Forwards IE Bulletin 80-19, Failures of Mercury-Wetted Matrix Relays in Reactor Protective Sys of Operating Nuclear Power Plants Designed by Combustion Engineering. Action Required by Facilities W/Ols or CPs
ML16161B196
Person / Time
Site: Oconee, Mcguire, Catawba, McGuire  Duke Energy icon.png
Issue date: 07/31/1980
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
References
NUDOCS 8008180102
Download: ML16161B196 (1)


Text

a UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 101 MARIETTA ST., N.W., SUITE 3100 ATLANTA, GEORGIA 30303 JUL 3 1 1980

.In Reply Refer To:

RII:JPO 50-369, 50-370 50-414 Duke Power Company ATTN:

W. 0. Parker, Jr.

Vice President, Steam Production P. 0. Box 2178 Charlotte, NC 28242 Gentlemen:

Enclosed is IE Bulletin No. 80-19 which requires action by you with respect to your nuclear power facility(ies).

In order to assist the NRC in evaluating the value/impact of each Bulletin on licensees, it would be helpful if you would provide an estimate of the manpower expended in conduct of the review and preparation of the report(s) required by the Bulletin.

Please estimate separately the manpower associated with corrective actions necessary following identification of problems through the Bulletin.

Should you have any questions regarding this Bulletin or the actions required by you, please contact this office.

Sincerely, James P. O'Reilly Director

Enclosures:

1.

IE Bulletin No. 80-19

2.

List of Recently Issued IE Bulletins cc w/encl:

M. D. McIntosh, Plant Manager J. C. Rogers, Project Manager J. E. Smith, Station Manager D. G. Beam, Project Manager J. W. Hampton, Station Manager F300 18,o1 02