MONTHYEARML16007A1802016-01-20020 January 2016 Regulatory Audit Report Regarding License Amendment Request to Adopt Technical Specifications Task Force-490, Rev.0, and Implement Alternative Source Term Project stage: Other ML16169A1182016-03-31031 March 2016 RWA-1313-015, Rev. 1, AST Radiological Analysis Technical Report. Project stage: Request ML16166A1272016-06-14014 June 2016 NRR E-mail Capture - D.C. Cook Units 1 and 2 - Arcb RAI Concerning LAR to Adopt TSTF-490 and Implement FULL-SCOPE AST (CAC Nos. MF5184 and MF5185) Project stage: RAI AEP-NRC-2016-56, Response to Seventh Request for Additional Information Regarding the License Amendment Request to Adopt TSTF-490 and Implement Alternative Source Term2016-07-12012 July 2016 Response to Seventh Request for Additional Information Regarding the License Amendment Request to Adopt TSTF-490 and Implement Alternative Source Term Project stage: Request ML16203A2682016-07-25025 July 2016 Regulatory Audit Report Regarding License Amendment Request to Adopt Technical Specifications Task Force-490, Rev.0, and Implement Alternative Source Term (CAC Nos. MF5184 and MF5185) Project stage: Other AEP-NRC-2016-78, Unit 2 - Supplement to the License Amendment Request to Adopt TSTF-490, Revision 0, Deletion of E Bar Definition and Revision to Reactor Coolant System Specific Activity Technical Specification and ..2016-09-15015 September 2016 Unit 2 - Supplement to the License Amendment Request to Adopt TSTF-490, Revision 0, Deletion of E Bar Definition and Revision to Reactor Coolant System Specific Activity Technical Specification and .. Project stage: Supplement ML16242A1112016-10-20020 October 2016 DC Cook, Units 1 and 2 - Issuance of Amendments Adoption of TSTF-490,REV.0,Deletion of E-Bar Definition and Revision to Reactor Coolant System Specific Activity Technical Specification and Implementation of Full-Scope Alternative Source Ter Project stage: Approval ML16327A1102016-12-28028 December 2016 Cover Letter for Revised Safety Evaluation for Amendment Nos. 332 and 314 Adoption of TSTF-490, Rev. 0, and Implementation of Full-Scope Alternative Source Term Project stage: Approval 2016-03-31
[Table View] |
Similar Documents at Cook |
---|
Category:E-Mail
MONTHYEARML24221A4172024-08-0101 August 2024 DC Cook 2024 PI&R Inspection Request for Information ML24178A0432024-06-26026 June 2024 NRR E-mail Capture - Final RAI - D.C. Cook 1 & 2 - License Amendment Request Regarding Neutron Flux Instrumentation ML24156A0072024-05-30030 May 2024 NRR E-mail Capture - Final RAI - D.C. Cook Nuclear Plant, Unit Nos. 1 and 2 - License Amendment Request Regarding Reserve Feed Enclosure ML24156A0052024-05-22022 May 2024 NRR E-mail Capture - D.C. Cook Nuclear Plant, Unit Nos. 1 and 2 - Acceptance of License Amendment Request Regarding Reserve Feed Enclosure ML24103A1392024-04-12012 April 2024 NRR E-mail Capture - D.C. Cook Nuclear Plant, Unit Nos. 1 and 2 - Acceptance of License Amendment Request Regarding Adoption of 10 CFR 50.69 ML24096A1132024-04-0505 April 2024 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Delay in Issuance of License Amendment Regarding Neutron Flux Instrumentation ML24093A0582024-04-0202 April 2024 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 1 - Acceptance of License Amendment Request Regarding Technical Specification 3.4.12, Low Temperature Overpressure Protection (LTOP) System, ML23361A1022023-12-21021 December 2023 Security Rule Exemption Request - ISFSI Docket No. Reference ML23321A1222023-11-17017 November 2023 NRR E-mail Capture - Final RAI - D.C. Cook 1 & 2 - License Amendment Request Regarding Neutron Flux Instrumentation ML23052A1502023-02-21021 February 2023 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request Regarding Neutron Flux Instrumentation ML22307A2532022-11-0303 November 2022 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 2 - Verbal Authorization of Relief Request ISIR-5-06 Regarding Alternative to N-729-6 for RPV Head Visual Examination ML22122A0902022-04-29029 April 2022 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request to Revise Technical Specifications Consistent with TSTF-554, Revision 1 ML22250A6712022-02-16016 February 2022 Outline Submittal Notification Email DC-Cook 2022 ML21341A6252021-12-0707 December 2021 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request to Revise Technical Specifications Consistent with TSTF-577, Revision 1 ML21307A3352021-11-0303 November 2021 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Final RAI - License Amendment Request Regarding Containment Water Level Instrumentation ML21236A0262021-08-23023 August 2021 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 2 - Acceptance of License Amendment Regarding Changes to Reactor Vessel Heatup and Cooldown Curves and Low Temperature Overpressure Protection System Requirements ML21140A3052021-05-20020 May 2021 NRR E-mail Capture - Final RAI - D.C. Cook 1 & 2 - Relief Request ISIR-4-11, Impractical Examinations for the Fourth 10-Year ISI Interval ML21113A2812021-04-23023 April 2021 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request Regarding Containment Water Level Instrumentation ML21089A0222021-03-24024 March 2021 DC Cook Power Operated Valves (POV) Preliminary Request for Information ML21082A0262021-03-22022 March 2021 Acceptance of Relief Request ISIR-4-11, Impractical Examinations for the Fourth 10-Year ISI Interval ML21049A2682021-02-16016 February 2021 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 2 - Final RAI - License Amendment Request for One-Time Extension Containment Type a ILRT ML21026A3472021-01-26026 January 2021 NRR E-mail Capture - Final RAI - D.C. Cook 1 & 2 - Relief Request REL-PP2 for Pump and Valve IST Fifth 10-year Interval ML21008A4742021-01-0808 January 2021 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 2 - Acceptance of License Amendment Request for One-Time Extension Containment Type a ILRT ML20366A1012020-12-31031 December 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 2 - Acceptance of License Amendment Request for One-Time Deferral of Steam Generator Inspection ML20316A0152020-11-0606 November 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of Relief Request REL-PP2 for Pump and Valve IST Fifth 10-year Interval ML20318A0202020-10-16016 October 2020 NRR E-mail Capture - Regarding Public Comment on D.C. Cook, Unit 1 Request for Relief from Nozzle Inspections, Code Case N-729 ML20289A7122020-10-15015 October 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 1 - Verbal Authorization of Relief Request ISIR-5-04 Regarding Alternative to N-729-6 for RPV Head Visual Examination ML20290A4252020-10-15015 October 2020 Verbal Authorization of Relief Request ISIR-5-04 Regarding Alternative to N-729-6 for RPV Head Visual Examination ML20318A0192020-10-15015 October 2020 NRR E-mail Capture - (External_Sender) Supplemental Public Comment on D.C. Cook, Unit 1 Request for Relief from Nozzle Inspections, Code Case N-729 ML20289A1192020-10-0909 October 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of Relief Request for Alternative to N-729-4 for RPV Head Visual Examination ML20318A0182020-10-0909 October 2020 NRR E-mail Capture - (External_Sender) Public Comment on D.C. Cook, Unit 1 Request for Relief from Nozzle Inspections, Code Case N-729 ML20181A4122020-06-29029 June 2020 NRR E-mail Capture - Final RAI - D.C. Cook 1 - One-Time Extension, Containment Type a ILRT Frequency ML20149K6272020-05-28028 May 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment and Exemptions Regarding UFSAR 10 CFR 50.71(e)(4) Update Schedule (Epids: L-2020-LLA-0100, L-2020-LLE-0052, L-2020-LLE-0053) ML20149K4332020-05-26026 May 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request to Revise Technical Specifications Consistent with TSTF-567, Revision 1 ML20141L6062020-05-20020 May 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request to Revise Technical Specifications Consistent with TSTF-541, Revision 2 ML20141L8112020-05-20020 May 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of Relief Request Regarding Impracticality for Inservice Inspection for Certain Welds ML20136A5162020-05-15015 May 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request to Revise Technical Specifications Consistent with TSTF-412, Revision 3 ML20133J9662020-05-11011 May 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 1 - Acceptance of License Amendment Regarding Changes to Reactor Vessel Heatup and Cooldown Curves and Low Temperature Overpressure Protection System Requirements ML20232B4562020-04-27027 April 2020 Request for Supporting Information for the D.C. Cook SPRA Audit Review - Fragility Questions ML20232B4432020-03-25025 March 2020 Request for Supporting Information for the D.C. Cook SPRA Audit Review - Plant Response Model Questions ML19345F9382019-12-0909 December 2019 D.C. Cook 50.54(f) SPRA Submittal - Completeness Review Done and Path Forward ML19333B8042019-11-29029 November 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance Review for LAR to Adopt TSTF-569 (L-2019-LLA-0248) ML19309F9212019-11-0505 November 2019 Request for Eportal Access for Audit Review of the DC Cook SPRA Supporting Documents ML19270E7372019-09-26026 September 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance Review for LAR to Adopt TSTF-421, Reactor Coolant Pump Flywheel Inspection Program ML19207A4642019-07-26026 July 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance Review for LAR to Delete Diesel Generator Load Test Resistor Banks ML19204A0962019-07-23023 July 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Request for Additional Information Related to Unit 2 Leak Before Break Analysis and Deletion of Containment Humidity Monitors for Unit Nos. 1 and 2 ML19211C3032019-07-0303 July 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 & 2 - Request for Additional Information Related to LAR to Address NSAL-15-1 ML19175A3032019-06-24024 June 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 2 - Acceptance Review for LAR to Revise Battery Monitoring and Maintenance TS ML19092A4802019-04-0202 April 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance Review for LAR to Adopt TSTF-563 ML19092A4792019-04-0202 April 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance Review for LAR to Address Issues Identified in Westinghouse Document NSAL-15-1 2024-08-01
[Table view] |
Text
NRR-PMDAPEm Resource From: Dietrich, Allison Sent: Tuesday, June 14, 2016 9:04 AM To: hlkish@aep.com Cc: Terry L Curtiss (tlcurtiss@aep.com); Dickson, Elijah; Shoop, Undine; Wrona, David
Subject:
D.C. COOK UNITS 1 AND 2 - ARCB RAI CONCERNING LAR TO ADOPT TSTF-490 AND IMPLEMENT FULL-SCOPE AST (CAC NOS. MF5184 AND MF5185)
Attachments: ARCB RAI 10 REGARDING AST MF5184 MF5185.pdf By letter dated November 14, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14324A209), as supplemented by letter dated February 12, 2015 (ADAMS Accession No. ML15050A247), Indiana Michigan Power Company (I&M) submitted a license amendment request for the Donald C. Cook Nuclear Plant, Units 1 and 2. The proposed amendment consists of adoption of Technical Specifications Task Force (TSTF)-490, Revision 0, and implementation of a full scope alternate source term radiological analysis methodology.
The U.S. Nuclear Regulatory Commission (NRC) staff in the Radiation Protection and Consequence Branch of the Office of Nuclear Reactor Regulation has reviewed your submittal, as supplemented. The staff has determined that additional information is needed in order to complete the review, as described in the attached request for additional information (RAI). The draft RAI was sent to I&M via electronic mail on May 26, 2016. Clarification telephone conferences were held on June 6, 2016 and June 13, 2016. Please provide your response by July 13, 2016.
Please let me know if you have any questions or concerns.
Sincerely, Allison W. Dietrich, Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 301-415-2846 1
Hearing Identifier: NRR_PMDA Email Number: 2898 Mail Envelope Properties (71d7dcf0b47f4487ab9dc06fb8177016)
Subject:
D.C. COOK UNITS 1 AND 2 - ARCB RAI CONCERNING LAR TO ADOPT TSTF-490 AND IMPLEMENT FULL-SCOPE AST (CAC NOS. MF5184 AND MF5185)
Sent Date: 6/14/2016 9:04:14 AM Received Date: 6/14/2016 9:04:14 AM From: Dietrich, Allison Created By: Allison.Dietrich@nrc.gov Recipients:
"Terry L Curtiss (tlcurtiss@aep.com)" <tlcurtiss@aep.com>
Tracking Status: None "Dickson, Elijah" <Elijah.Dickson@nrc.gov>
Tracking Status: None "Shoop, Undine" <Undine.Shoop@nrc.gov>
Tracking Status: None "Wrona, David" <David.Wrona@nrc.gov>
Tracking Status: None "hlkish@aep.com" <hlkish@aep.com>
Tracking Status: None Post Office: HQPWMSMRS03.nrc.gov Files Size Date & Time MESSAGE 1338 6/14/2016 9:04:14 AM ARCB RAI 10 REGARDING AST MF5184 MF5185.pdf 82358 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received:
REQUEST FOR ADDITIONAL INFORMATION REGARDING ADOPTION OF TSTF-490, REVISION 0 AND IMPLEMENTATION OF FULL-SCOPE ALTERNATE SOURCE TERM DONALD C. COOK NUCLEAR PLANT, UNITS 1 AND 2 DOCKET NOS. 50-315 AND 50-316 CAC NOS. MF5184 AND MF5185 RAI-ARCB-10 The proposed change to the Donald C. Cook Nuclear Plant (CNP), Units 1 and 2, technical specification (TS) 3.4.16, in part, modifies Condition B to provide a Condition and Required Action for dose equivalent Xe-133 instead of gross specific activity. In the current TS 3.4.16, Condition A specifies that when dose equivalent I-131 is greater than 1.0 microcuries per gram (Cigm), the required action is to restore dose equivalent I-131 to within limit, with a Completion Time of 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />. During this Condition, Limiting Condition for Operation (LCO) 3.0.4.c is applicable. If the dose equivalent I-131 is not restored within limit in 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />, the required action is to be in Mode 3 with average reactor coolant temperature (Tavg) less than 500 °F within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
For the modified Condition B, the licensee proposes a Completion Time of 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> to restore dose equivalent Xe-133 within limits. A Note is also added allowing the applicability of LCO 3.0.4.c.
Technical Specification Task Force (TSTF)-490, Revision 0, provided the following justification for this change:
The Completion Time for revised TS 3.4.16 Required Action B.1 will require restoration of Dose Equivalent Xe-133 to within limit in 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />. This is consistent with the Completion Time for current Required Action A.2 for Dose Equivalent I-131. The Completion Time of 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> for revised Required Action B.1 is acceptable since it is expected that, if there were a noble gas spike, the normal coolant noble gas concentration would be restored within this time period. Also, there is a low probability of an accident occurring during this time period.
While it is a correct statement that the proposed change makes the Completion Times of TS 3.4.16 Required Action A.2 and B.1 in NUREG-1431, Standard Technical Specifications Westinghouse Plants, consistent, it is not clear why the Completion Times should be consistent. The plant Conditions for these Required Actions are different.
The CNP TS 3.4.16 Required Action A.2 is required when the plant is in a condition analyzed in the design basis accident analyses (reactor coolant dose equivalent I-131 is bound between 1 and 60 Cigm). The new proposed TS 3.4.16 Required Action B.1 is required when the plant is in a condition not analyzed in the design basis accident analyses (dose equivalent Xe-133 is greater than 215.1 Cigm).
Typically, the Required Action for a condition not analyzed requires the plant to take immediate actions to begin shutdown of the plant. The proposed change does not require immediate actions to begin shutdown of the plant, but allows 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> before the plant is required to begin shutting down.
x Provide justification for the proposed Completion Time of 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> for TS 3.4.16 Condition B, to include why it is acceptable to be in an unanalyzed condition for 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> when the reactor coolant dose equivalent Xe-133 is greater than 215.1 Cigm without an upper bound.