ML16161A289
| ML16161A289 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 07/01/1998 |
| From: | Berkow H NRC (Affiliation Not Assigned) |
| To: | |
| Shared Package | |
| ML16161A290 | List: |
| References | |
| NUDOCS 9807090240 | |
| Download: ML16161A289 (6) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 DUKE ENERGY CORPORATION DOCKET NO. 50-269 OCONEE NUCLEAR STATION. UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 230 License No. DPR-38 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment to the Oconee Nuclear Station, Unit 1 (the facility)
Facility Operating License No. DPR-38 filed by the Duke Energy Corporation (the licensee) dated June 4, 1998, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations as set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public;. and
'E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2.
Accordingly, the license is hereby amended by page changes to the Technical Specifications as indicated in the attachment to this license amendment, and Paragraph 3.B of Facility Operating License No. DPR-38 is hereby amended to read as follows:
9807090240 980701 PDR ADOCK 05000269 P
-2 B. Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 230, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
- 3.
This license amendment is effective as of its date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION erbert N. Berkow, Director Project Directorate 11-2 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation
Attachment:
Technical Specification Changes Date of Issuance:
July 1, 1998
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 DUKE ENERGY CORPORATION DOCKET NO. 50-287 OCONEE NUCLEAR STATION. UNIT 3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 227 License No. DPR-55 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment to the Oconee Nuclear Station, Unit 3 (the facility)
Facility Operating License No. DPR-55 filed by the Duke Energy Corporation (the licensee) dated June 4, 1998, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations as set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2.
Accordingly, the license is hereby amended by page changes to the Technical Specifications as indicated in the attachment to this license amendment, and Paragraph 3.B of Facility Operating License No. DPR-55 is hereby amended to read as follows:
-2 B. Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 227, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
- 3.
This license amendment is effective as of its date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION (Hert N.Berkow, irector Project Directorate 11-2 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation
Attachment:
Technical Specification Changes Dateof Issuance: July 1, 1998
ATTACHMENT TO LICENSE AMENDMENT NO. 230 FACILITY OPERATING LICENSE NO. DPR-38 DOCKET NO. 50-269 AND LICENSE AMENDMENT NO. 227 FACILITY OPERATING LICENSE NO. DPR-55 DOCKET NO. 50-287 Replace the following page of the Appendix "A" Technical Specifications with the enclosed page. The revised page is identified by amendment number and contains vertical lines indicating the areas of change.
Remove Insert 4.17-1 4.17-1
4.17 STEAM GENERATOR TUBING SURVEILLANCE An1glicability Applies to the surveillance of tubing of each steam generator.
Objective To ensure integrity of the steam generator tubing through a defined inservice surveillance program, and to minimize exposure of personnel to radiation during performance of the surveillance program.
Specification 4.17.1 Examination Methods Inservice inspection of steam generator tubing shall include non-destructive examination by eddy-current testing or other equivalent techniques. The inspection equipment shall provide a sensitivity that will detect defects with a penetration of 20 percent or more of the minimum allowable as-manufactured tube wall thickness.
4.17.2 Acceptance Criteria The steam generator shall be considered operable after completion of the specified actions. All tubes examined exceeding the repair limit shall be repaired by sleeving or rerolling or removed from service (e.g., plugged, stabilized).
For Units I and 3, there are a number of steam generator tubes which exceed the tube repair limit as a result of tube end anomalies. These tubes are temporarily exempted from the requirement for sleeving, rerolling or removal from service, until repaired during or before the next Unit I and Unit 3 refueling outages (Unit I EOC 18, and Unit 3 EOC 17 refueling outages, respectively). An analysis has been performed which confirms that operability of Units I and 3 will not be impacted with these tubes in service until the next refueling outage on each of these units.
4.17.3 Selection and Testing The steam generator tube minimum sample size, inspection result classification, and the corresponding action required shall be as specified in Table 4.17.1. The inservice inspection of steam generator tubes shall be performed at the frequencies specified in Specification 4.17.4 and the inspected tubes shall be verified acceptable per Specification 4.17.5. The tubes selected for each inservice inspection shall include at least 3% of the total number of tubes in both steam generators, with one or both steam generators being inspected. The tubes selected for these inspections shall be selected on a random basis except:
- a.
The first sample inspection during each inservice inspection of each steam generator shall include:
I. All tubes that previously had detectable wall penetrations (>20%) and have not been plugged or sleeve repaired in the affected area.
- 2. At least 50% of the tubes inspected shall be in those areas where experience has indicated potential problems.
- 3. A tube adjacent to any selected tube which does not permit passage of the eddy current probe for tube inspection.
Oconee 1, 2, and 3 4.17-1 Amendment No. 230 (Unit 1)
Amendment No. 227 (Unit 3)