ML16132A494
| ML16132A494 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 04/26/2016 |
| From: | Jarrell J Entergy Operations |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML16132A496 | List: |
| References | |
| W3F1-2016-0038 | |
| Download: ML16132A494 (2) | |
Text
~Entergy W3F1-2016-0038 April26,2016 U.~, Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
Subject:
Annual Radiological Effluent Release Report -2015 Waterford Steam Electric Station, Unit 3 (Waterford 3)
Docket No. 50-382 License No. NPF-38
Dear Sir or Madam:
Entergy Operations, Inc.
17265 River Road Killona, LA 70057-3093 Tel 504 739 6685 Fax 504 739 6698 iiarrel@.enterav.com John P. Jarrell Ill Manager - Regulatory Assurance Waterford 3 Attached is the Annual Radiological Effluent Release Report for the period of January 1 through December 31, 2015, which includes a copy of the revised Offsite Dose Calculation Manual (ODCM). This report is submitted pursuant to the requirements of Waterford 3 Technical Specification Sections 6.9.1.8 and 6.14.2.c.
This report contains no new commitments. Please contact John P. Jarrell, Regulatory Assurance Manager, at (504) 739-6685 if you have questions regarding this information.
JPJ/LLB
Enclosure:
Annual Radiological Effluent Release Report - 2015 (Including DVD)
W3F1-2016-0038 Page2 cc:
Mr. Marc L. Dapas Regional Administrator U. S. Nuclear Regulatory Commission, Region IV RidsRgn4MailCenter@nrc.gov NRG Senior Resident Inspector Waterford Steam Electric Station Unit 3 Frances.Ramirez@nrc.gov Chris.Speer@nrc.gov NRC/NRR Project Manager for Waterford 3 April. Pulvirenti@nrc.gov Allyson Howie Entergy Legal, General Sr Counce!
AHowie@entergy.com Joe Sears Manager Nuclear Asset Protection SearsJT@inpo.org
~Entergy W3F1-2016-0038 April26,2016 U.~, Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
Subject:
Annual Radiological Effluent Release Report -2015 Waterford Steam Electric Station, Unit 3 (Waterford 3)
Docket No. 50-382 License No. NPF-38
Dear Sir or Madam:
Entergy Operations, Inc.
17265 River Road Killona, LA 70057-3093 Tel 504 739 6685 Fax 504 739 6698 iiarrel@.enterav.com John P. Jarrell Ill Manager - Regulatory Assurance Waterford 3 Attached is the Annual Radiological Effluent Release Report for the period of January 1 through December 31, 2015, which includes a copy of the revised Offsite Dose Calculation Manual (ODCM). This report is submitted pursuant to the requirements of Waterford 3 Technical Specification Sections 6.9.1.8 and 6.14.2.c.
This report contains no new commitments. Please contact John P. Jarrell, Regulatory Assurance Manager, at (504) 739-6685 if you have questions regarding this information.
JPJ/LLB
Enclosure:
Annual Radiological Effluent Release Report - 2015 (Including DVD)
W3F1-2016-0038 Page2 cc:
Mr. Marc L. Dapas Regional Administrator U. S. Nuclear Regulatory Commission, Region IV RidsRgn4MailCenter@nrc.gov NRG Senior Resident Inspector Waterford Steam Electric Station Unit 3 Frances.Ramirez@nrc.gov Chris.Speer@nrc.gov NRC/NRR Project Manager for Waterford 3 April. Pulvirenti@nrc.gov Allyson Howie Entergy Legal, General Sr Counce!
AHowie@entergy.com Joe Sears Manager Nuclear Asset Protection SearsJT@inpo.org