ML16127A275

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-269/88-35,50-270/88-35 & 50-287/88-35 on 881217-890116 & Notice of Deviation.Violation Identified in Insp Rept Under Consideration for Escalated Enforcement Action.Enforcement Conference Scheduled for 890210
ML16127A275
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 02/03/1989
From: Ernst M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tucker H
DUKE POWER CO.
Shared Package
ML16127A278 List:
References
NUDOCS 8902150126
Download: ML16127A275 (3)


See also: IR 05000269/1988035

Text

ACCELERATED

DIETRIBUTION

DEMONSTRATION

SYSTEM

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

.ESSION NBR:8902150126

DOC.DATE: 89/02/03, NOTARIZED: NO

DOCKET #

CIL:50-269 Oconee Nuclear Station, Unit 1, Duke Power Co.

05000269

50-270 Oconee Nuclear Station, Unit 2, Duke Power Co.

05000270

50-287 Oconee Nuclear Station, Unit 3, Duke Power Co.

05000287

AUTH.NAME

AUTHOR AFFILIATION

ERNST,M.L.

Region 2, Ofc of the Director

RECIP.NAME

RECIPIENT AFFILIATION

TUCKER,H.B.

Duke Power Co.

SUBJECT: Forwards Insp Repts 50-269/88-25,50-270/88-35 & 50-287/88-35

on 881217-890116 & notice of deviation.

DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR

ENCL

SIZE:

Lz

TITLE: General (50 Dkt)-Insp Rept/Notice of Vidlation Response

[

NOTES:

RECIPIENT

COPIES

RECIPIENT

COPIES

A

ID CODE/NAME

LTTR ENCL

ID CODE/NAME

LTTR ENCL

PD2-3 PD

1

1

PASTIS,H

1

1

D

INTERNAL: ACRS

2

2

AEOD

1

1

D

AEOD/DEIIB

1

1

DEDRO

1

1

NRR SHANKMAN,S

1

1

NRR/DEST DIR

1

1

5

NRR/DLPQ/PEB 11

1

1

NRR/DLPQ/QAB 10

1

1

NRR/DOEA DIR 11

1

1

NRR/DREP/EPB 10

1

1

NRR/DREP/RPB 10

2

2

NRR/DRIS DIR 9A

1

1

NRR/PMAS/ILRB12

1

1

NUDOCS-ABSTRACT

1

1

OE.

IEB RMAN,J

1

1

OGC/HDS2

1

1

FIL

02

1

1

RGN2

FILE

01

1

1

EXTERNAL: LPDR

1

1

NRC PDR

1

1

NSIC

1

1

R

D

S

A

D

D

NOTE TO ALL "RIES" RECIPIENTS:

PLEASE HELP US TOI REDUCE HASTE!

ODNTACT THE DMENT CTRL DESK,

ROOM P1-37 (EXr. 20079) TO ELIMINATE YOUR NAME FRM DISTRBUIN

LISTS FOR DOCUMEMPS YOU DON'T NEE!

TOTAL NUMBER OF COPIES REQUIRED: LTTR

25 ENCL

25

Doc;et Nos.

50-269,

50-270, 50-287

License Nos. DPR-38,

DPR-47, DPP-55

Du.s Power Company

,/ATTN:

Mr. H. B. Tucker, Vice President

Nuclear Production Department

422 South Church Street

Charlotte, NC

28242

Gentlemen:

SU'BJECT:

NOTICF OF DEVIATION

(NRC

INSPECTION REPORT NOS. 50-269/88-35, 50-270/88-35 AND 50-287/

Thic refers to the NRC inspection conducted by the resident inspectors on

December 17,

1988 -

January 16,

1989.

The inspection included a review of

activities authorized for your Oconee facility.

At the conclusion of the

.

inspection,

the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report.

Within

these areas, .the inspection consisted of selective examinations of procedures

and representative records,

interviews with personnel,

and observation of

activities in progress.

The inspection findircs indicate that certain activities appeared -to violate

NRC requirements. The violation described in the enclosed Inspection Report is

under consideration for escalated enforcement action.

Accordingly, no Notice

of Violation is being issued at this time. However, please be advised that the

number and characterization of violations described in the enclosed Inspection

Report may change as a result of further NRC review. An Enforcement Conference

to discuss this violation has been scheduled for Feburary 10, 1989.

You will

be advised by separate correspondence of the results of our deliberations on

this matter.

Other activities appeared to deviate from a commitment to the NRC. The deviation

with pertinent references and elements to be included in your response is

described in the enclosed Notice.

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10, Code of Federal Regulations., a copy of this letter and its enclosures

will be placed in the NRC Public Document Room.

The responses directed by this letter and its enclosures are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

F'FIR

17.

Nuv cear Production Department

2

FEB U

z

!3oz

Shoulc you have any questions concerning this letter, please contact us.

Sincerely,

M 1colm L. Ernst

Acting Regional Administrator

Enclosures:

1. Notice of Violation

2. NRC Inspection Report

3. Enclosure 1

cc w/encls:

fM. S. Tuckmar, Station Manager

State of Soutth Carc ina

bec w/encls:

.'NRC Resident Inspector

Document Cont-ol Desk

H. Pastis, NRR

RI

RII

RI K

RII

,Peeles:tj

VBrd'wnlee

eyes

JStjr

01/

/89

01/

/89

/

/89

4/89

Al/.

~