Requests Addl Info in Response to Util 940504 Request for Approval for Use of TAC03 & Fuel Rod Gas Pressure Criterion for Plants.Util Should Inform NRC When Supporting Documents That Prescribes How Methodologies Would Be Applied
ML16161A188
Person / Time
Site: Oconee, Mcguire, Catawba, McGuire  Duke Energy icon.png
Issue date: 06/20/1994
From: Martin R
Office of Nuclear Reactor Regulation
To: Tuckman M
DUKE POWER CO.
References
TAC-M89548, TAC-M89549, NUDOCS 9406280051
Download: ML16161A188 (5)


Text

)

June 20, 1994(

Docket Nos. 50-269, 50-270, 50-287, DISTRIBUTION:

50-369, 50-370, and

-Docket File SVarga 50-413, 50-414 NRC/Local PDRs PDII-3 R/F DMatthews Mr. M. S. Tuckman LWiens Senior Vice President LCopp Nuclear Generation RMartin Duke Power Company VNerses P. 0. Box 1006 OGC, 15B18 Charlotte, North Carolina 28201 ACRS (10), P-315 JJohnson, RH

Dear Mr. Tuckman:

GLainas

SUBJECT:

REQUEST FOR APPROVAL FOR USE BY DUKE POWER COMPANY OF TACO3 AND THE FUEL ROD GAS PRESSURE CRITERION (FRGPC) FOR THE OCONEE, MCGUIRE AND CATAWBA NUCLEAR STATIONS (TAC NOS. M89548,M89549)

By your letter of May 4, 1994, you requested approval for use by Duke Power Company (DPC) of the TACO3 computer code and the Fuel Rod Gas Pressure Criterion (FRGPC), both of which are NRC-approved Babcock and Wilcox methodologies. Since the NRC staff intends to audit DPC's application of these methods, please inform the staff when the supporting documentation, that prescribes how these methodologies would be applied, becomes available. At that time, we will provide a more detailed schedule of our audit plans.

One area of importance to the staff, which will be investigated during the audit, is assurance that DPC's use of the Babcock and Wilcox Fuel Company methods is consistent with the code qualification and approved application of the methodology. Therefore, comparative calculations should be readily available during the audit to demonstrate that the results have not been unacceptably impacted by the "minor deviations relative to the approved methodologies to represent Duke's core design methodology" as mentioned in your letter.

Sincerely, Original signed by:

bberit.

Wartin, Senior Project Manager Project Directorate 11-3 Directorate for Reactor Projects I/II Office of Nuclear Reactor Regulation cc:

See next page

  • SEE PREVIOUS CONCURRENCE OFFICE PDII-3/

SRXB*

Pl3/PM, P

/D NAE L. BERRY T.COLLINS

. 'M_ART IN D

THEWS DATE 94

/6/94

//7/94 G0/2994 OFFICIAL RECORD COPY NAME:G:\\CATAWBA\\TACO3.LTR 9406280051 940620..1)

PDR ADOCK 05000269 P

RENEPDRR-

.1 June 20, 19944@

Docket Nos. 50-269, 50-270, 50-287, DISTRIBUTION:

50-369, 50-370, and Docket File SVarga 50-413, 50-414 NRC/Local PDRs PDII-3 R/F DMatthews Mr. M. S. Tuckman LWiens Senior Vice President LCopp Nuclear Generation RMartin Duke Power Company VNerses P. 0. Box 1006 OGC, 15B18 Charlotte, North Carolina 28201 ACRS (10), P-315 JJohnson, RH

Dear Mr. Tuckman:

GLainas

SUBJECT:

REQUEST FOR APPROVAL FOR USE BY DUKE POWER COMPANY OF TACO3 AND THE FUEL ROD GAS PRESSURE CRITERION (FRGPC) FOR THE OCONEE, MCGUIRE AND CATAWBA NUCLEAR STATIONS (TAC NOS. M89548,M89549)

By your letter of May 4, 1994, you requested approval for use by Duke Power Company (DPC) of the TACO3 computer code and the Fuel Rod Gas Pressure Criterion (FRGPC), both of which are NRC-approved Babcock and Wilcox methodologies. Since the NRC staff intends to audit DPC's application of these methods, please inform the staff when the supporting documentation, that prescribes how these methodologies would be applied, becomes available. At' that time, we will provide a more detailed schedule of our audit plans.

One area of importance to the staff, which will be investigated during the audit, is assurance that DPC's use of the Babcock and Wilcox Fuel Company methods is consistent with the code qualification and approved application of the methodology. Therefore, comparative calculations should be readily available during the audit to demonstrate that the results have not been unacceptably impacted by the "minor deviations relative to the approved methodologies to represent Duke's core design methodology" as mentioned in your letter.

Sincerely, Original signed by:

oberiteF. Wa'tin, Senior Project Manager Project Directorate 11-3 Directorate for Reactor Projects I/II Office of Nuclear Reactor Regulation cc: See next page

  • SEE PREVIOUS CONCURRENCE OFFIaE PDII-3/

SRXB*

P D

WE L. BERRY T.COLLINS V

MARrIN D

T EWS DATE 694

//94 2/7L94 o/o q94 OFFICIAL RECOR COPY NAME:G:\\CATAWBA\\TACO3.LTR

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20553-4001

        • June 2 0, 1994 Docket Nos. 50-269, 50-270, 50-287, 50-369, 50-370, and 50-413, 50-414 Mr. M. S. Tuckman Senior Vice President Nuclear Generation Duke Power Company P. 0. Box 1006 Charlotte, North Carolina 28201

Dear Mr. Tuckman:

SUBJECT:

REQUEST FOR APPROVAL FOR USE BY DUKE.POWER COMPANY OF TACO3 AND THE FUEL ROD GAS PRESSURE CRITERION (FRGPC) FOR THE OCONEE, MCGUIRE AND CATAW8A NUCLEAR STATIONS (TAC NOS.

M89548, M89549)

By your letter of May 4,J1994, you requested appoval for use by Duke Power Company_(DPC) of the TACO3 computer code and the Fuel Rod Gas Pressure Criterion (FRGPC),

both of which are NRC-approd Babcock and Wilcox methodologies. Since the NRC staff intends to audit DPC's application of these methods, please inform the staff when the supportihg documentation, that prescribes how these methodologies would be applied, becomes available.. At that time, we will provide a more detailed schedule of our auldit plans.

One area of importance to the staff, which will-te investigated during the audit, is assurance that DPC's use of the Babcock and Wilcox Fuel Company methods is consistent with the code qualification and approved application of the methodology.

Therefore, comparative calculations should be readily available during the audit to demonstrate that the results have not been unacceptably impacted by the "minor deviations relative to the approved methodologies to represent Duke's core design methodology" as mentioned in your letter.

Sincerely, Robert E. Martin, Senior Project Manager Project Directorate II-3 Directorate for Reactor Projects /II Office of Nuclear Reactor Regulation cc: See next Dage

Duke Power Company Catawba Nuclear Station McGuire Nuclear Station Oconee Nuclear Station cc:

Dr. John M. Barry Mr. Steve Benesole Mecklenburg County Compliance Department of Environmental Duke Power Company Protection Oconee Nuclear Site 700 N Tryon Street P. 0. Box 1439 Charlotte, North Carolina 29202 Seneca,.South.Carolina 29679 County Manager of Mecklenburg County Mr. Robert B. Borsum 720 East Fourth Street Babcock & Wilcox Charlotte, North Carolina 28202 Nuclear Power-Division Suite.525, Mr. Robert 0. Sharpe 1700 Rockville Pike Compliance Rockville, Maryland 20852 Duke Power Company McGuire Nuclear Site Manager, LIS 12700 Hagers Ferry Road NUS Corporatio Huntersville, North Carolina 28078 2650 McCormick.Drive, 3rd Floor Clearwater,. Flordia.. 34619-1035 Senior Resident Inspector c/o U.S. Nuclear Regulatory Senior Resident-Inspector Commission U.S. Nuclear Regulatory Commission 12700 Hagers Ferry Road Route 2, Box,610 Huntersville, North Carolina 28078 Seneca,, South Carolina 29678 Mr. Dayne H. Brown, Director Mr. David L. Rehn Department of Environmental Vice President-,.Catawba Site Health and Natural Resources.

Duke.Power Company.

Division of Radiation Protection 4800 Concord.Road P. 0. Box 27687 York, South Carolina 29745 Raleigh, North Carolina 27611 Mr. T. C. McMeekin Office of Intergovernmental Vice President, McGuire-Site Relations Duke Power Company 116 West Jones Street 12700 Hagers Ferry Road Raleigh, North Carolina 27621 Huntersville, North Carolina 28078 County Supervisor of Oconee County Elaine Wathen, Lead REP Planner Walhalla, South Carolina 27621 Division of Emergency Management 116 West Jones Street Mr. J. W. Hampton Raleigh, North-Carolina 27603-1335 Vice President, Oconee Site Duke Power Company P. 0. Box 1439 Seneca, South Carolina 29679

Duke Power Company Catawba Nuclear Station McGuire Nuclear Station Oconee Nuclear Station cc:

Mr. Z. L. Taylor Mr. Marvin Sinkule, Chief Regulatory Compliance Manager Project Branch #3 Duke Power Company U. S. Nuclear Regulatory Commission 4800 Concord Road 101 Marietta Street, NW Suite.2900 York, South Carolina 29745 Atlanta, Georgia 30323 A. V. Carr, Esquire North Carolina.Electric Membership Duke Power Company Corporation 422 South Church Street P. 0. Box 27306 Charlotte, North Carolina 28242 Raleigh, North Carolina 21611 J. Michael McGarry, III, Esquire Saluda River-Electric Cooperative, Winston and Strawn Inc.

1400 L Street, NW.

P. 0. Box 929 Washington, DC 20005 Laurens, South-Carolina 29360 North Carolina Municipal Power Senior Resident Inspector Agency Number 1 Route 2, Box 179N 1427 Meadowwood Boulevard York, South Carolina-29745, P. 0. Box 29513 Raleigh, North Carolina 27626, Regional Administrat-or-, Region II U.S. Nuclear Regulatory.Commission Mr. T. Richard Puryear 101 Marietta Street, NW Suite-2900 Nuclear Technical Services Manager Atlanta, Georgia 30323 Westinghouse Electric Corporation Carolinas District Max Batavia, Chief 2709 Water Ridge Parkway, Suite 430 Bureau of Radiological. Health Charlotte, North Carolina 28217 South Carolina Department-of Health and Environmental Control County Manager of York County 2600 Bull Street York County Courthouse Columbia, South Carolina 29201 York, South Carolina 29745 Ms. Karen E. Long Richard P. Wilson, Esquire Assistant Attorney General Assistant Attorney General North Carolina Department of Justice S.C. Attorney General's Office P. 0. Box 629 P. 0. Box 11549 Raleigh, North Carolina 27602 Columbia, South Carolina 29211 Mr. G. A. Copp Piedmont Municipal Power Agency Licensing -

ECO50 121 Village Drive Duke Power Company Greer, South Carolina 29651 P. 0. Box 1006 Charlotte, North Carolina 28201-1006