NRR E-mail Capture - Acceptance Review: River Bend Station, Unit 1 License Amendment Request for Change to Milestone 8
ML16064A032
Person / Time
Site: River Bend Entergy icon.png
Issue date: 08/18/2015
From: Wang A
Plant Licensing Branch IV
To: Burmeister B
Entergy Nuclear Operations
References
MF6579
Download: ML16064A032 (2)


Text

NRR-PMDAPEm Resource From: Wang, Alan Sent: Tuesday, August 18, 2015 2:24 PM To: BURMEISTER, BARRY M; Joseph Clark (JCLARK@entergy.com)

Cc: Blechman, Paula

Subject:

Acceptance Review: River Bend Station, Unit 1 License Amendment Request for Change to Milestone 8 (TAC No. MF6579)

Barry and Joey, The U.S. Nuclear Regulatory Commission (NRC) staff has completed the acceptance review for the amendment request dated June 29, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15188A369), from Entergy Operations, Inc. (Entergy, the licensee), for the River Bend Station, Unit No. 1 (RBS). The license amendment request (LAR) proposes to revise the RBS Cyber Security Plan Milestone 8 implementation date.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested and follow as far as applicable, the form prescribed for original applications. Section 10 CFR 50.34 addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concludes that sufficient technical information is available to complete a detailed review. The NRC staff will make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.

If you have any questions, please contact Alan Wang at (301) 415-1445.

Alan Wang Project Manager (Grand Gulf and River Bend)

NRR/DORL/PD IV-2 (301) 415-1445 1

Hearing Identifier: NRR_PMDA Email Number: 2686 Mail Envelope Properties (Alan.Wang@nrc.gov20150818142300)

Subject:

Acceptance Review: River Bend Station, Unit 1 License Amendment Request for Change to Milestone 8 (TAC No. MF6579)

Sent Date: 8/18/2015 2:23:45 PM Received Date: 8/18/2015 2:23:00 PM From: Wang, Alan Created By: Alan.Wang@nrc.gov Recipients:

"Blechman, Paula" <Paula.Blechman@nrc.gov>

Tracking Status: None "BURMEISTER, BARRY M" <BBURMEI@entergy.com>

Tracking Status: None "Joseph Clark (JCLARK@entergy.com)" <JCLARK@entergy.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 2077 8/18/2015 2:23:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

NRR-PMDAPEm Resource From: Wang, Alan Sent: Tuesday, August 18, 2015 2:24 PM To: BURMEISTER, BARRY M; Joseph Clark (JCLARK@entergy.com)

Cc: Blechman, Paula

Subject:

Acceptance Review: River Bend Station, Unit 1 License Amendment Request for Change to Milestone 8 (TAC No. MF6579)

Barry and Joey, The U.S. Nuclear Regulatory Commission (NRC) staff has completed the acceptance review for the amendment request dated June 29, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15188A369), from Entergy Operations, Inc. (Entergy, the licensee), for the River Bend Station, Unit No. 1 (RBS). The license amendment request (LAR) proposes to revise the RBS Cyber Security Plan Milestone 8 implementation date.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested and follow as far as applicable, the form prescribed for original applications. Section 10 CFR 50.34 addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concludes that sufficient technical information is available to complete a detailed review. The NRC staff will make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.

If you have any questions, please contact Alan Wang at (301) 415-1445.

Alan Wang Project Manager (Grand Gulf and River Bend)

NRR/DORL/PD IV-2 (301) 415-1445 1

Hearing Identifier: NRR_PMDA Email Number: 2686 Mail Envelope Properties (Alan.Wang@nrc.gov20150818142300)

Subject:

Acceptance Review: River Bend Station, Unit 1 License Amendment Request for Change to Milestone 8 (TAC No. MF6579)

Sent Date: 8/18/2015 2:23:45 PM Received Date: 8/18/2015 2:23:00 PM From: Wang, Alan Created By: Alan.Wang@nrc.gov Recipients:

"Blechman, Paula" <Paula.Blechman@nrc.gov>

Tracking Status: None "BURMEISTER, BARRY M" <BBURMEI@entergy.com>

Tracking Status: None "Joseph Clark (JCLARK@entergy.com)" <JCLARK@entergy.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 2077 8/18/2015 2:23:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: