Forwards Summary of 840228 Meeting W/Util in Atlanta,Ga Re 10CFR50.48 & 10CFR50,App R Fire Protection Application. Attendance List Also Encl
ML16152A307
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 03/07/1984
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tucker H
DUKE POWER CO.
References
NUDOCS 8403160245
Download: ML16152A307 (3)


Text

Official Record Copy 1AR 0*7 1984 Duke Power Company ATTN:

Mr. H. B. Tucker, Vice President Nuclear Production Department 422 South Church Street Charlotte, NC 28242 Gentlemen:

SUBJECT:

MEETING

SUMMARY

- DOCKET NOS. 50-269, 50-270, AND 50-287 This letter refers to the meeting conducted at your request in the NRC Region II office on February 28, 1984.

The meeting related to the application of 10 CFR 50.48 and 10 CFR 50 Appendix R, Fire Protection, at the Oconee facility.

Enclosed is a summary of the meeting topics.

It is our opinion that this meeting was beneficial, and provided for a better understanding of the NRC's fire protection requirements.

In accordance with Section 2.790 of NRC's "Rules of Practice", Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosure will be placed in NRC's Public Document Room.

Should you have any questions concerning this matter, we will be pleased to discuss them.

Sincerely, (Original signed by DMVerrelli)

Richard C. Lewis, Director Division of Project and Resident Programs

Enclosure:

Meeting Summary cc w/encl:

J. Ed Smith, Station Manager bcc w/encl:

Document Control Desk State of North Carolina NRC Resident Inspector RH RI RI R

RII WHMi TEConlon JAOl hinski RCLewis 84

/

/84/84

/84 8 4 8403160245 840307 PDR ADOCK 05000269 F

PDR

ENCLOSURE MEETING

SUMMARY

Licensee: Duke Power Company Facility: Oconee Docket Nos.:

50-269, 50-270 and 50-237 License Nos.:

DRP-38, DPR-47 and DPR-55

Subject:

Fire Protection Requirements A management meeting was held in the NRC Region II office on February 28, 1984, to discuss the application of 10 CFR 50.48 and 10 CFR 50 Appendix R (Fire Protection) at the Oconee Site.

The following items were discussed in detail:

Appendix R exemptions for Oconee, including the fire barrier separation between the east and west penetration rooms for each unit, cork filler material used in the expansion joints of fire barriers, separation of instrumentation circuits within each reactor building, and emergency lighting units; current outstanding fire protection items which have been identified by Region II; necessary damage control repair procedures required following a fire; and, protection required for associated circuits.

The licensee was advised that an exemption should be submitted to the NRC for any feature which does not technically meet the requirements of 10 CFR 50.48 and the applicable section of Appendix R.

The licensee indicated that portions of the Oconee Appendix R submittals were to be discussed further to verify that the required features were adequately addressed and where applicable, sufficient exemptions would be submitted to the NRC.

Attachment:

Attendance List

0 4ARO07 194 ATTACHMENT ATTENDANCE LIST Attendance at the Duke -

NRC meeting on February 28, 1984, at the NRC Region II office included:

Duke Power Company J. T. McIntosh, Station Service Superintendent, Oconee J. R. Hendricks, Principle Engineer - Charlotte P. Guill, Nuclear Production Department - Charlotte H. D. Brandes, Design Engineer - Charlotte NRC -

Region II T. E. Conlon, Chief, Plant SystemsSection V. L. Brownlee, Chief, Project Section 2A W. H. Miller, Jr., Fire Protection Engineer