ML16131A724

From kanterella
Jump to navigation Jump to search

Acceptance Review: Limerick 1 & 2 - HPCI and RCIC Actuation Instrumentation Technical Specification Requirements - CACs MF7555 & MF7556
ML16131A724
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 05/10/2016
From: Richard Ennis
Plant Licensing Branch 1
To: Stewart G
Exelon Generation Co
Ennis R
References
CAC MF7555, CAC MF7556
Download: ML16131A724 (1)


Text

From: Ennis, Rick Sent: Tuesday, May 10, 2016 2:26 PM To: Glenn Stewart (glenn.stewart@exeloncorp.com)

Cc: David Helker

Subject:

Acceptance Review: Limerick 1 & 2 -HPCI and RCIC Actuation Instrumentation Technical Specification Requirements - CACs MF7555 &

MF7556

Glenn, By letter dated April 4, 2016 (ADAMS Accession No. ML16095A275), Exelon Generation Company, LLC submitted a license amendment request for Limerick Generating Station, Units 1 and 2. The proposed amendment would revise the high pressure coolant injection system and reactor core isolation system actuation instrumentation Technical Specification (TS) requirements.

The purpose of this e-mail is to provide the results of the NRC staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the TSs) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.

If you have any questions, please contact me at (301) 415-1420.

Richard B. Ennis, Senior Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-352 and 50-353