ML16148A364

From kanterella
Jump to navigation Jump to search
Forwards LER 80-015/03L-0
Date released: 12/24/2019 Download: ML16148A364


Forwards LER 80-015/03L-0
ML19344B583
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 10/16/1980
From: Parker W
DUKE POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19344B583 (2)
LER 80-015/03L-0:on 800916,valve 2LP21 Failed to Open During Performance of Engineered Safeguard Channel Test.Caused by Loose Setscrew on Motor Driven Pinion.Screw Repaired
ML16148A363
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 10/16/1980
From: Jackie Jones
DUKE POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML16148A363 (2)