Advises That BNL Will Visit Util Ofcs on 901203 & Plant Site on 901204 to Gather Info Re Human Error Root Cause Analysis & Actions Taken to Prevent Recurrence of Important PRA-type Human Errors
ML16148A939
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 11/21/1990
From: Wiens L
Office of Nuclear Reactor Regulation
To: Tuckman M
DUKE POWER CO.
References
NUDOCS 9011290247
Download: ML16148A939 (4)


Text

'

-November 21, 1990 Docket Nos.

50-269, 50-270 and 50-287 Mr. M.S. Tuckman Vice President Nuclear Operations Duke Power Company P.O. Box 1007 Charlotte, North Carolina 28201-1007

Dear Mr. Tuckman:

SUBJECT:

BNL VISIT TO DUKE POWER COMPANY, DECEMBER 3 - 4, 1990 This is to inform you that on December 3, 1990, Messrs. James C. Higgins and See-Meng Wong of the Brookhaven National Laboratory will visit the Duke Power Company offices in Charlotte, N.C., followed by a short visit to the Oconee Nuclear Station on December 4. The purpose of this visit will be to gather information related to human error root cause analysis and actions taken to prevent recurrence of important PRA-type human errors. Details of the type of information desired are included as an enclosure to this letter. Access to the protected area of the Oconee station should not be required. However, your support in providing the information requested would be appreciated.

If you have questions regarding this matter, contact me at (301) 492-0906.

Sincerely, Original signed by:

L.A. Wiens, Project Manager Project Directorate 11-3 Division of Reactor Projects-I/II Office of Nuclear Reactor Regulation

Enclosure:

As stated cc w/enclosure:

See next page Distribution:

Docket File NRC PDR R. Ingram Local PDR L. Wiens PDII-3 R/F OGC 15/B/18 S. Varga 14/E/4 E. Jordan MNBB-3302 G. Lainas 14/H/3 ACRS (10)

P-315 D. Matthews Oconee R/F

,LA:PDII-3 P 4/P I I-3 eP 'I I 3

\\VRIngram

'Wiens DMatthews

\\\\ /,L0/90

. f,W/90

/t

/JA/90 OFFICIAL RECORD COPY Document Name: OCONEE VISIT O.,1129:0247 j01121 1

FP-315

Mr. M.S. Tuckman Oconee Nuclear Station Duke Power Company Units Nos. 1, 2 and 3 cc:

Mr. A.V. Carr, Esq.

Mr. Stephen Benesole Duke Power Company Duke Power Company 422 South Church Street Post Office Box 1007 Charlotte, North Carolina 28242-0001 Charlotte, North Carolina 28201-1007 J. Michael McGarry, III, Esq.

Bishop, Cook, Purcell & Reynolds Mr. Alan R. Herdt, Chief 1400 L Street, N.W.

Project Branch #3 Washington, D.C. 20005 U.S. Nuclear Regulatory Commission 101 Marietta Street, NW, Suite 2900 Mlr. Robert B. Borsum Atlanta, Georgia 30323 Babcock & Wilcox Nuclear Power Division Ms. Karen E. Long Suite 525 Assistant Attorney General 1700 Rockville Pike N. C. Department of Justice Rockville, Maryland 20852 P.O. Box 629 Raleigh, North Carolina 27602 Manager, LIS NUS Corporation Mr. R.L. Gill, Jr.

2650 McCormick Drive Nuclear Production Department Clearwater, Florida 34619-1035 Duke Power Company P.O. Box 1007 Senior Resident Inspector Charlotte, North Carolina 28201-1007 U.S. Nuclear Regulatory Commission Route 2, Box 610 Seneca, South Carolina 29678 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street, N.W., Suite 2900 Atlanta, Georgia 30323 Mr. Heyward G. Shealy, Chief Bureau of Radiological Health South Carolina Department of Health and Environmental Control 2600 Bull Street Columbia, South Carolina 29201 Office of Intergovernmental Relations 116 West Jones Street Raleigh, North Carolina 27603 County Supervisor of Oconee County Walhalla, South Carolina 29621

ENCLOSURE PROJECED DIFORMATION AND PERSONNEL NEEDS FOR BNL VISIT TO DUKE POWER COMPANY, DECEM R 3-4,1990 Two people from BNL will visit Duke Power. They are:

James C. Higgins See-Meng Wong On December 3, 1990, they will go to Charlotte offces.

On December 4, 1990, they will go to the Oconee site.

The purpose of this visit is to collect information for the root cause project currently underway at BNL.

This project is Task 3 of FIN L-1170, which is sponsored by the Risk Applications Branch of NRR, NRC.

Earlier reports from related projects were published; namely, NUREG/CR-5319 and NUREO/CR-5527.

I.

Information Needs We desire to obtain information from Duke Power Company on all actions and activities taken to prevent important PRA-type human errors. This could include training, methods, procedures, administrative controls, etc.

It should also include corrective actions taken for actual event occurrences. Some examples of information to be reviewed are:

1)

Samples of Oconee PIR forms for reportable and non-reportable events.

2)

Root cause analysis methods to determine recurring events/problems, data trends associated with root causes and corrective actions taken to prevent problems.

3)

Lists of accident scenarios and descriptions, prioritized by PRA analysis, used in simulator training; results of crew response and follow-through on further training sessions.

4)

Upgraded EOP examples resulting from insights on crew response data of simulator training program and other PRA feedback,

5)

Data summaries of human-caused reactor scrams/ESF actuations (if available as separate data).

6)

List of important human errors in new Oconee PRA, their HEPs and description of use in simulator training to reduce HEP. Discussion of differences between new Oconee PRA and NSAC-60.

7)

Discussion with HPES knowledgeable person for Oconce.

8)

Discussion of training as It relates to risk significant errors,

9)

Administrative controls in place to preclude typical PRA human errors; e.g., valves left in Incorrect positions, miscalibration, failure to follow procedures during transient or accident.

II.

Anticipated Areas and Types of Personnel for Discussions

1)

Charlotte:

PRA, PIR system, Root Cause and Trending, Feedback of PRA and problem information to site, QA, Accident Strategies.

2)

Site: IPES, Training, Operations/Administrative Controls, Procedures.

We would prefer to have a short visit to the Charlotte offices and the Oconee site to discuss the information, and then bring back documents for review at BNL. We are willing to share our information (e.g., Root Cause Scheme) with Duke Power Company.