June 30, 1992 Docket Nos. 50-269, 50-270, 50-287, 50-369, 50-370, 50-413, 50-414 License Nos. DPR-38, DPR-47, DPR-55, NPF-9, NPF-17, NPF-35, NPF-52 Mr. H. B. Tucker, Senior Vice President Nuclear Generation Duke Power Company P. 0. Box 1007 Charlotte, North Carolina 28201-1007 Gentlemen:
SUBJECT:
REVISIONS TO DUKE POWER COMPANY'S QUALITY ASSURANCE (QA) PROGRAM The changes for the Duke Power Company Topical Report (Duke-1-A), "Quality Assurance Program," which were submitted in your letter dated November 27, 1991, and the additional information you submitted dated April 6, 1992, have been reviewed. To complete our review, we have identified three additional items which require clarification. Please provide a response to the enclosed questions.
We appreciate your cooperation with us. If you have any questions concerning this request, please contact F. Jape of my staff on (404) 331-4182.
Sincerely, (Original signed by J. J. Blake for)
Caudle A. Julian, Chief Engineering Branch Division of Reactor Safety
Enclosure:
Questions to Proposed QA Program Changes cc w/encl:
(See page 2) 920714Oc)O0 92063o PDR
L~;-+--~PT.2 ue30, J992 (cc w/encl)
R. C. Futrell Compliance Duke Power Company 4800 Concord Road York, SC 29745-9635 A. V. Carr, Esq.
Duke Power Company 422 South Church Street Charlotte, NC 28242-0001 J. Michael McGarry, Ill, Esq.
Winston and Strawn 1400 L Street, NW Washington, D. C. 20005 North Carolina MPA-1 Suite 600 P. 0. Box 29513 Raleigh, NC 27626-0513 Heyward G. Shealy, Chief Bureau of Radiological Health S. C. Department of Health and Environmental Control 2600 Bull Street Columbia, SC 29201 Richard P. Wilson, Esq.
Assistant Attorney General S. C. Attorney General's Office P. 0. Box 11549 Columbia, SC 29211 Michael Hirsch Federal Emergency Management Agency 500 C Street, Sw, Room 840 Washington, D. C. 20472 (cc w/encl cont'd - see page 3)
(cc w/encl cont'd)
North Carolina Electric Membership Corporation P. 0. Box 27306 Raleigh, NC 27611 Karen E. Long Assistant Attorney General N. C. Department of Justice P. 0. Box 629 Raleigh, NC 27602 Saluda River Electric Cooperative, Inc.
P.-O. Box 929 Laurens, SC 29360 Frank Modrak, Project Manager Mid-South Area ESSD Project Westinghouse Electric Corporation MNC West Tower - Bay 239 P. 0. Box 355 Pittsburgh, PA 15230 County Manager of York County York County Courthouse York, SC 29745 Piedmont Municipal Power Agency 121 Village Drive Greer, SC 29651 R. L. Gill Nuclear Production Department Duke Power Company P. 0. Box 1007 Charlotte, NC 28201-1007 (cc w/encl cont'd - see page 4)
-. Mr. H.-B. Tucker June 30, 1992 (cc w/encl cont'd)
R. 0. Sharpe Compliance Duke Power Company 12700 Hagers Ferry Road Huntersville, NC 28078-8985 Dayne H. Brown, Director Division of Radiation Protection N. C. Department of Environment, Health & Natural Resources P. 0. Box 27687 Raleigh, NC 27611-7687 County Manager of Mecklenburg County 720 East Fourth Street Charlotte, NC 28202 Dr. John M. Barry Department of Environmental Health Mecklenburg County 1200 Blythe Boulevard Charlotte, NC 28203 Karen E. Long Assistant Attorney General N. C. Department of Justice P. 0. Box 629 Raleigh, NC 27602 M. E. Patrick Compliance Duke Power Company P. 0. Box 1439 Seneca, SC 29679 County Supervisor of Oconee County Walhalla, SC 29621 (cc w/encl cont'd - see page 5)
-Mr. H. B. Tucker 5
June 30, 1992 (cc w/encl cont'd)
Robert B. Borsum Babcock and Wilcox Company Nuclear Power Generation Division 1700 Rockville Pike, Suite 525 Rockville, MD 20852 Office of Intergovernmental Relations 116 West Jones Street Raleigh, NC 27603 Manager, LIS NUS Corporation 2650 McCormick Drive Clearwater, FL 34619-1035 bcc w/encl:
T. Reed, NRR R. E. Martin, NRR L. Wiens, NRR W. Miller, Rll G. A. Belisle, RI A. R. Herdt, RII S. Ninh, RII Document Control Desk NRC Resident Inspector U.S. Nuclear Regulatory Commission 12700 Hagers Ferry Road Huntersville, NC 28078-8985 NRC Resident Inspector U.S. Nuclear Regulatory Commission Route 2, Box 179-N York, SC 29745 U. S. Resident Inspector U.S. Nuclear Regulatory Commission Route 2, Box 610 Seneca, SC 29678 RII:DRS RII:DRS RII:D MThomas:er F
G le 06/30/92 06/ )/92 06/
19 2
-ENCLOSURE
- 11.
Request for additional information (RAI) 61and others) was asked'in order to obtain a clearer understanding whether the scope of Duke Power Company's graded QA program meets NRC requirements and guidance. The response is acceptable in that a clear commitment to meet NRC's QA guidance for nonmetallic insulation for austenitic stainless steel and protective coatings has been added to Table 17.0-1. It is unacceptable in that these items are apparently not classified as QA Condition where is a designation such that quality is ensured commensurate with the item's importance to safety. They should be. Other items [such as ATWS equipment, safety parameter display systems, and the nonsafety-related items referred to in 10 CFR 50.65(b)(2)] should be similarly classified and controlled. "QA Condition 1" appears to be as limiting as "nuclear safety related" and changing from one term to the other does not really help our understanding. Please clarify.
- 2.
The response to RAI 27 indicates that an appropriate way to address SRP criteria C.2.c, d, e, and f is in the specific sections where they apply. This is acceptable to the staff. However, in light of the dashes (indicating no commitments) and the P's (indicating partial commitment) in the matrix below, consideration should be given as to whether these criteria should be applied to more functions than currently indicated. Please clarify.
FUNCTION/CRITERION' C.2.c C.2.d C.2.e C.2.f NSRB Internal Audits P
X X
X Safety Assurance
-X P
Corporate Audits P
x Int. Safety Assessments
-P Self-initiated T. Audits P
P Vendors P
P
- 3.
The responses to RAls 13 (first sentence), 15, 18, 19, 21 (last sentence),
and 23 should be included in the topical report. Please consider adding.
'C.2.c Planning with acceptance criteria C.2.d Graded approach C.2.e Performance-based scheduling C.2.f Results documents, reviewed, and followed-up