OCOTBER 4, 1996
Duke Power Company
ATTN: Mr. J. W. Hampton
Vice President
Oconee Site
P. 0. Box 1439
Seneca, SC 29679
SUBJECT:
NRC INSPECTION REPORT NOS. 50-269/94-31, 50-270/94-31,
50-287/94-31
Dear Mr. Hampton:
In our letter of July 12, 1995, we stated that we were reviewing your denial of
Violation 3 of 50-269, 50-270, 50-287/94-31. Due to an administrative oversight, we
did not provide you with the results of that review and did not complete our review
until the service water followup inspection at your Oconee facility August 26-30, 1996.
Your response denied Violation 3 on the basis that certain valves are not required in
the ASME Section XI (IST) program but are in an Appendix B program that NRC
.
approved.
We have completed our review of your position and, as discussed in the enclosure,
concur that valves, in lieu of being included in an IST program, may be included in
the Oconee Appendix B program if the valves are not required to achieve a safe
shutdown condition of hot standby or hot shutdown, but only required to achieve cold
shutdown following a design basis accident. However, our review identified one
valve, LPSW-53 that was not included in the IST program or Appendix B program,
but according to the resolution of your corrective action program, was required to be
included in the IST program because it could be required to perform a safety function
of mitigating an accident. Therefore, one example of the violation was valid as
written.
The corrective actions for this violation were reviewed and found to be acceptable
during NRC inspection 50-269, 50-270, 50-287/96-13. Therefore, no supplemental
response to this item is required.
Sincerely,
ORIGINAL SIGNED BY
ALBERT GIBSON
9610220041 961004
Albert F. Gibson, Director
PDR ADOCK 05000269
Division of Reactor Safety
Docket Nos. 50-269, 50-270, 50-287
License Nos. DPR-38, DPR-47, DPR-55
Enclosure: (See page 2)
2
Enclosure: Response Evaluation
cc w/encl:
Mr. J. E. Burchfield
Compliance
Duke Power Company
P. 0. Box 1439
Seneca, SC 29679
Mr. Paul R. Newton
Legal Department (PB05E)
Duke Power Company
422 South Church Street
Charlotte, NC 28242-0001
Mr. Robert P. Gruber
Executive Director
Public Staff - NCUC
P. 0. Box 29520
Raleigh, NC 27626-0520
Mr. Robert B. Borsum
Babcock and Wilcox Company
Nuclear Power Generation Division
1700 Rockville Pike, Suite 525
Rockville, MD 20852
Mr. J. Michael McGarry, Ill, Esq.
Winston and Strawn
1400 L Street, NW
Washington, D. C. 20005
Dayne H. Brown, Director
Division of Radiation Protection
N. C. Department of Environmental
Health & Natural Resources
P. 0. Box 27687
Raleigh, NC 27611-7687
County Supervisor of
Oconee County
Walhalla, SC 29621
(cc w/encl cont'd - See page 3)
3
(cc w/encl cont'd)
Mr. Max Batavia, Chief
Bureau of Radiological Health
South Carolina Department of Health
and Environmental Control
2600 Bull Street
Columbia, SC 29201
Manager, LIS
NUS Corporation
2650 McCormick Drive
Clearwater, FL 34619-1035
Mr. G. A. Copp
Licensing - ECO50
Duke Power Company
P. 0. Box 1006
Charlotte, NC 28201-1006
Ms. Karen E. Long
.
Assistant Attorney General
N. C. Department of Justice
P. 0. Box 629
Raleigh, NC 27602
Distribution w/encl:
D. LaBarge, NRR
R. Carroll, RII
R. V. Crlenjak, RII
N. Economos, RII
R. Baldwin, RII
G. Hallstrom, RI1
PUBLIC
NRC Resident Inspector
U.S. Nuclear Regulatory Commission
78128 Rochester Highway
Seneca, SC 29672
OFFICE
.
R
RI
S
RIIDRP
RIT I
SIGNATURE
NAME
Y
FREDRICKSON
WERT
C
I'
DATE
96/
K$/
96
/
96
09/
/96
09/
/96
COPY?
YES
NO
YES
NO
5
N
YES
NO
YES
NO
YES
NO
L RURUU
UP[Y
UULUMENI
NAML:
P: \\U-U-UN. L R..