The Owner's Group shall not commercial commitments for individual embers.

6.

MeetinG Expenses All attendinp memibers shall be responsible for: their own expenses, an d a prorated portion of common expenses relative to each Owner's Gdoun meeting.

.Charter Aroval and Amendment This Charter shall be approved, and can be amended, by a majority vote of the Executive Comrmittee.

BABCOCK & WILCOX OWNERS GROUP UTILITIES (OPERATING REACTORS)

Mr. william 0. Parker, Jr.

Vice President-Steam Production Duke Power Company P.O. Box 2178 422 South Church Street Charlotte, North Carolinia 28242 Mr. William Cavanaugh, III Vice President, Generation and Construction Arkansas Power & Light. Company P.O. Box 551 Little Rock, Arkansas 72203 Mr. J. J. Mattimoe, Assistant General Manager and Chief Engineer Sacramento Municipal Utility District 6201 S Street P.O. Box 15830 Sacramento, California 95813 Mr. Lowell E. Roe Vice:President, Facilities Development Toledo Edison Company Edison Plaza 300 Madison Avenue Toledo, Ohio 43652 Mr. W. P. Stewart Manager, Nuclear Operations Florida Power Corporation P.O. Box 14042 Mail Stop C-4 St. Petersburg, Florida 33733 Mr. J. G. Herbein Vice President-Generation Metropolitan Edison Company Post Office Box 542 Reading,. PA. 19640

Duke Power Company cc w/enclosure(s):

Mr.. William L. Porter Duke Power Company Mr.Robert B. 80rsun Post Office Box 2178 Babcock & Wilcox 422 South Church Street Nuclear Power Generation Division Charlotte, North Carolina 28242 Suite 420, 7735 Old Georgetown Road Bethesda, Maryland 20014 J. Michael McGarry, III, Esquire M

DeBevoise & Liberman 700 Shoreham Building NUS Corporation 806 15th Street, N.W.

2536 Countryside Boulevard Washington, 0. C. 20005 Clearwater, Florida 33515 Oconee Public Library cc w/enclosure(s) and incoming Ocone Pubic Lirarydtd.:

201 South Spring Street Walhalla, South Carolina 29691 Off Ofice of Intergovernnental Relations' Honorable James

. Phinney 116 West Jones Street Honorble Jmes H Phiney Raleigh, North Carolina 270 County Supervisor ofOconee County27603 Walhalla, South Carolina 29621 Director, Technical Assessment DiVision Office of Radiation Programs (AW-459)

U. S. Environmental Protection Agency Crystal Mall #2 Arlington, Virginia 20460 U. S. Environmental Protection Agericy Region IV Office ATTN:

EIS COORDINATOR 345 Courtland Street, N.E.

Atlanta, Georgia 30308 U. S. Nuclear Regulatory Commission Region II Office of Inspection and Enforcement ATTN: Mr. Francis Jape P. O.Box 85 Seneca, South Carol ina 29678

Arkansas Power & Light Company cc.w/enclosure(s):

Phillip K. Lyon, Esq.

Director, Technical Assessment House, Holms & Jewell Division 1550 Tower Building Office of Radiation Programs Little Rock, Arkansas 72201 (AW-459)

U. S. Environmental Protection Agency Mr. David C. Trimble Crystal Mall #2 Manager, Licensing Arlington, Virginia 20460 Arkansas Power & Light Company P. 0. Box 551 U. S. Environmental Protection Agenc.

Little Rock, Arkansas 72203 Region VI Office ATTN:; EIS COORDINATOR Mr. James P. O'Hanlon 1201 Elm Street General Manager First International Building Arkansas Nuclear One Dallas, Texas.

75270 P. 0. Box 608 RusselIville, Arkansas 72801 cc w/enclosure(s) and incoming dtd.:

Mr. William Johnson Director, Bureau of Environmental

. S. Nuclear Regulatory Commission Health Services P. 0. Box 2090 4815 West Markham Street Russel1ville, Arkansas 72801 Little Rock, Arkansas 72201 Mr. Robert B. Borsum Babcock & Wilcox Nuclear Power Generation Division Suite 420, 7735 Old Georgetown Road Bethesda, Maryland 20014 Troy B. Conner, Jr., Esq.

Conner, Moore & Corber 1747 Pennsylvania Avenue, N.W.

Washington, D.C.

20006 Arkansas Polytechnic College Russellville, Arkansas 72801 Honorable Ermil Grant Acting County Judge of Pope County Pope County Courthouse Russellville, Arkansas 72801

M I~ichael Le Gsq.

Sacramento Munic p

iy 1150 17th Stree N. W.

District Washington, D. C. 20036 Dr. Richard F. Cole Atomic Safety and Licensing Board Panel cc w/enclosure(s):

cc wencls~ur~s):U. S. Nuclear Regulatory Comnissiofl David S. Kaplan, Secretary and General Counsel 6201 5 Street

~.

BX 1830Mr.

Frederick J3. Shon P.

0. Box 15830 Sacramento, California 95813 Atomic Safety and Licensing Board Panel
  • U. S. Nuclear Regulatory Cornissiofl Sacramento County Washington, 0. C. 20555 Board of Supervisors 827 7th Street., Room 424 Sit 380 Sacramento, California 95814
  • Washington, D. C. 20006 California Energy Commission ATTN:

Librarian 1111 Howe Avenue Sacramento, California 95825 Mr. Robert Christopherson

  • Friends of the Earth Business and Municipal Department Sacramento City-County Library 828 1 Street Sacramento, California 9581495814 Diecor TchialAsesmetAtomic.

Safety and Licensingl Board Panel Director, Technical Assessmnt Diison.

U. S.. Nuclear Regulatory Coarnission

.. Division Office of Radiation Programs (AW-459),

(A-5)Atomic Safety and Licensing Appeal U. S. Environmental Protection Agency Crystal Fall i2 U. S. Nuclear Regulatory Comnission

Vt. S. Environmental Protction Agency Mr. Robert B. Borson Region IX Office Babcock Wilcox ATT:

IUS COORDINATOR Nuclear Power Generation Division 215 Fremont Street Suite 420, 7735 Old Georgetown Road VSan Francisco,.California 94111 Bethesda, Maryland 20014 Mr. Frank Hahn Mr. Richard D. Castro California Energy CoReission 11,11 Howe Avenue Sarmet,Cliona 95814 Sac-ramento, California 95825 TMothGy...

Dll, Esq.

Ms Eleanor Schwartz 5r. caal~rh Mall Ca lifornia State Office 50CptlMi Suite 700 600-Pennsylvania Avenue, S. E., Room 201 Sacramento, California 95184 Washington, D. C.

20003 Docketing and Service Sectionader en Mr.iRorti Ch rtpersnbIHeIth Ofrice of ethe Secretary U. S.CNuclear Regulatory Commission AN: Chief, e

~)

Wshigton 0.C. 2555Radiation Control Unit Radiological Health Section 714 P Street, Room 49.8.

Sacramento, California 9814 AtmcSft n:icpigBadPn

Toledo Edison Compa cc w/enclosure(s):

Mr. Donald H. Hauser, Esq.

Director, Technical Assessment The Cleveland Electric Division Illuminating Company Office of Radiation Programs P. 0. Box 5000 (AW-459)

Cleveland, Ohio 44101 U. S. Environmental Protection Agency Crystal Mall #2 Gerald Charnoff, Esq.

Arlington, Virginia 20460 Shaw, Pittman, Potts and Trowbridge U. S. Environmental Protection Agency 1800 M Street, N.W.

Federal Activities Branch Washington, D.C.

20036 Region V Office ATTN:

EIS COORDINATOR Leslie Henry, Esq.

230 South Dearborn Street Full er, Seney, Henry and Hodge Chicago, Illinois 60604 300 Madison Avenue Toledo, Ohio 43604 cc w/enclosure(s) and incoming dtd.:

Mr. Robert B. Borsum Babcock & Wilcox Ohio Department of Health Nuclear Power Generation Division ATTN:

Director of Health Suite 420, 7735 Old Georgetown Road 450 East Town Street Bethesda, Maryland 20014 Columbus, Ohio 43216 Ida Rupp Public Library In Smith, Esq.

310 Madison Street At6niic Safety and Licensing Board Panel Port Clinton,Ohio.

43452 U.S. Nuclear Regulatory Commission Washington, D.C. 20555 President, Board of County Dr. Cadet H. Hand, Jr.

Commissioners of Ottawa County Director, Bodega Marine Laboratory Port Clinton, Ohio 43452 University of California P.O. Box 247 Attorney General Bodega Bay, California 94923 Department of Attorney General 30 East Broad Street Dr. Walter H. Jordan Columbus, Ohio 43215 881 W. Outer Drive Oak Ridge, Tennessee 37830 Harold Kahn, Staff Scientist Honorable Tim McCormack Power Siting Commission Ohio Senate 361 East Broad Street Statehouse.

Columbus, Ohio 43216 Columbus, Ohio Mr. Rick Jagge Ms.

Jean Deluljak Industrial Commission 381 East 272 Sta te of 0h0 Euclid, Ohio 44117 2323 West 5th Avenue Columbus, Ohio 43216

'I)

Ll

Florida Power Corporation cc w/enclosure(s):

Hr..S. A. Brandimore Vice President and General Counsel Babcock & Wilcox P. 0. Box 14042 Nuclear Power Generation Division St. PtBurFoido33 Suite420, 7735 Old Georget6wn Road St. Petersburg, Florida 33733 Bethesda,- Maryland 20014 Mr. Wilbur Langely, Chairman Board of County Commissioners cc w/enclosures & incoming Citrus County dtd:

Iverness, Florida 36250 Bureau of Intergovernmental Relations U. S. Environmental Protection Agency 660 Apalachee Parkway Region IV Office Tallahassee,.Florida 32304 ATTN:. EIS COORDINATOR 345.Courtland Street, N.E.

Atlanta, Georgia 3N3081 Director. Technical Assessment Division SOffice of Radiation Programs (AW-459)

U. S. EnvironmentalofProtection Agency Crystal Mall.#2 Arlington, Virginia R20460 Crystal River Public Library Crystal River, Florida 32629 Mr.' J. Shreve T'he Public Counsel Rolom 4 Holland Bldg.

Tallahassee, Florida 32304 ADiec tr Tecncaresmn Department of Environmental Regulation Power Plant Siting Section tate of Florida Mont gmery Building 2562 Executive Center Cirle, E yTallahassee, Florida 32301 Attorney General Department of Legal Affairs The bCapitolu Talla'hassee, Florida 32304 A dministrato Department.o Powe PlntS

Metropolitan Edison C any cc w/enclosure(s):

G. F. Trowbridge, Esquire Dauphin County Office E ergency Shaw, Pittman, Potts & Trowbridge Preparedness 1800 M Street, N.W.

Court House, Room 7 Wathington, D. C. 20036 Front & Market Streets Harrisburg, Pennsylvania 17.101 GPU Service Corporation Richard l. Heward, Project Manager Mr. T.. Gary Broughton, Safety and Department of Environmental Resources Licensing Manager ATTN: Director, Office of Radiological 260 Cherry Hill Road Health Parsippany, New Jersey 07Q54 Post Office Box 2063 Harrisburg, Pennsylvania 17105 Pennsylvania Electric Company Mr. R. W. Conrad Director, Technical Assessment Vice President, Generation Division 1001 Broad Street Office of Radiation Programs Johnstown, Pennsylvania 15907 (AW-459)

U. S. Environmental Protection Agency Miss Mary V. Southard, Chairman Crystal Mall #2 Citizens for a Safe Environment Arlington, Virginia 20460 Post Office Box 405 Harrisburq, Pennsylvania 17108 Mr. Robert B. Borsum Babcock & Wilcox Government Publications Section Nuclear Power Generation Division State of Library of Pennsylvania Suite 420, 7735 Old Georgetown Road Box 1601 (Education Building)

Bethesda, Maryland 20014 Harrisburg, Pennsylvania 17126 cc w/enclosure(s) and incoming Dr. Edward 0. Swartz dtd.:

Board of Supervisors Londonderry Township Governor's Office of State Planning RFD#1 - Geyers Church Road and Development 11iddletown, Pennsylvania 17057 ATTN: Coordinator, Pennsylvania State Clearinghouse U. S. Environmental Protection Agency P. 0. Box 1323 Region III Office Harrisburg, Pennsylvania 17120..

ATTNJ:

EIS COORDINATOR Curtis Building (Sixth Floor) 6th ahd Walnut Streets Philadelphia, Pennsylvania 19106

E. Case R. Mattson D. Eisenhut D.

Ross D. Vassallo C. Heltemes

( )

T. Novak Z. Rosztoczy S. Israel P. Matthews G. Mazetis P. Norian N. Wagner K. Mahan J. Lee W Gammill B. Grimes R. Reid Project Manager, DOR R. A. Capra NRC PDR Docket Files (7)

ACRS (16)

Local POR ()

CRee j q Attendees SB Chron File