ML16127A285
| ML16127A285 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 02/10/1989 |
| From: | Ernst M NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Tucker H DUKE POWER CO. |
| Shared Package | |
| ML16127A288 | List: |
| References | |
| NUDOCS 8902270195 | |
| Download: ML16127A285 (3) | |
See also: IR 05000269/1989003
Text
,.CELERATED
DISTRIBUT]ON
DEMQON STAT]ON
SY.$WTE M
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
CESSION NBR:8902270195
DOC.DATE: 89/02/10 NOTARIZED: NO
DOCKET #
I
ACIL:50-269 Oconee Nuclear Station, Unit 1, Duke Power Co.
05000269
50-270 Oconee Nuclear Station, Unit 2, Duke Power Co.
05000270
50-287 Oconee Nuclear Station, Unit 3, Duke Power Co.
05000287
AUTH.NAME
AUTHOR AFFILIATION
ERNST,M.L.
Region 2, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
TUCKER,H.B.
Duke Power Co.
SUBJECT: Forwards Insp Repts 50-269/89-03,50-270/89-03 & 50-287/89-03
on 890104-13.No violations or deviations noted.
DISTRIBUTION CODE: IE01D
COPIES RECEIVED:LTR L ENCL
_ SIZE:
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response
S
NOTES:
RECIPIENT
COPIES
RECIPIENT
COPIES
A
ID CODE/NAME
LTTR ENCL
ID CODE/NAME
LTTR ENCL
PD2-3 PD
1
1
PASTIS,H
1
1
D
INTERNAL: ACRS
2
2
1
1
AEOD/DEIIB
1
1
DEDRO
1
1
NRR SHANKMAN,S
1
1
NRR/DEST DIR
1
1
S
NRR/DLPQ/PEB 11
1
1
NRR/DLPQ/QAB 10
1
1
NRR/DOEA DIR 11
1
1
NRR/DREP/EPB 10
1
1
NRR/DREP/RPB 10
2
2
NRR/DRIS DIR 9A
1
1
NRR/PMAS/ILRB12
1
1
NUDOCS-ABSTRACT
1
.1
OE LIEBERMAN,J
1
1
OGC/HDS2
1
1
02
1
1
RGN2
FILE
01
1
1
EXTERNAL: LPDR
1
1
NRC PDR
1
1
1
1
IR
S
NTE TO ALL "RIDS" RECIPIENTS:
5
PLEASE HELP US TO REJUC
WASTE!
CDrACT ThE DOCUMELY OIROL DESK,
ROOM P1-37 (EXT.
20079) I0 EIMINAT
YOUR
ME FRCM DISTRIBUTION
LISTS FOR DOCUMTS YOU DON' T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR
25
ENCL
25
FEB 1 U 1989
Docket Nos. 50-269, 50-270, 50-287
License Nos. DPR-38, DPR-47, DPR-55
Duke Power Company
ATTN:
Mr. H. B. Tucker, Vice President
Nuclear Production Department
422 South Church Street
Charlotte, NC 28242
Gentlemen:
SUBJECT:
INSPECTION REPORT NOS. 50-269/89-03, 50-270/89-03 AND 50-287/89-03
This refers to the NRC inspection conducted by an Augmented Inspection Team
(AIT) on January 4 - 13, 1989. The inspection included a review of activities
authorized for your Oconee facility. At the conclusion of the inspection, the
findings were discussed with those members of your staff identified in the
enclosed inspection report.
Areas examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, and interviews with personnel.
Within the scope of the inspection,
no violations or deviations were
identified.
Your attention is invited to the unresolved items identified in the inspection
report. These matters will be pursued during future inspections.
The AIT found that your plant's staff and management actions were appropriate
during the recovery from the reactor trip of January 2 and the plant recovery
from the fire of January 3.
There are several items which remain to be
resolved and are highlighted in the report.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
0f
Duke Power Company
2
Should you have any questions concerning this letter, please contact us.
Sincerely,
Maliolm L. Ernst
Acting Regional Administrator
Enclosure:
Inspection Report
cc w/encl:
M. S. Tuckman, Station Manager
State of South Carolina
bcc w/encl:
NRC Resident Inspector
DRS Technical Assistant
H. Pastis, NRR
e
Document Control Desk
RII
RII
RI
RI
R
\\RII
BBonser
T46bles
eyes
AGi
G
n
2,
/89
2/ /89
//89
2/. /89
2/1/89