IR 05000250/2016403
| ML16040A199 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 02/09/2016 |
| From: | Binoy Desai NRC/RGN-II/DRS/PSB2 |
| To: | Eck T Florida Power & Light Co |
| Linda Gruhler 404-997-4633 | |
| References | |
| IR 2016403 | |
| Download: ML16040A199 (4) | |
Text
February 9, 2016
SUBJECT:
TURKEY POINT NUCLEAR GENERATING STATION - U.S. NUCLEAR REGULATORY COMMISSION PHYSICAL SECURITY INSPECTION REPORT 05000250/2016403 AND 05000251/2016403
Dear Mr. Eck:
On January 28, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Turkey Point Nuclear Generating Station. The inspection covered one or more of the key attributes of the Security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report (IR) documents the inspection results that were discussed on January 28, 2016, with Mr. T. Summers and other members of your staff.
No NRC-identified or self-revealing findings were identified during this inspection.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public inspections, exemptions, requests for withholding of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS); accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
However, the material enclosed herein contains Security-Related Information in accordance with 10 CFR 2.390(d)(1), and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the Enclosure will not be made available electronically for public inspection in the NRC Public Document Room, or from the PARS component of NRCs ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1), and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
Sincerely,
/RA/
Binoy B. Desai, Chief Plant Support Branch 2 Division of Reactor Safety
Docket Nos. 50-250 and 50-251 License Nos. DPR-31 and DPR-41
Enclosure:
NRC IR 05000250/2016403 and 05000251/2016403, w/Attachment:
Supplementary Info (OUO)
cc: Distribution via Listserv
ML16040A199 SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS/PSB2 RII:DRS/PSB2 RII: DRS/PSB2 RII: DRP/BR3 RII:DRS/PSB2
SIGNATURE JPT JOB2 JOB2 for JCS3 LJB4 BBD
NAME J. Tornow J. Brown J. Shehee L. Suggs B. Desai
DATE 2/ 8 /2016 2/ 8 /2016 2/ 9 /2016 2/ 8 /2016 2/ 9 /2016
E-MAIL COPY YES NO YES NO YES NO YES NO YES NO cc:
Thomas Summers Site Vice President Turkey Point Nuclear Generating Station Florida Power & Light Company 9760 SW 344th Street Florida City, FL 33035
Robert Bitner Nuclear Fleet Security Florida Power & Light Company 700 Universe Boulevard Juno Beach, FL 33408-0420
Mitch Guth Licensing Manager Turkey Point Nuclear Generating Station Florida Power & Light Company 9760 SW 344th Street Florida City, FL 33035
Mano Nazar President and Chief Nuclear Officer Nuclear Division NextEra Energy P.O. Box 14000 Juno Beach, FL 33408-0420