V~p REG& I~
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 7, 1997 LICENSEE:
Duke Power Company FACILITIES:
Oconee Nuclear Station, Units 1, 2, and 3 McGuire Nuclear Station, Units 1 and 2 Catawba Nuclear Station, Units 1 and 2
SUBJECT:
SUMMARY
OF MEETING WITH DUKE POWER COMPANY ON SECURITY PLAN CHANGES THAT ARE APPLICABLE TO DUKE POWER COMPANY NUCLEAR SITES A meeting with representatives of Duke Power Company (DPC, the licensee) was held on February 7, 1997, to discuss DPC's security plan changes that are applicable to its three nuclear sites (McGuire, Catawba, and Oconee). Meeting attendees are included in Enclosure 1. A copy of the meeting agenda is included as Enclosure 2, and Enclosure 3 is a copy of the handout provided during the meeting.
DPC noted that the current security computer and access control system is in need of an upgrade. The system, which is outdated compared to today's standlrd, was installed in the 1970's. The access system is a one of a kind proprietary system and parts are no longer available for the system.
The upgraded system will include emergency planning cardreaders inside the protective area, cardreaders for vital area access, and biometric and cardreaders at the Personel Access Portal.
Some of the existing equipment will continue to be used such as closed circuit TV monitoring and microwave Jetection.
The targeted in-service dates for the three sites are November 1997, April 998, and July 1998, for Catawba, McGuire, and Oconee, respectively.
It was noted that by letter dated August 23, 1996, the licensee submitted a request for exemption (to allow the use of a hand geometry biometrics system to control unescorted access into the protected areas of the Oconee, McGuire and Catawba nuclear plants) in accordance with the provisions of 10 CFR 73.5.
The staff indicated that it was in a position to grant.the request for the exemption. However, the detail of the plans to be implemented were incorporated in Revision 5 to the DPC Security and Contingency Plan that was NBC F ECNECOPY 9703120434 970307 PDR ADOCK 05000269 F
-2 submitted by letter dated August 23, 1996, which included a number of other security plan changes. The staff indicated that the Security and Contingency Plan change that the staff needs to review should have the details of the plans strictly associated with the exemption. The licensee stated that they would withdraw Revision 5 and resubmit another revision that strictly addresses the exemption.
Victor Nerses, Senior Project Manager Project Directorate 11-2 Division of Reactor Projects -
I/II Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270, 50-287, 50-369, 50-370, 50-413, and 50-414
Enclosures:
As stated (3) cc w/encls:
See next page March 7, 1997 submitted by letter dated August 23, 1996, which included a number of other security plan changes. The staff indicated that the Security and Contingency Plan change that the staff needs to review should have the details of the plans strictly associated with the exemption. The licensee stated that they would withdraw Revision 5 and resubmit another revision that strictly addresses the exemption.
ORIGINAL SIGNED BY:
Victor Nerses, Senior Project Manager Project Directorate II-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270; 50-287, 50-369, 50-370, 50-413, and 50-414
Enclosures:
As stated (3) cc w/encls: See next page Distribution w/enclosures 1. 2. 3:
Distribution w/enclosure 1 only HARD COPY E-MAIL-v Docket File
-SCollins/FMiraglia DLaBarge PUBLIC RZimmerman PTam PD 11-2 Rdg.
RCrlenjak, RH ACRS HBerkow PFrederickson VNerses SKirslis BManili JJohnson,,RII GTracy, RH To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "IE"
= Copy with attachment/enclosure "N" = No copy OFFICE PM:PDII-2 1
LA:PDII 2 S:PSGB D: MDI 2 NAME Wd Siln LBERRY BMANILI IHRERK '.,/
DATE 1 /
/97
/
7
,/
/97 1 /97
/
/97
/ /97 DOCUMENT NAME: G:\\MCGUIRE\\0207.MTS OFFICIAL RECORD COPY
Duke Power Company Catawba Nuc Station McGuire Nuc*W Station Oconee Nuclear Station cc:
Dr. John M. Barry Mr. Ed Burchfield Mecklenburg County Compliance Department of Environmental Duke Power Company Protection Oconee Nuclear Site 700 N Tryon Street P. 0. Box 1439 Charlotte, North Carolina 29202 Seneca, South Carolina 29679 County Manager of Mecklenburg County Mr. Robert B. Borsum 720 East Fourth Street Framatome Technologies Charlotte, North Carolina 28202 Suite 525 1700 Rockville Pike Mr. J. E. Snyder Rockville, Maryland 20852 Regulatory Compliance Manager Duke Power Company Manager, LS McGuire Nuclear Site NUS Corporation 12700 Hagers Ferry Road 2650 McCormick Drive, 3rd Floor Huntersville, North Carolina 28078 Clearwater, Flordia 34619-1035 Senior Resident Inspector Senior Resident Inspector c/o U.S. Nuclear Regulatory U.S. Nuclear Regulatory Commission Commission Route 2, Box 610 12700 Hagers Ferry Road Seneca, South Carolina 29678 Huntersville, North Carolina 28078 Mr. David L. Rehn Mr. Dayne H. Brown, Director Vice President, Catawba Site Department of Environmental Duke Power Company Health and Natural Resources 4800 Concord Road Division of Radiation Protection York, South Carolina 29745 P. 0. Box 27687 Raleigh, North Carolina 27611 Mr. H. B. Barron Vice President, McGuire Site County Supervisor of Oconee County Duke Power Company Walhalla, South Carolina 27621 12700 Hagers Ferry Road Huntersville, North Carolina 28078 Mr. J. W. Hampton Vice President, Oconee Site Elaine Wathen, Lead REP Planner Duke Power Company Division of Emergency Management P. 0. Box 1439 116 West Jones Street Seneca, South Carolina 29679 Raleigh, North Carolina 27603-1335
Duke Power Company Catawba Nuclear Station McGuire Nuclear Station Oconee Nuclear Station cc:
Mr. M. S. Kitlan Regulatory Compliance Manager North Carolina Electric Membership Duke Power Company Corporation 4800 Concord Road P. 0. Box 27306 York, South Carolina 29745 Raleigh, North Carolina 27611 Mr. Paul R. Newton Saluda River Electric Cooperative, Duke Power Company, PB05E Inc.
422 South Church Street P. 0. Box 929 Charlotte, North Carolina 28242 Laurens, South Carolina 29360 J. Michael McGarry, III, Esquire Senior Resident Inspector Winston and Strawn Route 2, Box 179N 1400 L Street, NW.
York, South Carolina 29745 Washington, DC 20005 Regional Administrator, Region II North Carolina Municipal Power U.S. Nuclear Regulatory Commission Agency Number 1 101 Marietta Street, NW Suite 2900 1427 Meadowwood Boulevard Atlanta, Georgia 30323 P. 0. Box 29513 Raleigh, North Carolina 27626 Max Batavia, Chief Bureau of Radiological Health Mr. T. Richard Puryear South Carolina Department of Health Owner's Group (NCEMC) and Environmental Control Duke Power Company 2600 Bull Street 4800 Concord Road Columbia, South Carolina 29201 York, South Carolina 29745 Ms. Karen E. Long County Manager of York County Assistant Attorney General York County Courthouse North Carolina Department of Justice York, South Carolina 29745 P. 0. Box 629 Raleigh, North Carolina 27602 Richard P. Wilson, Esquire Assistant Attorney General Mr. G. A. Copp S.C. Attorney General's Office Licensing -
ECO50 P. 0. Box 11549 Duke Power Company Columbia, South Carolina 29211 526 South Church Street Charlotte, North Carolina 28242-0001 Piedmont Municipal Power Agency 121 Village Drive Greer, South Carolina 29651
ATTENDEE LIST FEBRUARY 7. 1997, MEETING WITH DUKE POWER COMPANY AND NRC PRESENTATION OF THE MCGUIRE, CATAWBA, OCONEE NUCLEAR STATIONS SECURITY PLAN CHANGES NAME ORGANIZATION Victor Nerses NRC/NRR/McGuire PM Paul E. Frederickson NRC/RII/BRCH, Spec. Insp. Branch Barry Manili NRC/NRR/Safeguards Branch Peter S. Tam NRC/NRR/PD 11-2 Stan Kirslis NRC/NRR/PD 11-2 Terry Godfrey Duke Power/Nuclear General Office Skip Copp Duke Power/Nuclear Generation Bill Taylor Duke Power/Electric System Support/
Project Manager Dana Boies Duke Power/Electric System Support/
Project Technical Manager ENCLOSURE 1
AM 1
UNITED STATES 0
MWLEAR REGULATORY COMMIS N
V WASHINGTON, D.C. 2664001 V
January 27, 1997 MEMORANDUM TO: Herbert N. Berkow, Director Project Directorate 11-2 Division of Reactor Projects - I/II FRI )
L cAor Nerses, Senior Project Manager Project Directorate 11-2 Division of Reactor Projects -
I/II
SUBJECT:
MEETING WITH DUKE POWER COMPANY ON CHANGES TO THE SECURITY PLAN FOR ITS NUCLEAR PLANT SITES DATE & TIME:
Friday, February 7, 1997 10:00 a.m.
LOCATION:
U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Conference Room 0-10-B-11 Rockville, Maryland 20852 PURPOSE:
To review security access control system modifications to be installed at the Duke Power's nuclear plant sites.
PARTICIPANTS*:
M DUKE POWER B. Manili, NRR S. Copp, et al.
S. Kirslis, NRR V. Nerses, et al.
Docket Nos. 50-269, 50-270, 50-287, 50-369, 50-370, 50-413, 50-414 cc: See next page CONTACT: Victor Nerses, NRR 415-1484
- Meetings between NRC Technical staff and applicants or licensees are usually open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy," 59 Federal Reaister 48344, 9/20/94. However, Safeguards Information will be discussed at this meeting, therefore, the meeting will not be open to the public. A non-proprietary summary of the meeting will be prepared and will be available upon request.
ENCLOSURE 2
AGENDA
- 1)
Security System Overview Digital system vs current analog system Use of mag stripe cards with Hand Geometry Unit Line supervision improvements Other features
- 2) Now Video Badge Network LAN system connecting all sites and General Office Data security (encryption, etc)
Capability to badge for any site from any other site Interface with NEI PADS Authentication and login requirements
- 3)
Schedule for implementation Video Badge Network Site implementation Transition Plan Exemption to allow badges to be taken offsite NRC Review/Expectations
- 4)
Security Plan Revisions
Security Computer/Access Control Project Duke Power Company February 7, 1997 S
ENCLOSURE 3
DUKE POWER COMPANY SECURITY COMPUTER/ACCESS CONTROL PROJECT BLOCK DIAGRAM f EmegnyPaig Central (CAS)
ControlaerrPlaningPA)
Alarm Station IMhes.
Staion~--Controller Reader VideoCCTV Existing Seconda LJthe Equipment Secon a(SAS)
Alar iometric & Card StationReader Security Computer Microwave Emergency Planning Workstations Detector Site Assembly Existingg nEquipment En~ptionCentral Alarm Site _ tixoc CatwbaStation (CAS)
Duke Networ Contain:
DB2mpputye E
c Secondary Alarm Corporate IStation (SAS)
Mainframe Catawba PAPVRue Ooe Biometric EquipmentEnrclR Badging Server (Located At MNS)
U e o ote}* -+Ko~
En tption Contains: DB32 Employee tamVi Icrmaione Workstation NRCSUa GRF, REV 0 1/31197
PAP Design Features Motion sensors with audible alarming capability.
Stepback line to control flow.
CCTV monitoring for SAS ACS function.
HGU & mag stripe card reader.
Audible intercom capability in PAP
01 Protected Area Access Portal Entrance Turnstiles (4)
Foyer
$16 UfBadge Read Detectors (4)
U Fx 2
-- Metal Detectort (2)
X-Ray Drop-Off X-Ray Pick-up
PA BOUNDARY DOOR & TURNSTILES ACS CCTV NOTE: CCTV cameras are to be field located to determine best viewing position.
LIEPC HGU, CARD READER,
& INTERCOM DUAL HEAD DUAL DETECTORS TYPICAL PAP ARRANGEMENT FOR CATAWBA AND OCONEE
PA BOUNDARY DOOR & TURNSTILES ACS
& SAS STEP-BACK LINE HGU, CARD READER,
& INTERCOM TYPICAL PAP ARRANGEMENT FOR McGUIRE
VIDEO BADGE NETWORK Note: Firewalls, Servers, Hosts, and Backbones are Redundant LII VBN WorkStation General Office FA VBN m
WorkStation (4)
-g BCNR.
Oconee Dk Intranet (Same as Catawba)
IEB~an Bakoe ar Redundant~cCG iM VBNV WorkStWtion (r2)
Fir TunnTunnel ServeServer l~orporaFirewalll
Video Badge Network Workstation Features Authorized User ID and Password Magnetic Card Reader Hand Geometry Verification Communication Features
>Multiple Router and Firewall Filters Tunnel Servers Encryption and Digital Signatures
SCAC Project - SCHEDULE
> 3/97 VBN Factory Test
> 4/97 Install VBN
> 6/97 Make Badges (All locations)
> 8/97 Install CNS PSCS
> 11/97 Catawba In-Service
> 4/98 McGuire In-Service
> 7/98 Oconee In-Service
SCAC Project Transition Plan + Detail (Safeguards) 0 t
Installation
- New In
- Old Out
- Uninterrupted Operations Operation
CAC Project THANKS!!