ML16152A705

From kanterella
Jump to navigation Jump to search
Confirms 880531 Telcon Re 880607 Mgt Meeting to Discuss Issues Surrounding Recent Events at Plant.Proposed Agenda Encl
ML16152A705
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 06/03/1988
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tucker H
DUKE POWER CO.
References
NUDOCS 8806200446
Download: ML16152A705 (3)


Text

ACCELERATED D1VlBUTION DEMONST W ON SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8806200446 DOC.DATE: 88/06/03 NOTARIZED: NO DOCKET #

FACIL:50-269 Oconee Nuclear Station, Unit 1, Duke Power Co.

05000269 50-270 Oconee Nuclear Station, Unit 2, Duke Power Co.

05000270 50-287 Oconee Nuclear Station, Unit 3, Duke Power Co.

05000287 AUTH.NAME AUTHOR AFFILIATION REYES,L.A.

Region 2, Ofc of the Director RECIP.NAME RECIPIENT AFFILIATION TUCKER,H.B.

Duke Power Co.

R

SUBJECT:

Confirms 880531 telcon re 880607 mgt meeting to discuss issues surrounding recent events.Proposed agenda encl.

DISTRIBUTION CODE: IE45D COPIES RECEIVED:LTR I ENCL SIZE: 2 TITLE: Summary of Significant Meeting with Licensee (Part 50)

NOTES:AEOD/Ornstein:1cy.

05000269 S AEOD/Ornstein:1cy.

05000270 AEOD/Ornstein:1cy.

05000287 /

A RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL D

PD2-3 LA 1

0 PASTIS,H 1

1 INTERNAL: AEOD/DOA 1

1 AEOD/DSP/TPAB 1

1 DEDRO 1

1 NRR/DLPQ/QAB 10 1

1 s

NRR/DREP/EPB 10 1

1 NRR/PMAS/ILRB12 1

1 STRACT 1

1 OGC/ROED 1

1 REG FILE 02 1

1 RES/DE/EIB 1

1 RGN2 FILE 01 1

1 EXTERNAL: LPDR 1

1 NRC PDR 1

1 NSIC 1

1 NOTES:

1 1

R A

D S

A D

D S

TOTAL NUMBER OF COPIES REQUIRED: LTTR 17 ENCL 16

JUN 0 3 li Docket Nos. 50-269, 50-270, 50-287 License Nos. DPR-38, DPR-47, DPR-55 Duke Power Company ATTN:

Mr. H. B. Tucker, Vice President Nuclear Production Department 422 South Church Street Charlotte, NC 28242 Gentlemen:

SUBJECT:

CONFIRMATION OF MEETING ARRANGEMENTS - OCONEE, DOCKET NOS. 50-269, 50-270 AND 50-287 This confirms the conversation between Mr. M. S. Tuckman of Duke Power Company and Mr. P. H. Skinner of my staff on May 31, 1988, concerning a management meeting to be conducted in the Region II office on June 7, 1988, at 1:00 p.m.

We requested this meeting to discuss issues surrounding the recent events at Oconee, a proposed agenda is attached.

Should you have any questions regarding these arrangements, we will be pleased to discuss them.

Sincerely, ORIGINAL S!GNE:D :,-

VIRGIL L. BONE Luis A. Reyes, Director Division of Reactor Projects

Enclosure:

Proposed Agenda cc w/encl:

M. S. Tuckman, Station Manager bcc w/encl:

NRC Resident Inspector DRS Technical Assistant H. Pastis, NRR Document Control Desk State of South Carolina RH RH TP es VBrkhlee 6/f /88 6/q /88 8806200446 880603 PDR ADOCK 05000269 0

DCDn

ENCLOSURE PROPOSED AGENDA Introduction of Issues 1:00 p.m.

J. N. Grace H. B. Tucker (1) Discussion of falsification of records pertaining to fire watch logs and surveillance records (2) Discussion of design control problems as it relates to the Reactor Protection System cabinets and discrepancies between wiring drawings and the as-built configuration.

(3) Discussion of demeanor of control room personnel