ML16138A759
| ML16138A759 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 05/18/1993 |
| From: | Lainas G Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML16138A760 | List: |
| References | |
| NUDOCS 9305240156 | |
| Download: ML16138A759 (8) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 DUKE POWER COMPANY DOCKET NO. 50-269 OCONEE NUCLEAR STATION, UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 200 License No. DPR-38
- 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment to the Oconee Nuclear Station, Unit 1 (the facility) Facility Operating License No. DPR-38 filed by the Duke Power Company (the licensee) dated May 5, 1993, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations as set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2.
Accordingly, the license is hereby amended by page changes to the Technical Specifications as indicated in the attachment to this license amendment, and Paragraph 3.B of Facility Operating License No. DPR-38 is hereby amended to read as follows:
9305240156 930516 PDR ADOCK 0500D P
-2 Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 200, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
- 3.
This license amendment is effective as of its date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Gus C. Lainas, Assistant Director for Region II Reactors Division of Reactor Projects -
I/II Office of Nuclear Reactor Regulation
Attachment:
Technical Specification Changes Date of Issuance:
May 18, 1993
0 sUNITED STATES 0
NUCLEAR REGULATORY COMMISSION o
WASHINGTON, D. C. 20555 DUKE POWER COMPANY DOCKET NO. 50-270 OCONEE NUCLEAR STATION, UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 200 License No. DPR-47
- 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment to the Oconee Nuclear Station, Unit 2 (the facility) Facility Operating License No. DPR-47 filed by the Duke Power Company (the licensee) dated May 5, 1993, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations as set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2.
Accordingly, the license is hereby amended by page changes to the Technical Specifications as indicated in the attachment to this license amendment, and Paragraph 3.B of Facility Operating License No. DPR-47 is hereby amended to read as follows:
-2 Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 200, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications.
- 3.
This license amendment is effective as of its date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Gus C. Lainas, Assistant Director for Region II Reactors Division of Reactor Projects -
I/II Office of Nuclear Reactor Regulation
Attachment:
Technical Specification Changes Date of Issuance:
May 18, 1993
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 07 DUKE POWER COMPANY DOCKET NO. 50-287 OCONEE NUCLEAR STATION, UNIT 3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.
197 License No. DPR-55
- 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment to the Oconee Nuclear Station, Unit 3 (the facility) Facility Operating License No. DPR-55 filed by the Duke Power Company (the licensee) dated May 5, 1993, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations as set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2.
Accordingly, the license is hereby amended by page changes to the Technical Specifications as indicated in the attachment to this license amendment, and Paragraph 3.B of Facility Operating License No. DPR-55 is hereby amended to read as follows:
-2 Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 197, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications.
- 3.
This license amendment is effective as of its date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Gus C. Lainas, Assistant Director for Region II Reactors Division of Reactor Projects -I/II Office of Nuclear Reactor Regulation
Attachment:
Technical Specification Changes Date of Issuance:
May 18, 1993
ATTACHMENT TO LICENSE AMENDMENT NO.200 FACILITY OPERATING LICENSE NO. DPR-38 DOCKET NO. 50-269 AND TO LICENSE AMENDMENT NO.200 FACILITY OPERATING LICENSE NO. DPR-47 DOCKET NO. 50-270 AND TO LICENSE AMENDMENT NO. 197 FACILITY OPERATING LICENSE NO. DPR-55 DOCKET NO. 50-287 Replace the following page of the Appendix "A" Technical Specifications with the enclosed page. The revised page is identified by Amendment number and contains vertical lines indicating the areas of change.
Remove Page Insert Page 4.7-1 4.7-1
4.7 REACTOR CONTROL ROD SYSTEM TESTS 4.7.1 Control Rod Trip Insertion Time Test Applicability Applies to the surveillance of the control rod trip insertion time.
Objective To assure the control rod trip insertion time is within that used in the safety analyses.
Specification The control rod insertion time shall be measured at either full flow or no flow conditions as follows:
- a.
For all rods following each removal of the reactor vessel head,
- b.
For specifically affected individual rods following any maintenance on or modification to the control rod drive system which could affect the drop time of those specific rods, and
- c.
For all rods at least once following each refueling outage.
The maximum control rod trip insertion time for an operable control rod drive mechanism, except for the Axial Power Shaping Rods (APSRs),
from the fully withdrawn position to 3/4 insertion (104 inches travel) shall not exceed 1.66*
seconds at reactor coolant full flow conditions or 1.40 seconds for no flow conditions.
For the APSRs it shall be demonstrated that loss of power will not cause rod movement.
If the trip insertion time above is not met, the rod shall be declared inoperable.
For Unit 1 Cycle 15, Group 1, Rod 8 and Group 2, Rod 5 may be considered operable with an insertion time 5 2.00 sec provided:
- 1) the average insertion time for the remaining rods in Groups 1 and 2 is 5 1.50 sec, and
- 2) the core average negative reactivity insertion rate is within the assumptions of the safety analysis.
Bases The control rod trip insertion time is the total elapsed time from power interruption at the control rod drive breakers until the control rod has completed 104 inches of travel from the fully withdrawn position.
The specified trip time is based upon the safety analysis in FSAR Chapter 15.
A rod is considered inoperable if the trip insertion time is greater than the specified allowable time or the core average negative reactivity insertion rate is less than the assumptions of the safety analysis.
REFERENCES (1)
FSAR, Section 15 (2)
Technical Specification 3.5.2 4.7-1 Amendment No.
200 (Unit 1)
OCONEE UNITS 1, 2, AND 3 Amendment No.
200 (Unit 2)
Amendment No.
197 (Unit 3)