ML16134A533
| ML16134A533 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 06/10/1997 |
| From: | Zimmerman R NRC (Affiliation Not Assigned) |
| To: | Collins S NRC (Affiliation Not Assigned) |
| Shared Package | |
| ML16134A534 | List: |
| References | |
| IEB-80-04, IEB-80-4, NUDOCS 9706120322 | |
| Download: ML16134A533 (2) | |
Text
June 10, 1997 MEMORANDUM TO:
Samuel J. Collins, Director Office of Nuclear Reactor Regulation FROM:
Roy P. Zimmerman, Associate Director for Projects
SUBJECT:
FOLLOW-UP ACTIONS TO NRR DPV REVIEW PANEL ON THE.
IMPLEMENTATION OF BULLETIN 80-04 AT OCONEE By September 23, 1996, memorandum from the Director, NRR on the same subject, ADP was assigned to respond to the following recommendations by June 1997:
(4) Staff guidance and training be provided for the following process lessons learned:
Implementing modifications prior to submitting technical specification amendments is not an acceptable practice.
Appropriately documenting the basis for regulatory decisions and technical reviews.
Tom Altxion, PD IV-1 was assigned to these items. He drafted two proposed sections to be added to the PM handbook. These drafts were reviewed by the PM/PD advisory panel (their comments were incorporated), the ET members (no comments were received), and approved by the DRPE and DRPW Division Directors.
The final versions have been added to the PM handbook (see the attached note).
In addition, Tom briefed the PMs on these new sections in a PM workshop meeting on May 14, 1997. Accordingly, ADP's response to these two actions is complete.
Attachment:
Note to J. Roe, from C. Carpenter DISTRIBUTION:
Central File MThadani PUBLIC MBoyle (MLB4)
PDIV-1 r/f NRR Mail Room TAlexion NOlson CHawes THarris CCarpenter TGwynn, RIV WBeckner EAdensam (EGA1)
JRoe FMiragia RZimmerman KBohrer Document Name:
ST960215.YEL OFC PM/P
,-LA/PD4-1 TA/DRPW D/PD4-1 D/DRPW AD/ApP fo NAME TAlexi CHawes CCarpent WBe n JR R
rman DATE
,/9/97 (l'/97 6/ 3/97 6//
//97
&/
/97 COPY YES NO YES/NO YES/NO YES/NO YES/NO YES/NO OFFICIAL RECORD COPY 9706120322 970610
.PDR ADOCK 05000269 Q.
1 UNITED STATES 0
-NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-001 June 10, 1997 MEMORANDUM TO: Samuel J. Collins, Director Office of Nuclear Reactor Regulation FROM:
Roy P. Zimmerma s sat& Director for Projects UJ
SUBJECT:
FOLLOW-UP ACTIONS TO NRR DPV REVIEW PANEL ON THE IMPLEMENTATION OF BULLETIN 80-04 AT OCONEE By September 23, 1996, memorandum from the Director, NRR on the same subject, ADP was assigned to respond to the following recommendations by June 1997:
(4) Staff guidance and training be provided for the following process lessons learned:
Implementing modifications prior to submitting technical specification amendments is not an acceptable practice.
Appropriately documenting the basis for regulatory decisions and technical reviews.
Tom Alexion, PD IV-1 was assigned to these items. He drafted two proposed sections to be added to the PM handbook. These drafts were reviewed by the PM/PD advisory panel (their comments were incorporated), the ET members (no comments were received), and approved by the DRPE and DRPW Division Directors.
The final versions have been added to the PM handbook (see the attached note).
In addition, -Tom briefed the PMs on thesem-ew sections in a-PM workshop meeting on May14, 1997.
Accordingly, ADP's response-to these-two actions is complete.
Attachment:
Note to J. Roe, from C. Carpenter