ML16152A880
| ML16152A880 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 12/06/1989 |
| From: | Davis A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Owen W DUKE POWER CO. |
| References | |
| NUDOCS 8912120051 | |
| Download: ML16152A880 (2) | |
Text
ACCELERATED DI*LBUTION DEMONSTFTION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
WCESSION NBR:8912120051 DOC.DATE: 89/12/06 NOTARIZED: NO DOCKET'#
FACIL:50-269 Oconee Nuclear Station, Unit 1, Duke Power Co.
05000269 50-270 Oconee Nuclear Station, Unit 2, Duke Power Co.
05000270 50-287 Oconee Nuclear Station, Unit 3, Duke Power Co.
05000287 AUTH.NAME AUTHOR AFFILIATION DAVIS,A.B.
Region 3, Ofc of the Director P
RECIP.NAME RECIPIENT AFFILIATION OWENW.
Duke Power Co.
SUBJECT:
Ack participation in regulatory impact survey on 891201.
DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR ENCL 0 SIZE:
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:
RECIPIENT COPIES RECIPIENT COPIES A
ID CODE/NAME LTTR-ENCL ID CODE/NAME LTTR ENCL PD2-3 PD 1
WIENS,L 1
INTERNAL: ACRS 2
AEOD 1
AEOD/DEIIB 1
AEOD/TPAD 1
DEDRO 1
NRR SHANKMAN,S 1
NRR/DET/DIR 8H3 1
NRR/DLPQ/LPEB10 1
NRR/DOEA DIR 11 1
NRR/DREP/PEPB9D 1
NRR/DREP/PRPB11 2
NRR/DRIS/DIR 1
NRR/DST/DIR 8E2 1
NRR/PMAS/ILRB12
- 1.
NUDOCS-ABSTRACT 1
OE LIEBERMAN,J 1
OGC/HDS2 1
L C
F 02 1
RES MORISSEAU,D 1
RGN2 FILE 01 1
EXTERNAL: LPDR 1
NRC PDR 1
NSIC 1
R D
5 A
D D
NOTE TO ALL "RIDS" RECIPIENTS:
S PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TAL NUMBER OF COPIES REQUIRED: LTTR 27 ENCL 7
J;-
tGUNITED STAT.E S;:
c DB/
IDS NUCLEAR REGULATORY COMMISSION Designated Original REGION III Certified by 799 ROOSEVELT ROAD GLEN ELLYN. ILLINOIS 60137 December 6, 1989 Duke Power Company ATTN:
Mr. Warren Owen, Executive Vice President, Power Group 422 South Church Street Charlotte, NC 28242
Dear Mr. Owen:
We appreciate your and your staff's participation in our Regulatory Impact Survey conducted on December 1, 1989 at your corporate office. The comments we received from you and all levels of your staff will help make this a meaningful survey. Please extend our appreciation to your staff. I will provide you with a copy of the final report when-completed.
Sincerely, A. Bert Davis Regional Administrator cc: T. E. Murley, NRR S. D. Ebneter, RII Resident Inspector, Catawba Resident Inspector, McGuire Resident Inspector, Oconee DCD/RIDS FL A
Ir'