UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555 DUKE POWER COMPANY DOCKET NO. 50-269 OCONEE NUCLEAR STATION, UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.196 License No. DPR-38
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment to the Oconee Nuclear Station, Unit 1 (the facility) Facility Operating License No. DPR-38 filed by the Duke Power Company (the licensee) dated May 20, 1992, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations as set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is hereby amended by page changes to the Technical Specifications as indicated in the attachment to this license amendment, and Paragraph 3.B of Facility Operating License No. DPR-38 is hereby amended to read as follows:
9209080181 920926 1I PDR. ADOCK 05000269 p
PDRLL
-2 Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 196, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
- 3. This license amendment is effective as of its date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION David B. Matthews, Director Project Directorate 11-3 Division of Reactor Projects-I/II Office of Nuclear Reactor Regulation
Attachment:
Technical Specification Changes Date of Issuance:
August 26, 1992
%.!jjkREGu,4 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555 DUKE POWER COMPANY DOCKET NO. 50-270 OCONEE NUCLEAR STATION, UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.196 License No. DPR-47
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment to the Oconee Nuclear Station, Unit 2 (the facility) Facility Operating License No. DPR-47 filed by the Duke Power Company (the licensee) dated May 20, 1992, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations as set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is hereby amended by page changes to the Technical Specifications as indicated in the attachment to this license amendment, and Paragraph 3.B of Facility Operating License No. DPR-47 is hereby amended to read as follows:
-2 Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.196, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications.
- 3. This license amendment is effective as of its date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION David B. Matthews, Director Project Directorate 11-3 Division of Reactor Projects-I/II Office of Nuclear Reactor Regulation
Attachment:
Technical Specification Changes Date of Issuance:
August 26, 1992
d-tjp REG~j 0
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2055 DUKE POWER COMPANY DOCKET NO. 50-287 OCONEE NUCLEAR STATION, UNIT 3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 193 License No. DPR-55
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment to the Oconee Nuclear Station, Unit 3 (the facility) Facility Operating License No. DPR-55 filed by the Duke Power Company (the licensee) dated May 20, 1992, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations as set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is hereby amended by page changes to the Technical Specifications as indicated in the attachment to this license amendment, and Paragraph 3.8 of Facility Operating License No. DPR-55 is hereby amended to read as follows:
-2 Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.193, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications.
- 3. This license amendment is effective as of its date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION David B. Matthews, Director Project Directorate 11-3 Division of Reactor Projects-I/II Office of Nuclear Reactor Regulation
Attachment:
Technical Specification Changes Date of Issuance:
August 26, 1992
ATTACHMENT TO LICENSE AMENDMENT NO. 196 FACILITY OPERATING LICENSE NO. DPR-38 DOCKET NO. 50-269 AND TO LICENSE AMENDMENT NO.196 FACILITY OPERATING LICENSE NO. DPR-47 DOCKET NO. 50-270 AND TO LICENSE AMENDMENT NO.193 FACILITY OPERATING LICENSE NO. DPR-55 DOCKET NO. 50-287 Replace the following page of the Appendix "A" Technical Specifications with the enclosed page. The revised page is identified by Amendment number and contains vertical lines indicating the areas of change.
Remove Page Insert Page 3.7-4 3.7-4
- 2.
The conditions of Table 3.7-1 for degraded operation are satisfied for the affected functional units.
In any event, if the reactor is subcritical, the inoperable circuit(s) or channel(s) shall be restored to operability and the conditions of Table 3.7-1 for normal operation shall be satisfied for all functional units before the reactor is returned to criticality.
(c)
One 4160 volt main feeder bus may be inoperable for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
(d)
One complete single string (i.e., 4160 volt switchgear (TC, TD, or TE),
600 volt load center, (X8, X9, or X10), 600-208 volt MCC (XS1, XS2, or XS3), and their loads) of each unit's 4160 volt Engineered Safety Features Power System may be inoperable for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
(e)
One or more of the following DC distribution components may be in operable for periods not exceeding 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />' (except as noted in 3.7.2(g) below):
- 1.
One complete single string or single component (i.e., 125VDC battery, charger, distribution center, and panelboards) of the 125VDC 230KV Switching Station Power System.
- 2.
One complete single string or single component (i.e., 125VDC battery, charger, and distribution center) of the Keowee 125VDC Power System may be inoperable provided the remaining string of the Keowee 125 VDC Power System is operable and electrically connected to an operable Keowee hydro unit.
- 3.
One complete single string or single component (i.e., 125VDC battery, charger, distribution center, and associated isolating and transfer diodes) of any units 125VDC Instrumentation and Control Power System. Only one battery more than the number allowed to be inoperable per 3.7.1 (f) for the Station may be removed from service under this paragraph.
- 4.
One 125 VDC instrumentation and control panelboard and its associated loads, per unit, provided that no additional AC buses are made inoperable beyond the provisions of 3.7.2(a), (c), and (d), and provided that the conditions of Table 3.7-1 for normal operation are satisfied for all functional units of the EPSL before the 125 VDC instrumentation and control panelboard becomes inoperable. Additionally, the provisions of 3.7.2.(h) must be observed for the 120 VAC vital instrumentation power panelboard which is powered by the affected 125 VDC panelboard.
(f)
For periods not to exceed 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> each unit's 125 VDC system may be separated from its backup unit via the isolating and transfer diodes.
(g)
One battery each, from one or more of the following 125VDC systems may be simultaneously inoperable for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in order to perform an equalizer charge after the surveillance requirements of Specification 4.6.10 or performance test:
Amendment No.196 (Unit 1)
Oconee -
Units 1, 2, & 3 3.7-4 Amendment No.196 (Unit 2)
Amendment No.193 (Unit 3) 1One 230kV switchyard battery and associated distribution center may be inoperable for 7 days for its respective battery replacement modification.