ML16180A173

From kanterella
Jump to navigation Jump to search
6 to the Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations, Figure 13.1-1, Site Vice President
ML16180A173
Person / Time
Site: Ginna Constellation icon.png
Issue date: 05/05/2016
From:
Exelon Generation Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16180A174 List:
References
Download: ML16180A173 (9)


Text

GINNA/UFSAR CHAPTER 13 CONDUCT OF OPERATIONS Revision 26 5/2016 Figure 13.1-1 Site Vice President

Revision 26 5/2016 GINNA/UFSAR CHAPTER 13 CONDUCT OF OPERATIONS Figure 13.1-2 Plant Manager

Revision 26 5/2016 GINNA/UFSAR CHAPTER 13 CONDUCT OF OPERATIONS Figure 13.1-3 Ginna Engineering

Revision 26 5/2016 GINNA/UFSAR CHAPTER 13 CONDUCT OF OPERATIONS Figure 13.1-4 Ginna Integrated Work Management

Revision 26 5/2016 GINNA/UFSAR CHAPTER 13 CONDUCT OF OPERATIONS Figure 13.1-5 Nuclear Training

Revision 26 5/2016 GINNA/UFSAR CHAPTER 13 CONDUCT OF OPERATIONS Figure 13.1-6 Ginna Operations

Revision 26 5/2016 GINNA/UFSAR CHAPTER 13 CONDUCT OF OPERATIONS Figure 13.1-7 Ginna Radiation Protection

Revision 26 5/2016 GINNA/UFSAR CHAPTER 13 CONDUCT OF OPERATIONS Figure 13.1-8 Chemistry

Revision 26 5/2016 GINNA/UFSAR CHAPTER 13 CONDUCT OF OPERATIONS Figure 13.1-9 Ginna Maintenance