ML16096A320
| ML16096A320 | |
| Person / Time | |
|---|---|
| Site: | Hatch, Vogtle, Farley |
| Issue date: | 04/05/2016 |
| From: | Michael Orenak Plant Licensing Branch II |
| To: | Joyce R Southern Nuclear Operating Co |
| References | |
| MF7460, MF7461, MF7462, MF7463, MF7464, MF7465 | |
| Download: ML16096A320 (2) | |
Text
1 NRR-PMDAPEm Resource From:
Orenak, Michael Sent:
Tuesday, April 05, 2016 2:42 PM To:
Joyce, Ryan M.
Cc:
McElroy, G. Ken; crpierce@southernco.com
Subject:
NRC Acceptance Review for the adoption of NEI 99-01, Revision 6, for the Emergency Actions Levels
- Ryan, By letter dated March 3, 2016, Southern Nuclear Operating Company (SNC) submitted a license amendment request for Joseph M. Farley Nuclear Plant (FNP), Units 1 and 2, Edwin I. Hatch Nuclear Plant, Units 1 and 2, and Vogtle Electric Generating Plant, Units 1 and 2 (ADAMS Accession No. ML16071A108; TAC Nos.
MF7460, MF7461, MF7462, MF7463, MF7464 and MF7465) to adopt NEI 99-01, Revision 6, "Development of Emergency Action Levels for Non-Passive Reactors," to replace the Emergency Action Level schemes for the facilities above that are currently based on Revision 4. Additionally, SNC proposed changes to the FNP Steam Generator Relief & Safety Valve Monitoring System radiation monitors RE-60A, RE-60B, and RE-60C, and the Turbine Driven Auxiliary Feedwater Pump Steam Exhaust Monitoring System radiation monitor RE-60D. The purpose of this e-mail is to provide the results of the U.S.
Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
If you have any questions, please contact me.
Michael D. Orenak Hatch Project Manager NRR - Division of Operating Reactor Licensing Phone: 301-415-3229 e-mail: Michael.Orenak@nrc.gov
Hearing Identifier:
NRR_PMDA Email Number:
2756 Mail Envelope Properties (Michael.Orenak@nrc.gov20160405144100)
Subject:
NRC Acceptance Review for the adoption of NEI 99-01, Revision 6, for the Emergency Actions Levels Sent Date:
4/5/2016 2:41:52 PM Received Date:
4/5/2016 2:41:00 PM From:
Orenak, Michael Created By:
Michael.Orenak@nrc.gov Recipients:
"McElroy, G. Ken" <GKMCELRO@southernco.com>
Tracking Status: None "crpierce@southernco.com" <crpierce@southernco.com>
Tracking Status: None "Joyce, Ryan M." <RMJOYCE@southernco.com>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 2382 4/5/2016 2:41:00 PM Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received:
1 NRR-PMDAPEm Resource From:
Orenak, Michael Sent:
Tuesday, April 05, 2016 2:42 PM To:
Joyce, Ryan M.
Cc:
McElroy, G. Ken; crpierce@southernco.com
Subject:
NRC Acceptance Review for the adoption of NEI 99-01, Revision 6, for the Emergency Actions Levels
- Ryan, By letter dated March 3, 2016, Southern Nuclear Operating Company (SNC) submitted a license amendment request for Joseph M. Farley Nuclear Plant (FNP), Units 1 and 2, Edwin I. Hatch Nuclear Plant, Units 1 and 2, and Vogtle Electric Generating Plant, Units 1 and 2 (ADAMS Accession No. ML16071A108; TAC Nos.
MF7460, MF7461, MF7462, MF7463, MF7464 and MF7465) to adopt NEI 99-01, Revision 6, "Development of Emergency Action Levels for Non-Passive Reactors," to replace the Emergency Action Level schemes for the facilities above that are currently based on Revision 4. Additionally, SNC proposed changes to the FNP Steam Generator Relief & Safety Valve Monitoring System radiation monitors RE-60A, RE-60B, and RE-60C, and the Turbine Driven Auxiliary Feedwater Pump Steam Exhaust Monitoring System radiation monitor RE-60D. The purpose of this e-mail is to provide the results of the U.S.
Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
If you have any questions, please contact me.
Michael D. Orenak Hatch Project Manager NRR - Division of Operating Reactor Licensing Phone: 301-415-3229 e-mail: Michael.Orenak@nrc.gov
Hearing Identifier:
NRR_PMDA Email Number:
2756 Mail Envelope Properties (Michael.Orenak@nrc.gov20160405144100)
Subject:
NRC Acceptance Review for the adoption of NEI 99-01, Revision 6, for the Emergency Actions Levels Sent Date:
4/5/2016 2:41:52 PM Received Date:
4/5/2016 2:41:00 PM From:
Orenak, Michael Created By:
Michael.Orenak@nrc.gov Recipients:
"McElroy, G. Ken" <GKMCELRO@southernco.com>
Tracking Status: None "crpierce@southernco.com" <crpierce@southernco.com>
Tracking Status: None "Joyce, Ryan M." <RMJOYCE@southernco.com>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 2382 4/5/2016 2:41:00 PM Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received: