ML16161A294

From kanterella
Jump to navigation Jump to search
Amends 231,231 & 228 to Licenses DPR-38,DPR-47 & DPR-55, Respectively,Revising TS 4.5.4.1.b.1 for Testing Prvs Air by Adding Ref to Following Statement Added to Bottom of TS Page,As Listed
ML16161A294
Person / Time
Site: Oconee  
(DPR-38-A-231, DPR-47-A-231, DPR-55-A-228)
Issue date: 08/07/1998
From: Berkow H
NRC (Affiliation Not Assigned)
To:
Shared Package
ML16161A297 List:
References
NUDOCS 9808120084
Download: ML16161A294 (8)


Text

A0 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20556-001 DUKE ENERGY CORPORATION DOCKET NO. 50-269 OCONEE NUCLEAR STATION. UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 231 License No. DPR-38

1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment to the Oconee Nuclear Station, Unit 1 (the facility)

Facility Operating License No. DPR-38 filed by the Duke Energy Corporation (the licensee) dated July 8, 1998, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations as set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is hereby amended by page changes to the Technical Specifications as indicated in the attachment to this license amendment, and Paragraph 3.B of Facility Operating License No. DPR-38 is hereby amended to read as follows:

PDR ADOCK 05000269 P

PDR J

-2 B. Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.

231, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Herbert N. Berkow, Director Project Directorate 11-2 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation

Attachment:

Technical Specification Changes Date of Issuance:

August 7, 1998

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 DUKE ENERGY CORPORATION DOCKET NO. 50-270 OCONEE NUCLEAR STATION, UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 231 License No. DPR-47 The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment to the Oconee Nuclear Station, Unit 2 (the facility)

Facility Operating License No. DPR-47 filed by the Duke Energy Corporation (the licensee) dated July 8, 1998, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations as set forth in 10 CFR Chapter 1; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is hereby amended by page changes to the Technical Specifications as indicated in the attachment to this license amendment, and Paragraph 3.B of Facility Operating License No. DPR-47 is hereby amended to read as follows:

-2 B. Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 231, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Herbert N. Berkow, Director Project Directorate 11-2 Division of Reactor Projects - 1/il Office of Nuclear Reactor Regulation

Attachment:

Technical Specification Changes Date of Issuance:

August 7, 1998

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 DUKE ENERGY CORPORATION DOCKET NO. 50-287 OCONEE NUCLEAR STATION, UNIT 3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 228 License No. DPR-55

1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment to the Oconee Nuclear Station, Unit 3 (the facility)

Facility Operating License No. DPR-55 filed by the Duke Energy Corporation (the licensee) dated July 8, 1998, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the.Act), and the Commission's rules and regulations as set forth in 10 CFR Chapter 1; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter 1; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is hereby amended by page changes to the Technical Specifications as indicated in the attachment to this license amendment, and Paragraph 3.B of Facility Operating License No. DPR-55 is hereby amended to read as follows:

-2 B. Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 228, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Herbert. Berkow, Director Project Directorate 11-2 Division of Reactor Projects - 1/l Office of Nuclear Reactor Regulation

Attachment:

Technical Specification Changes Date of Issuance: August 7, 1998

ATTACHMENT TO LICENSE AMENDMENT NO.

231 FACILITY OPERATING LICENSE NO. DPR-38 DOCKET NO. 50-269 AND TO LICENSE AMENDMENT NO. 231 FACILITY OPERATING LICENSE NO. DPR-47 DOCKET NO. 50-270 AND TO LICENSE AMENDMENT NO. 228 FACILITY OPERATING LICENSE NO. DPR-55 DOCKET NO. 50-287 Replace the following page of the Appendix "A" Technical Specifications with the enclosed page. The revised page is identified by Amendment number and contains vertical lines indicating the areas of change.

Remove Insert 4.5-7 4.5-7

4.5.4 Penetration Room Ventilation System Applicability Applies to testing of the Penetration Room Ventilation System Obiective To verify that the Penetration Room Ventilation System is operable.

Specification 4.5.4.1 Operational and Performance Testing

a.

Monthly, each train of the Penetration Room Ventilation System shall be operated for at least 15 minutes at design flow +/-10%.

b.

Every 18 months, it shall be demonstrated that:

I. The Penetration Room Ventilation System fans operate at design flow (a 10%) when tested in accordance with ANSI N510-1975. *

2.

The pressure drop across the combined HEPA filters and charcoal adsorber banks is less than six inches of water at the system design flow rate (+/- 10%).

3. Each branch of the Penetration Room Ventilation System is capable of automatic initiation.
4.

The bypass valve for filter cooling is manually operable.

c.

Leak tests using DOP or halogenated hydrocarbon, as appropriate shall be performed on the Penetration Room purge filters:

1. Every 18 months;
2. After each complete or partial replacement of a HEPA filter bank or charcoal adsorber bank;
3. After any structural maintenance on the system housing;
4. After painting, fire, or chemical release in any ventilation zone communicating with the system.
d. The results of the DOP and halogenated hydrocarbon tests on HEPA filters and charcoal adsorber banks shall show 299% DOP removal and 99% halogenated hydrocarbon removal, respectively, when tested in accordance with ANSI N510-1975.

A temporary noncompliance with this surveillance requirement is allowed until August 30, 1998, to complete necessary modifications to enable flow testing in accordance with ANSI N510-1975.

4.5-7 Amendment'No.

231 (Unit 1)

Amendment No.

231 (Unit 2)

Amendment No.

228 (Unit 3)