ML16152A726

From kanterella
Jump to navigation Jump to search
Advises That 880607 Rev 88-1 to Emergency Plan Meets Planning Stds of 10CFR50.47(b) & Requirements of App E to 10CFR50
ML16152A726
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 08/05/1988
From: Dan Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tucker H
DUKE POWER CO.
References
NUDOCS 8808170127
Download: ML16152A726 (2)


Text

ACCELERKTED DISxMBviON DEMONSTRAON SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8808170127 DOC.DATE: 88/08/05 NOTARIZED: NO DOCKET #

FACIL:50-269 Oconee Nuclear Station, Unit 1, Duke Power Co.

05000269 50-270 Oconee Nuclear Station, Unit 2, Duke Power Co.

05000270 50-287 Oconee Nuclear Station, Unit 3, Duke Power Co.

05000287 AUTH.NAME AUTHOR AFFILIATION COLLINS,D.M.

Region 2, Ofc of the Director RECIP.NAME RECIPIENT AFFILIATION TUCKER,H.B.

Duke Power Co.

IR

SUBJECT:

Advises that 880607 Rev 88-1 to emergency plan meets stds of 10CFR50.47(b) & App e & acceptable.

DISTRIBUTION CODE: IE35D COPIES RECEIVED:LTR _

ENCL _

SIZE: _

TITLE: Emergency Preparedness-Appraisal/Confirmatory Action Ltr/Exercise Rep NOTES:AEOD/Ornstein:1cy.

05000269 S AEOD/Ornstein:1cy.

05000270 AEOD/Ornstein:1cy.

05000287 /

A RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL D

PD2-3 PD 1

PASTIS,H 1

INTERNAL: ARM/DAF/LFMB 1

NRR/DREP/EPB 10 1

SILRBl2 1

NUDOCS-ABSTRACT 1

S I02 1

RGN2 FILE 01 1

RGN2/DRTSS/EPRPB 1

EXTERNAL: LPDR 1

NRC PDR 1

NSIC 1

NOTES:

1 R

A D

S TOTAL NUMBER OF COPIES REQUIRED: LTTR 13 ENCL

-1r

AN 0O5 19 8

Dyke Power Company

.ATTN: Mr. H. B. Tucker, Vice President Nuclear Production Department 422 South Church Street Charlotte, NC 28242 Gentlemen:

SUBJECT:

OCONEE EMERGENCY PLAN REVIEW, REVISION 88-1, DOCKET NOS. 50-269, 50-270 AND 50-287 We have completed our review of Revision 88-1 to your Oconee Nuclear Station Emergency Plan dated June 7, 1988. Based on our review, we have concluded that the changes meet the planning standards of 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR 50.

Please be reminded that 10 CFR 50.54(q) requires that proposed changes that decrease the effectiveness of your Emergency Plan shall not be implemented without application to and approval by the Commission. However, changes may be made without Commission approval if such changes do not decrease the effectiveness of the Plan, and the Plan, as changed, continues to meet the standards of 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR 50.

If a change is made without approval, you should furnish copies in accordance with 10 CFR 50.54(q).

Also, any changes to the Emergency Plan Implementing Procedures should be made in accordance with the requirements of 10 CFR 50, Appendix E, Section V.

Should you have any questions regarding this letter, please contact Mr. Thomas R. Decker of our staff at 404 331-2559.

Sincerely, Original Slgned Douglas M. Collins, Chief Emergency Preparedness and Radiological Protection Branch Division of Radiation Safety and Safeguards cc: JC S. Tuckman, Station Manager bcc:LMfC Resident Inspector DRS Technical Assistant H. Pastis, NRR Document Control Desk State of South Carolina V. D. Traver,. NRR RII RII ABo and TDe jebles 8/V /88 8/

I /88 F

IleI