ML16152A311

From kanterella
Jump to navigation Jump to search
Notifies That H Nicolaras Became Project Manager for Facilities,Effective 840312 & Assumed Jf Suermann Responsibilities
ML16152A311
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 03/16/1984
From: Stolz J
Office of Nuclear Reactor Regulation
To: Tucker H
DUKE POWER CO.
References
NUDOCS 8404060005
Download: ML16152A311 (3)


Text

o UNITED STATES 74 NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 March 16, 1984 Dockets N'os. 50-269, 50-270, and 50-287 Mr. H. B. Tucker Vice President -

Nuclea Production Duke Power Company P. 0. Box 33189 422 South Church Street Charlotte, North Carolina 282

Dear Mr. Tucker:

Effective March 12, 1984, Hel n Nicol ras became the Project Manager for the Oconee Nuclear Station, Uni 1, 2 and and has assumed the responsibilities for that plant formerly as igned to John F. Suermann. You may contact Ms. Nicolaras by calling 301) 492-8561.

Sincerel Joh F. Stolz, Chief--

Op ating Reacto s Branch #4 ivision of Licen ing cc:

See ne page 8404060005 840316 PDR ADOCK 05000269 P

PDR

Duke Power Company cc w/enclosure(s):

Mr. William L. Porter Duke Power Company P. 0. Box 33189 422 South Church Street Office of Intergovernmental Relations Charlotte, North Carolina 28242 116 West Jones Street Raleigh, North. Carolina 27603 Honorable James M. Phinney County Supervisor of Oconee County Walhalla, South Carolina 29621 Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission, Region II 101 Marietta Street, NW, Suite'2900 Atlanta, Georgia 30303 Heyward G. Shealy, Chief Bureau of Radiological Health South Carolina Department of Health and Environmental Control Regional Rpe2600 Bull Street

Columbia, South Carolina 29201 EPA Region IV 345 Courtland Street, N.E.

Atlanta, Georgia 30308 Mr. J. C..Bryant Senior Resident Inspector U.S. Nuclear Regulatory Commission Route 2, Box 610 Seneca, South Carolina 29678 Mr. Robert B. Borsum Babcock & Wilcox Nuclear Power Generation Division Suite 220, 7910 Woodmont Avenue Bethesda, Maryland 20814 Manager, LIS NUS Corporation 2536 Countryside Boulevard Clearwater, Florida 33515 J. Michael McGarry, III, Esq.

Bishop, Liberman, Cook, Purcell & Reynolds 1200 17th Street, N.W.

Washington, D. C. 20036

Dockets Nos. 50-269, 50-270, and 50-287 Mr. H. B. Tucker Vice President - Nuclear Production Duke Power Company P. 0. Box 33189 422 South Church Street Charlotte, North Carolina 28242

Dear Mr. Tucker:

Effective March 12, 1984, Helen Nicolaras became the Project Manager for the Oconee Nuclear Station, Units 1, 2 and 3 and has assumed the responsibilities for that plant formerly assigned to John F. Suermann.

You may contact Ms. Nicolaras by calling (301) 492-8561.

Sincerely, John F. Stolz, Chief Operating Reactors Branch #4 Division of Licensing cc:

See next page L PDR ORB#4 Rdg DEisenhut OELD ACRS-10 EBlackwood H0rnstein EJordan JNGrace RIngram HNicolaras Gray File OR4 4DL

DL laras;cf Js 3/t /84 3/