MONTHYEARML23173A1522023-06-22022 June 2023 Request for Additional Information NextEra Fleet Emergency Plan Amendment Request ML23156A3042023-05-31031 May 2023 Acceptance of Requested Licensing Action Amendment Request to Remove Period of Applicability from Pressure Temperature Limits and Low Temperature Over Pressure Protection Curves ML23109A1862023-04-19019 April 2023 and Turkey Point Acceptance of Requested Licensing Action Proposed Alternative to Asme Section XI Authorizing Implementation of Asme Code Case N-752-1 ML23066A1892023-03-0303 March 2023 OEDO-22-00419: Email Dated 3-3-2023 to Petitioner on Seabrook ASR Petition ML23066A0892023-02-24024 February 2023 OEDO-22-00419 - Email Dated 02/24/2023 to Petitioner on Seabrook Unit 1 ASR Petition ML23020A9392023-01-19019 January 2023 Acceptance of Requested Licensing Action Amendment Request to Revise Cooling Tower Service Water Loop or Cell Requirements (EPID L-2022-LLA-0183) (Email) ML23011A3082023-01-11011 January 2023 Request for Additional Information Regarding Relief Request 4RA-22-001 (L-2022-LLR-0074) ML22341A0012022-12-0606 December 2022 Acceptance of Requested Licensing Action Relief Request 4RA-22-001, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) ML22333A7452022-11-22022 November 2022 OEDO-22-00419 - Email: C-10 Response on PRB Initial Assessment - C-10 Petition on Seabrook ASR Concrete Degradation ML22287A1472022-10-13013 October 2022 2.026 Petition Screen-in Email ML22228A0552022-08-15015 August 2022 Request for Additional Information Steam Generator Tube Inspection Report Review ML22200A1082022-07-19019 July 2022 Acceptance Review for TSTF-577 Amendment ML22153A4152022-05-31031 May 2022 Request for Additional Information Re 120V Inverter LAR from TS Branch - Final ML22116A2442022-04-26026 April 2022 Acceptance of Requested Licensing Action Relief Request 3IR-18 and 3IR-19 for End of Third 10-Year ISI Interval for Examinations with Limited Coverage ML22048B5522022-02-17017 February 2022 LTR-22-0010 Reply to Geoff Gilbert Email Concern About Seabrook Station Concrete Degradation ML22062B6642022-02-0707 February 2022 Request for Additional Information 120V Inverter LAR from the Electrical Branch ML22063A0002022-01-25025 January 2022 Requests for Additional Information from Risk Branch Regarding 120V Inverter LAR ML22020A2542022-01-20020 January 2022 LTR-22-0010 Geoff Gilbert, E-mail Concern About Seabrook Station Concrete Degradation ML21097A2512021-04-0707 April 2021 Request for Additional Information Regarding Steam Generator Tube Inspection Report Review for RFO 20 (EPID L-2020-LRO-0066) (Email) ML21054A0482021-02-23023 February 2021 Request for Additional Information Regarding Heat Flux Hot Channel Requirement Amendment Request ML20343A0942020-12-0303 December 2020 Request for Additional Information Regarding Seabrook (COVID-19) Part 73 Force-on-Force Exemption Request (L-2020-LLE-0219) ML20273A2812020-09-22022 September 2020 Acceptance of Requested Licensing Action License Amendment Request to Resolve Non-Conservative Heat Flux Hot Channel Factor Requiments ML20258A1502020-09-14014 September 2020 Request for Additional Information Related to Seabrook License Amendment Request Regarding One-Time Change to the AC Sources Operating TS ML20260H4932020-09-11011 September 2020 NRR E-mail Capture - Comanche Peak - Acceptance of Requested Licensing Action - Request to Use Later Code Edition of ASME OM Code ML20230A2962020-08-14014 August 2020 Acceptance of Requested Licensing Action License Amendment Request to Allow a One-Time Change to the AC Sources Operating TS ML20167A1842020-06-11011 June 2020 Request for Additional Information Related to Seabrook License Amendment Request Regarding TSTF-411 and TSTF-418 (L-2019-LLA-0237) ML20124A0012020-05-0101 May 2020 Cancellation of Call with Seabrook on Steam Generator Tube Inspections ML20114E1592020-04-23023 April 2020 Email and Request for Additional Information Related to Seabrook License Amendment Request to Degraded Voltage Time Delay Setpoint (L-2020-LLA-0012) ML20101N0932020-04-10010 April 2020 Acceptance of Requested Licensing Action Re Relief Request to Defer ASME Inspections Due COVID-19 (EPIDs L-2020-LLR-0055, -56, and -57) ML20101L0402020-04-10010 April 2020 Acceptance of Requested Licensing Action Relief Request to Use Code Case OMN-13 with 2012 Edition of the OM Code ML20101H3912020-04-0808 April 2020 Verbal Authorization for Seabrook Relief Request 3IIR-7 ML20087K8262020-03-27027 March 2020 Upcoming Steam Generator Tube Inservice Inspection ML20063J9792020-02-28028 February 2020 Acceptance of Requested Licensing Action Amendment Request to Revise Degraded Voltage Time Delay Setpoint ML19347C6732019-12-13013 December 2019 Acceptance of Requested Licensing Action Amendment Request to Adopt TSTF-418 ML19296D9122019-10-23023 October 2019 NRR E-mail Capture - Request for Additional Information Related to Seabrook Inverter Amendment (L-2019-LLA-0216) ML19295F5422019-10-15015 October 2019 NRR E-mail Capture - Seabrook Station, Unit No. 1 - Acceptance of Requested Licensing Action Amendment Request to Revise Onsite Power Distribution Requirements ML19275G7832019-10-0101 October 2019 Limited Appearance Statement from New Hampshire State Representative, Robert Harb Regarding the Seabrook Station Unit 1 License Amendment Application ML19270E6512019-09-27027 September 2019 Limited Appearance Statement from Joanna Hammond Regarding the Seabrook Station Unit 1 License Amendment Application ML19270E6542019-09-26026 September 2019 Limited Appearance Statement from Brian Campbell Regarding the Seabrook Station Unit 1 License Amendment Application ML19196A3592019-07-15015 July 2019 NRR E-mail Capture - Seabrook Station, Unit No. 1 - Acceptance of Requested Licensing Action Amendment Request to Revise the Emergency Core Cooling System Accumulator Technical Specifications ML19169A2412019-06-13013 June 2019 NRR E-mail Capture - Seabrook Station, Unit No. 1 - Acceptance of Requested Licensing Action Relief Requests for the Containment Building Spray Pump Flow and Vibration Testing (Epids L-2019-LLR-00 and L-2019-LLR-00) ML19162A0662019-06-0404 June 2019 Reply to Mr. Rick Jakious'S E-mail of 5-29-2019 to Stephen B. Comley Sr., We the People with Attachments ML19112A1782019-04-22022 April 2019 NRR E-mail Capture - Point Beach; Seabrook; Turkey Point - Acceptance of Requested Licensing Action Amendment Request to Revise Technical Specifications to Adopt TSTF-563 ML19101A4042019-04-11011 April 2019 NRR E-mail Capture - Point Beach; Seabrook; St. Lucie; Turkey Point - Acceptance of Licensing Action Relief Request to Use Encoded Phased Array Ultrasonic Examination Techniques for Ferritic and Austenitic Welds ML19070A2382019-03-10010 March 2019 LTR-19-0088 Maura Healey, Attorney General, the Commonwealth of Massachusetts, Ltr NextEras Requests for a License Amendment and Twenty-year Extension Prior to Issuance of a Final Decision in Adjudicatory Hearing on Concrete Degradation at ML19056A4522019-02-25025 February 2019 Comment from Philip Hurzeler Regarding the Emergency Petition Filed by C-10 on February 13, 2019 ML19056A4582019-02-25025 February 2019 Comment from Deborah A. Jones Regarding the Emergency Petition Filed by C-10 on February 13, 2019 ML19056A4602019-02-25025 February 2019 Comment from Lisa Conti Regarding the Emergency Petition Filed by C-10 on February 13, 2019 ML19050A2212019-02-19019 February 2019 NRR E-mail Capture - Seabrook Station, Unit No. 1 - Acceptance of Requested Licensing Action Relief Request Proposed Alternative 3IR-17 Implementation of an Extended Reactor Vessel Inservice Inspection Interval ML19050A3202019-02-13013 February 2019 Package from Stephen B. Comley, Sr. at February 13, 2019 Seabrook Station, Unit 1, Public Meeting 2023-06-22
[Table view] |
Text
August 19, 2016 ADAMS Accession No: ML16232A083 From: Bower, Fred Sent: Thursday, August 18, 2016 3:44 PM To: Deborah Grinnell; Debbie Grinnell (C-10) - debbie@c-10.org; Sandra Gavutis -
(Info@C-10.org); Sandra Gavutis Cc: Gray, Mel; Lorson, Raymond; Wittick, Brian; Buford, Angela; Cook, William; Cataldo, Paul; Scott, Michael; Pelton, David; Klukan, Brett; Poole, Justin; Bower, Fred; Barkley, Richard
Subject:
RE: My email in ML16180A212 is not complete, reqesting the NRC quote included
[2016-SST-0548]
[2016-SST-0548]
Ms. Grinnell, I am writing in response to your below email to me dated August 16, 2016. The email to me references an email that you previously sent to Mel Gray on Thursday June 23, 2016 (ML16180A212). Your June 23 email included a request for Mel Gray to forward the email to Raymond Lorson, Brian Wittick, Angela Buford, Bill Cook and Paul Cataldo. I informed you that I had forwarded your email as requested in my response email to you dated June 30, 2016 (ML16187A130).
The below August 16 email from you notes that during a subsequent review of ML16180A212, you recognized that the item (page 6, Item 4) you intended to quote from an NRC document (ML12054A730) was incomplete. You provided additional text and requested that I include the full quote in ML16180A212. As I have written to you previously, to be consistent with my understanding of agency policies, I timely place all incoming correspondence received from external stakeholders, such as yourself, which require a response from me, into ADAMS without alteration, as a public record. Consequently, I will not be editing or altering any of the correspondence that you send me, but I intend to consider all the correspondence that I receive from you before responding.
In my response letter to you dated August 18, 2016 (ML16231A134), I provided an enclosure that included responses to questions and concerns received from you in correspondence since June 2016. The first item in the enclosure restates our understanding of the issue you raised in ML16180A212 and provides a response. When we restated your issue, we quoted Item 4 (page 6) from ML12054A730, in its entirety as follows:
The AR1644074 Evaluation of the local section does not evaluate the effect of reduced modulus on stress and strain in the rebar. The strain in the rebar could go beyond the yield strain. From page 47 of Calc CE-4 referenced in the evaluation for element 255, the stress in the hoop reinforcement is 61.493 ksi, which is already beyond yield.
Raymond Lorson, Brian Wittick, Angela Buford, Bill Cook and Paul Cataldo were provided carbon copies of that letter and this email. I intend to have this email response placed into ADAMS as a public record.
The above referenced documents may be obtained online in the NRCs Agencywide Documents Access and Management System (ADAMS) public documents collection 1
at: http://www.nrc.gov/reading-rm/adams.html. Using the ADAMS Accession Number (ML#), you may begin a search for these documents by selecting ADAMS Public Documents and then select Begin Web-based ADAMS Search. For problems with ADAMS, please contact the NRCs Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or by e-mail to pdr.resource@nrc.gov.
I trust that this is responsive to the concerns you have raised.
Sincerely, Fred Bower USNRC Region I Branch Chief with Oversight Responsibility for Salem, Hope Creek and Seabrook l 2100 Renaissance Boulevard, STE 100, King of Prussia, PA 19406 l l: (610) 337-5200 l
[2016-SST-0548]
From: Deborah Grinnell [1]
Sent: Tuesday, August 16, 2016 5:36 PM To: Bower, Fred <Fred.Bower@nrc.gov>
Cc: Gray, Mel <Mel.Gray@nrc.gov>
Subject:
[External_Sender] My email in ML16180A212 is not complete, reqesting the NRC quote included Hello Fred, I read ML16180A212 which was an email I sent to to NRC Mel Gray on Thursday June 23, 2016 @
11:29AM.
In my last sentence in the third paragraph that started as I have an email from NRC R Nelson abut the concern that Seabrooks containment (CEB) was beyond yield, there is a quote from the NRC document that is not included in my email in ML16180A212.
Missing in the NRC document in #4. I believe I sent it in the email to Mel Gray, it states The AR1644074 Evaluation of the local section does not evaluate the effect of reduced modulus on stress and strain in the rebar.
The strain in the rebar could go beyond the yield strain. From page 47 of Calc CE 4 referenced in the evaluation for element 255, the stress in the hoop reinforcement is 61,493 ksi, which is already beyond yield .
I sent the email to Mel Gray and asked Mel Gray to send my email to NRC Raymond Lorson, Fred Bower, Brian Wittick, Angelo Buford, Bill Cook, and Paul Cataldo and as I agreed to quote the NRC documentation at the close of the public meeting.
The quote in bold above should be included in the ML16180A212. Would you include the quote to the ML16180A212 and send the correction to the NRC staff above? Please let me know when t is done.
Thank you, Fred, 2
Debbie 3