Response to Request for Additional Information Regarding ASME Section XI Inservice Inspection Program, Relief Requests for Limited Coverage Examinations Performed the Fourth 10-Year Inspection Interval
ML15358A005
Person / Time
Site: Millstone Dominion icon.png
Issue date: 12/18/2015
From: Mark D. Sartain
Dominion Nuclear Connecticut
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
15-582, CAC MF6567, CAC MF6568
Download: ML15358A005 (4)


Text

Doiio uc* ConctctIc 5000 Dominion Boulevard, Glen AIlen,.VA 23060 Dominion~E Web Address: www.dom.com December 18, 2015 U.S. Nuclear Regulatory Commission Serial No.15-582 Attention: Document Control Desk NLOS/WDC R0 Washington, DC 20555 Docket No. 50-336 License No. DPR-65 DOMINION NUCLEAR CONNECTICUT. INC.

MILLSTONE POWER STATION UNIT 2 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION REGARDING ASME SECTION XI INSERVICE INSPECTION PROGRAM RELIEF REQUESTS FOR LIMITED COVERAGE EXAMINATIONS PERFORMED IN THE FOURTH 10-YEAR INSPECTION INTERVAL (CAC NOS. MF6567 AND MF6568)

By letter dated July 30, 2015, Dominion Nuclear Connecticut, Inc. (DNC) submitted relief requests for limited coverage examinations performed in the first inspection period of the fourth 10-year inservice inspection interval for Millstone Power Station Unit 2 (MPS2). In an email dated December 3, 2015, the Nuclear Regulatory Commission (NRC) transmitted a request for additional information (RAI) to DNC related to Relief Requests RR-04-17 and RR-04-18. DNC agreed to respond to the revised RAI by January 4, 2016.

The attachment to this letter provides DNC's response to the NRC's RAI.

If you have any questions regarding this response, please contact Wanda Craft at (804) 273-4687.

Sincerely, Mark D. Sartain Vice President - Nuclear Engineering Commitments made in this letter: None

Attachment:

Response to Request for Additional Information Regarding ASME Section Xl Inservice Inspection Program Relief Requests for Limited Coverage Examinations Performed in the Fourth 10-Year Inspection IntervalAO (

Serial No.15-582 Docket No. 50-336 Page 2 of 2 cc: U.S. Nuclear Regulatory Commission Region I 2100 Renaissance Blvd, Suite 100 King of Prussia, PA 19406-2713 R. V. Guzman Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08-02 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station

Serial No.15-582 Docket No. 50-336 ATTACHMENT RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION REGARDING ASME SECTION XI INSERVICE INSPECTION PROGRAM RELIEF REQUESTS FOR LIMITED COVERAGE EXAMINATIONS PERFORMED IN THE FOURTH 10-YEAR INSPECTION INTERVAL DOMINION NUCLEAR CONNECTICUT, INC.

MILLSTONE POWER STATION UNIT 2

Serial No.15-582 Docket No. 50-336 Attachment, Page 1 of I By letter dated July 30, 2015, Dominion Nuclear Connecticut, Inc. (DNC) submitted relief requests for limited coverage examinations performed in the first inspection period of the fourth 10-year inservice inspection interval for Millstone Power Station Unit 2 (MPS2). In an email dated December 3, 2015, the Nuclear Regulatory Commission (NRC) transmitted a request for additional information (RAI) to DNC related to Relief Requests RR-04-17 and RR-04-18. This attachment provides DNC's response to the NRC's RAI.

Question 1 For Requests for Relief Nos. RR-04-1 7 and RR-04-18, please provide the non-destructive examination procedure used in the subject ultrasonic examinations (e.g.,

ASME Code,Section XI, Appendix VIII; or Section V, Article 4; or other).

DNC Response For the examinations addressed in Relief Request RR-04-17, the examination procedure was written in accordance with ASME Section XI, Appendix I and Section V, Article 4. For the examinations addressed in Relief Request RR-04-1 8, the examination procedure was written in accordance with ASME Section Xl, Appendix I and Appendix II1.