ML16127A215
| ML16127A215 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 08/23/1988 |
| From: | Brownlee V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Tucker H DUKE POWER CO. |
| Shared Package | |
| ML16127A216 | List: |
| References | |
| NUDOCS 8809070075 | |
| Download: ML16127A215 (3) | |
See also: IR 05000269/1988020
Text
d' ACCELERATED
DISTRIBUTION
DEMONSTRATION
SYSTEM
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
SSION NBR:8809070075
DOC.DATE: 88/08/23
NOTARIZED: NO
DOCKET #
FACIL:50-269 Oconee Nuclear Station, Unit 1, Duke Power Co.
05000269
50-270 Oconee Nuclear Station, Unit 2, Duke Power Co.
05000270
50-287 Oconee Nuclear Station, Unit 3, Duke Power Co.
05000287
AUTH.NAME
AUTHOR AFFILIATION
BROWNLEE,V.L.
Region 2, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
TUCKER,H.B.
Duke Power Co.
SUBJECT: Forwards Insp Repts 50-269/88-20,50-270/88-20 & 50-287/88-20
on 880718-0815.No violations or deviations noted.
DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR
ENCL
SIZE:
D
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation
esponse
NOTES:AEOD/Ornstein:lcy.
05000269 S
AEOD/Ornstein:lcy.
05000270
AEOD/Ornstein:lcy.
05000287 /
A
RECIPIENT
COPIES
RECIPIENT
COPIES
ID CODE/NAME
LTTR ENCL
ID CODE/NAME
LTTR ENCL
D
PD2-3 PD
1
1
PASTIS,H
2
2
INTERNAL: ACRS
2
2
1
1
D
DEDRO
1
1
-
NRR MORISSEAU,D
1
1
NRR/DLPQ/PEB 11
1
1
NRR/DLPQ/QAB 10
1
1
NRR/DOEA DIR 11
1
1
NRR/DREP/EPB 10
1
1
NRR/DREP/RPB 10
2
2
NRR/DRIS DIR 9A
1
1
NRR/PMAS/ILRB12
1
1
NUDOCS-ABSTRACT
1
1
OE LE
,
1
1
OGC/HDS2
1
1
E
02
1
1
RES/DSIR DEPY
1
1
E 01
1
1
EXTERNAL: LPDR
1
1
NRC PDR
1
1
1
1
NOTES:
1
1
R
I
A
D
D
TOTAL NUMBER OF COPIES REQUIRED: LTTR
26
ENCL
26
Docket Nos. 50-269, 50-270, 50-287
License Nos. DPR-38, DPR-47, DPR-55
Duke Power Company
ATTN:
Mr. H. B. Tucker, Vice President
Nuclear Production Department
422 South Church Street
Charlotte, NC 28242
Gentlemen:
SUBJECT:
INSPECTION REPORT NOS. 50-269/88-20, 50-270/88-20 AND 50-287/88-20
This refers to the NRC inspection conducted by the resident inspectors on
July 18 -
August 15, 1988. The inspection included a review of activities
authorized for your Oconee facility. At the conclusion of the inspection, the
findings were discussed with those members of your staff identified in the
enclosed inspection report.
Areas examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records,
interviews with personnel,
and observation of
activities in progress.
Within the scope of the inspection, no violations or deviations were identi
fied.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosures
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
ORGNL SIGNE Pr
y
VIRGIL L.
Virgil L. Brownlee, Chief
Reactor Projects Branch 3
Division of Reactor Projects
Enclosure:
NRC Inspection Report
cc w/encl:
M. S. Tuckman, Station Manager
bcc w/encl:
(See page 2)
88E09070075 %88082:3
ADOC__-K 05000)269
Duke Power Company
2
AUG 2 3 198
bcc w/encl:
NRC Resident Inspector
DRS Technical Assistant
H. Pastis, NRR
Document Control Desk
State of South Carolina
RI I
RII
08/cser
s0e8r
/
s
O8/c 3/88
0O8/2/88