ML16161B075

From kanterella
Jump to navigation Jump to search
Forwards IE Bulletin 79-02,Revision 2, Pipe Support Base Plate Designs Using Concrete Expansion Anchor Bolts. Action Required
ML16161B075
Person / Time
Site: Oconee, Mcguire, Catawba, McGuire  
Issue date: 11/08/1979
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
References
NUDOCS 7911260117
Download: ML16161B075 (2)


Text

Reply ReferGTo:

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 101 MARIETTA ST., N.W., SUITE 3100 ATLANTA, GEORGIA 30303 In Reply Refer To:

NOV 8 1979 RII:JPO 50-269 50-41 Duke Power Company Attn:

W. 0. Parker, Jr.

Vice President, Steam Production P. 0. Box 2178 Charlotte, North Carolina 28242 Gentlemen:

Enclosed is IE Bulletin No. 79-02, Revision No. 2 which requires action by you with regard to your power reactor facility(ies) with an operating license or a construction permit.

Should you have any questions regarding this Bulletin Revision or the actions required by you, please contact this office.

Sincerely, James-P. O'Reilly Director

Enclosure:

IE Bulletin No. 79-02, Revision No. 2 w/encls.

7911260

NOV 8 1979 Duke Power Company

-2 cc w/encl:

D. G. Beam, Project Manager Post Office Box 223 Clover, South Carolina 29710 M. D. McIntosh, Plant Manager Post Office Box 488 Cornelius, North Carolina 28031 J. C. Rogers, Project Manager Post Office Box 33189 Charlotte, North Carolina 28242 J. E. Smith, Station Manager Post Office Box 1175 Seneca, South Carolina 29678