FORD 1
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9402280098
DOC.DATE: 94/02/17
NOTARIZED: NO
DOCKET #
ACIL:50-269 Oconee Nuclear Station, Unit 1, Duke Power Co.
05000269
50-270 Oconee Nuclear Station, Unit 2, Duke Power Co.
05000270
50-287 Oconee Nuclear Station, Unit 3, Duke Power Co.
05000287
AUTH.NAME
AUTHOR AFFILIATION
HERDT,A.R.
Region 2 (Post 820201)
RECIP.NAME
RECIPIENT AFFILIATION
HAMPTON,J.W.
Duke Power Co.
SUBJECT: Forwards insp repts 50-269/94-01,50-270/94-01 & 50-287/94-01
I
& NOV.Violation is of concern because licensee did not
require adequate procedural guidance or oversight of vendor
installation of steam generator tube plugs.
DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR
ENCL J SIZE: 3
S
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
RECIPIENT
COPIES
RECIPIENT
COPIES
ID CODE/NAME
LTTR ENCL
ID CODE/NAME
LTTR ENCL
PD2-3 PD
1
1
WIENS,L
1
1
INTERNAL: ACRS
2
2
AEOD/DEIB
1
1
AEOD/DSP/ROAB
1
1
AEOD/DSP/TPAB
1
1
AEOD/TTC
1
1
DEDRO
1
1
NRR/DORS/OEAB
1
1
NRR/DRCH/HHFB
1
1
NRR/DRIL/RPEB
1
1
NRR/DRSS/PEPB
1
1
NRR/PMAS/ILPB1
1
1
NRR/PMAS/ILPB2
1
1
NUDOCS-ABSTRACT
1
1
1
1
OGC/DS2
1
1
QREG F
02
1
1
RES/HFB
1
1
RGN-2-FILE
01
1
1
0
EXTERNAL: EG&G/BRYCE,J.H.
1
1
NRC PDR
1
1
1
1
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.
ROOM PI-37 (EXT. 504-2065) TO ELIMINATE YOUR NAME FROM DISTRIBUTION
LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR
24
ENCL
24
FEB17 1994
Docket Nos. 50-269, 50-270, 50-287 and 72-4
Duke Power Company
ATTN: Mr. J. *W.
Hampton
Vice President
Oconee Site
P. 0. Box 1439
Seneca, SC
29679
Gentlemen:
SUBJECT:
(NRC INSPECTION REPORT NOS. 50-269/94-01, 50-270/94-01 AND
50-287/94-01)
This refers to the inspection conducted by P. E. Harmon of this office on
January 2 through January 29, 1994. The inspection included a review of
activities authorized for your Oconee facility. At the conclusion of the
inspection, the findings were discussed with those members of your staff
.
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
Based on the results of this inspection, certain activities appeared to be in
violation of NRC requirements, as specified in the enclosed Notice of
Violation (Notice). The violation is of concern because you did not require
adequate procedural guidance or oversight of vendor installation of steam
generator tube plugs, an activity important to safety.
You are required to respond to this letter and should follow the instructions
specified in the enclosed Notice when preparing your response. In your
response, you should document the specific actions and any additional actions
you plan to prevent recurrence. After reviewing your response to this Notice,
including your proposed corrective actions and the results of future
inspections, the NRC will determine whether further NRC enforcement action is
necessary to ensure compliance with the NRC regulatory requirements.
In accordance with 10 CFR 2.970 of the NRC's "Rules of Practice", a copy of
this letter and its enclosures will be placed in the NRC Public Document Room.
The responses directed by this letter and the enclosed Notice are not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, Pub. L. No.96-511.
9402280098
940217
PDR -ADOCK 05000269
G
Duke Power Company
2
FEB 171994
Should you have any questions concerning this letter, please contact us.
Sincerely,
ORIGINAL 54GNED BY
ALAN R. 1Di.T
Alan R. Herdt, Chief
Reactor Projects Branch 3
Division of Reactor Projects
Enclosures:
2. NRC inspection Report
cc w/encls:
Steve Benesole
Compliance
Duke Power Company
P. 0. Box 1439
Seneca, SC
29679
A. V.
Carr, Esq.
Duke Power Company
422 South Church Street
Charlotte, NC 28242-0001
County Supervisor of
Oconee County
Walhalla, SC
29621
Robert B. Borsum
Babcock and Wilcox Company
Nuclear Power Generation Division
1700 Rockville Pike, Suite 525
Rockville, MD 20852
J. Michael McGarry, III, Esq.
Winston and Strawn
1400 L Street, NW
Washington, D. C. 20005,
Office of Intergovernmental Relations
116 West Jones Street
Raleigh, NC 27603
cc w/encls: See page 3
Duke Power Company
3
FEB 17 1994
cc w/encls: Continued
Max Batavia, Chief
Bureau of Radiological Health
South Carolina Department of Health
and Environmental Control
2600 Bull Street
Columbia, SC 29201
Manager, LIS
NUS Corporation
2650 McCormick Drive
Clearwater, FL 34619-1035
G. A. Copp
Licensing - EC050
Duke Power Company
P. 0. Box 1006
Charlotte, NC 28201-1006
Karen E.. Long
Assistant Attorney General
N. C. Department of Justice
P. 0.
Box 629
Raleigh, NC 27602
bcc w/encl:
L. A. Wiens, NRR
W. Miller, RII'
M. S. Lesser, RII
A. R. Herdt, RII
Document Control Desk
NRC Resident Inspector
U.S. Nuclear Regulatory Commission
Route 2, Box 610
Seneca, SC
29678
RII
WMiller
e r 4
02/; /94
02//D/94