ML16231A043
Text
McGuire Nuclear Station UFSAR Chapter 16 (09 OCT 2015) 16 - 1 Table of Contents 16.0 Selected Licensee Commitments 16.1 Introduction 16.2 Relation To Technical Specifications
McGuire Nuclear Station UFSAR Chapter 16 (09 OCT 2015) 16.0 - 1 16.0 Selected Licensee Commitments THIS IS THE LAST PAGE OF THE TEXT SECTION 16.0.
UFSAR Chapter 16 McGuire Nuclear Station 16.0 - 2 (09 OCT 2015)
THIS PAGE LEFT BLANK INTENTIONALLY.
McGuire Nuclear Station UFSAR Chapter 16 (09 OCT 2015) 16.1 - 1 16.1 Introduction The McGuire Nuclear Station selected licensee commitment program provides a single location where certain selected operational related commitments are controlled. While this program constitutes Chapter 16 of the McGuire FSAR, the contents of the program are maintained in a separate manual. This manual, The McGuire Nuclear Station Selected Licensee Commitments Manual, facilitates the administration of this program, including more timely revision and addition of important commitments and user convenience.
The McGuire Nuclear Station Selected Licensee Commitments Manual contains commitments to control important plant equipment and operating conditions not controlled elsewhere. Issuance of the manual, as well as subsequent revisions, are done under the approval of the Station Manager.
THIS IS THE LAST PAGE OF THE TEXT SECTION 16.1.
UFSAR Chapter 16 McGuire Nuclear Station 16.1 - 2 (09 OCT 2015)
THIS PAGE LEFT BLANK INTENTIONALLY.
McGuire Nuclear Station UFSAR Chapter 16 (09 OCT 2015) 16.2 - 1 16.2 Relation To Technical Specifications The McGuire Nuclear Station Selected Licensee Commitments Manual contains a listing of selected commitments for which McGuire Technical Specification 5.4 (Procedures) requires written procedures to be established, implemented, and maintained.
THIS IS THE LAST PAGE OF THE TEXT SECTION 16.2.
UFSAR Chapter 16 McGuire Nuclear Station 16.2 - 2 (09 OCT 2015)
THIS PAGE LEFT BLANK INTENTIONALLY.